Loading...
HomeMy WebLinkAboutItem II.A PLAN COMMISSION STAFF REPORT MAY 4, 2021 ITEM II A: PUBLIC HEARING: ZONE CHANGE FROM NEIGHBORHOOD MIXED USE DISTRICT (NMU) TO SUBURBAN MIXED USE DISTRICT WITH A PLANNED DEVELOPMENT OVERLAY (SMU-PD) AND APPROVAL OF A GENERAL DEVELOPMENT PLAN AND SPECIFIC IMPLEMENTATION PLAN FOR PROPERTY LOCATED AT 1700 BLOCK W 9TH AVENUE GENERAL INFORMATION Applicant: The Morgan Partners, LLC Property Owner: KT Real Estate Services Holdings LLC Action(s) Requested: The applicant requests a zone change from the existing Neighborhood Mixed Use District (NMU) to Suburban Mixed Use District with a Planned Development Overlay (SMU-PD). The applicant also requests approval of General Development Plan and Specific Implementation Plan to allow for construction of an auto service facility. Applicable Ordinance Provisions: The Zoning Ordinance does not establish criteria relative to appropriateness of changing zoning from one classification to another but relies on the Comprehensive Plan and good planning principles. Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Background Information: The subject area consists of two vacant parcels, totaling approximately 0.65 acres in size, located on the south side of W 9th Avenue, east of S. Koeller Street. The parcels are zoned Neighborhood Mixed Use District (NMU). The surrounding area consists of commercial uses to the west and residential uses to the north, south, and east. The 2040 Comprehensive Land Use Plans recommends neighborhood commercial use for the subject area. Subject Site Existing Land Use Zoning Vacant NMU Recognized Neighborhood Organizations N/A Page 1 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 2 Adjacent Land Use and Zoning Existing Uses Zoning North Residential NMU South Residential SR-5 East Residential SR-5 West Commercial SMU-PD Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Recommendation Neighborhood Commercial ANALYSIS Zone Change The applicant is requesting a zone change to Suburban Mixed Use and also add a Planned Development Overlay for the vacant parcels. This request is intended to provide consistent zoning with the neighboring Kwik Trip site to the west (1725 W 9th Ave.), which will allow for Kwik Trip to obtain a small portion of the western vacant parcel for a cross-access drive to be constructed connecting the Kwik Trip parking lot with the subject site. Establishing a Planned Development Overlay on the site will also aid new development as it will provide some flexibility to the zoning ordinance. Staff is supportive of the proposed rezone as it will allow for the lot lines to be reconfigured appropriately for a connection to the Kwik Trip site, which will improve vehicular circulation for the site and provide relief to the amount of traffic currently using the Kwik Trip access. The SMU zoning is relatively consistent with the 2040 Comprehensive Land Use Recommendation of Neighborhood Commercial. The PD Overlay will also assist redevelopment of the site and provide further review to mitigate potential impacts on neighboring residential properties. Use The proposed development consists of a 3,176 sq. ft. auto service facility building (Jiffy Lube) and associated parking lot. Auto Service Facility is a conditional use within the SMU zoning district. The proposal includes a lot combination of the two subject parcels with the proposed building being centrally located within the newly created lot. The proposed use of site was discussed at a neighborhood meeting on February 6, 2020, with the neighbors in attendance being generally supportive of the proposed use. The request was also discussed at a Plan Commission workshop on March 16, 2021, with Plan Commission voicing support of the proposal. The vehicle service use is relatively consistent with the 2040 Comprehensive Land Use Recommendation of Neighborhood Commercial. Site Design/Access The proposed development will have one access from W 9th Avenue with a cross-access drive to the Kwik Trip site to the west. Access control variances are required for the development. Page 2 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 3 1. Reduced lateral clearance from W 9th Avenue. to 27.2’ where code requires a minimum of 75 feet. 2. Increased driveway width to 31’, where code allows a maximum width of 30 feet. Staff is in support of the Access Control Variances (ACV) and additional information related to them can be found in the related staff report. Staff recommends a condition requiring approval of the ACV. Proposed site plan. Required Provided Parking Spaces Minimum: 10 6 Impervious Surface Maximum: 70% of lot 67.4% of lot The parking lot provided on the site plan does not meet the minimum parking requirement of 1 space per 300 square feet of gross floor area for a vehicle service/repair use. Staff is supportive of a BSM to allow the reduced number of parking spaces to 6, as outdoor customer parking will not be needed as customers will drive their vehicles into the service bays of the building. The provided 6 stalls will be sufficient for employee parking as the applicant anticipates 2-3 employees at most times. The total impervious surface area for the site is 16,211 sq. ft., which is under the maximum impervious surface ratio for the Suburban Mixed Use (SMU) district. The plan includes a dumpster enclosure to the rear (south) of the building. The proposed 6’tall, CMU exterior, dumpster enclosure will need to be modified to include material(s) used on the principal building or wood to meet code requirements. This can be addressed during Site Plan Review. Page 3 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 4 Minimum Provided Front Setback 25 ft. 8.7 ft. Side Setback (east) 10 ft. 10 ft. Side Setback (west) 10 ft. 8 ft. Rear Setback 25 ft. 25 ft. The applicant is requesting Base Standard Modifications (BSMs) related to setbacks. The proposed front (north) and side (west) setbacks for the parking lot do not meet the minimum setbacks for the SMU district. These reduced setbacks are necessary to maintain the required side (east) and rear (south) setbacks from the neighboring residential properties. Staff is in support of the setback reductions as it will serve to provide a larger bufferyard from the residential properties. The proposed front yard setback reduction is consistent with setbacks of neighboring existing commercial properties. Specifically, the Kwik Trip parking lot to the west has an approximately 17’ front setback and the CVS Pharmacy site to the north (across W. 9th Ave.) has an approximate 10’ front yard setback for the parking lot. Staff does not have concerns with the reduced side yard (west) setback for the parking lot/dumpster enclosure as it is the result of a lot line shift to provide a cross-access connection. Storm Water Management/Utilities Storm water management plans have been provided and are being reviewed by the Department of Public Works. The applicant has been in discussion with the Department of Public Works regarding storm water management for the area. Finalized storm water management plans will need to be submitted and approved as part of the Site Plan Review processes. Page 4 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 5 Landscaping Proposed landscaping plan. Points Required Points Provided Building Foundation 109 (27.25 street facing side) 71 (24 street facing facade) Paved Area 62 (18.6 tall trees, 24.8shrubs) 42 (30 tall trees, 12 shrubs) Street Frontage 134 (67 medium trees) 112.5 (26.5 medium trees) Yards 64 104.9 Bufferyard (east) 76 Appropriate trees not provided Bufferyard (south) 60 102 Total 505 432.4 Building Foundation The landscape plan does not meet the total point requirement for building foundations. The landscaping plan shows perennial plantings contributing toward this point requirement at 1 point per planting, however the landscaping ordinance awards 1 landscaping point per 20 perennial plantings. The perennials will need to be swapped out with shrubs to meet this requirement, which can be addressed as part of the Site Plan Review process. Page 5 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 6 Paved Area The paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area is not being met. The code further specifies 30% of all points will be devoted to medium or tall trees and 40% will be devoted to shrubs. The landscaping plan is meeting the tall tree requirement, but not the shrub point requirement. As with the building foundation plantings, the applicant will need to swap out the perennials shown for shrubs to meet the point requirements. Code also requires a tall deciduous/shade tree at the ends of all parking rows and drive entrances. The plan shows two tall trees (Honey Locust) being removed for the cross-access drive. These tall trees will need to be replaced at the end of the cross-access drive (one on each side) to meet this requirement. Street Frontage Code requires 100 points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. The proposed perennials will again need to be swapped out with shrubs to meet this requirement. Also, a tall tree is shown as contributing toward the required medium tree point requirement. This will need to be exchanged for medium trees to meet the 50% medium tree point requirement. Yards Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area. Per the provided plan, yard landscaping requirements are being met. The landscaping schedule shows deciduous plantings contributing toward the bufferyard point requirement. Staff has included these deciduous plantings in the “yard” category as bufferyard plantings must be trees appropriate for screening (evergreen trees). Bufferyards A 0.4 opacity bufferyard is required along the east and south property lines as the subject site is bordering a Single Family Residential-5 (SR-5) zoning district on those sides. New 6’ tall solid fencing and evergreen trees are shown along the south property line, which meet this requirement. A combination of existing 6’ tall solid wood fencing and deciduous trees are shown along the east property line. Evergreen trees will need to be added/exchanged along the east property line to meet this requirement as bufferyard landscaping must consist of “trees appropriate for screening”. The code further specifies that 50% of the required landscaping points must be located on the exterior side of the fencing. The landscape plan shows an existing 6’ tall solid fence along the east property line, with all landscaping on the inside of it. Staff is supportive of a BSM to allow all east bufferyard landscaping to be placed on the inside of the fencing to preserve the existing fence. Staff is recommending that 50% of the landscaping be placed on the exterior of the south bufferyard fencing to meet the requirement as that fencing will be newly constructed. Page 6 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 7 Overall Landscaping The applicant has appropriately distributed plantings to meet landscaping ordinance requirements. However, as previously noted, certain species of plantings will need to be added/exchanged to meet specific landscaping requirements. Staff will work with applicant to verify that appropriate species of plantings are provided to satisfy all landscaping code requirements for site plan review approval. Signage The proposed site plan shows a ground sign placed along W 9th Avenue matching the setback of the parking stalls (8.7’). Staff is supportive of a BSM for the reduced ground sign setback to 8.7’, where code requires a 25’ front setback, as the reduced setback is consistent with the reduced sign setbacks for neighboring Kwik Trip and Walgreens sites along W 9th Avenue of approximately 12’ and 15’ respectively. A rendering of the ground sign has not been included with this request. Staff is recommending a condition that the sign be a dual post or monument sign, which are limited to a maximum height of 15’ in the SMU district. Staff is also recommending a condition that a minimum of 15 landscaping points shall be provided around the ground sign to offset the reduced setback. The ground sign will be limited to a maximum area of 1 sq. ft. per linear foot of public right-of-way frontage. Submitted building renderings include wall signage which appears to be in compliance with the code maximum sign area of 1 sq. ft. of signage per linear foot of building frontage. Final signage plans will be addressed under a separate building permit. Site Lighting The plan set did not include a photometric plan. The lighting plan will need to be compliant with all lighting standards, providing the minimum 0.4 fc lighting level for all parking/circulation areas and may not exceed 0.5 fc at the property lines.. This can be addressed during Site Plan Review. Page 7 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 8 Building Facades Proposed building elevations. Building Materials Section 30-243 of the zoning ordinance requires commercial buildings to be clad in 50% Class I materials. The petitioner has provided building elevations for the building which include stone veneer, brick veneer, and storefront glass for a total of near 100% class I materials an all building facades. The significant increase in class I materials beyond code requirement serves to offset the BSMs that the applicant has requested. Overall Site The applicant is requesting BSMs related to number of parking stalls, setbacks, and a specific landscaping requirement. To offset the requested BSMs, the applicant has significantly enhanced the appearance of the building by exceeding the class I material requirement. The applicant will also be required to provide additional landscaping (around the ground sign) to improve the appearance of the site from the public right-of-way. Staff is comfortable that the requested BSMs are being adequately offset and the overall site is complimentary to the surrounding area. Page 8 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 9 FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. Staff recommends approval of the rezone, General Development Plan and Specific Implementation Plan and the findings listed above with the proposed following conditions: 1. Approval of Access Control Variances for reduced lateral clearance and increased driveway width. 2. BSM to allow reduced number of parking spaces to 6, where code requires 10 spaces. 3. BSM to allow reduced front yard pavement setback to 8.7’ (north). 4. BSM to allow reduced front yard ground sign setback to 8.7’ (north). 5. BSM to allow reduced side yard pavement setback to 8’ (west). 6. BSM to allow all east bufferyard landscaping to be placed on the inside of the 6’ solid fencing. 7. A minimum of 15 landscaping points shall be provided around the ground sign. 8. Final landscaping plan shall be reviewed and approved by the Department of Community Development. Page 9 ITEM II A: Rezone, GDP & SIP 1700 Blk W 9th Ave. 10 9. Final lighting plan shall be reviewed and approved by the Department of Community Development. Page 10 Sign_______ Staff ________ Date Rec’d ________ City of Oshkosh Application Zoning Map Amendment (Rezoning) **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: _________________________________________________________________________________ Date: ____________ Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference:  Phone  Email Status of Petitioner (Please Check):  Owner  Representative  Tenant  Prospective Buyer Petitioner’s Signature (required): _______________________________________________________________ Date: ____________ OWNER INFORMATION Owner(s): __________________________________________________________________________________ Date: ____________ Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference:  Phone  Email Ownership Status (Please Check):  Individual  Trust  Partnership Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner’s Signature: ___________________________________________________________________ Date: ____________ ZONING AND DEVELOPMENT INFORMATION Address/Location of Rezoning Request: _________________________________________________________________________ Tax Parcel Number(s): _________________________________________________________________________________________ Rezone property from: ___________________________________________ to ___________________________________________ Purpose for Rezoning:__________________________________________________________________________________________ ____________________________________________________________________________________________________________ Describe existing property development and land use: ________________________________________________________________ ____________________________________________________________________________________________________________ Describe proposed development and/or proposed land use: ____________________________________________________________ ____________________________________________________________________________________________________________ Proposed time schedule for development and/or use of the property: ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ Zoning Adjacent to the Site: North: _________________________________________________________________________ South: _________________________________________________________________________ East: _________________________________________________________________________ West: _________________________________________________________________________ SUBMIT TO: Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 PHONE: (920) 236-5059 The Morgan Partners, LLC 4/5/21 601 Oregon St Ste B Oshkosh WI 54901 320-267-2558 ed@themorganpartners.com x 4/5/21 KT Real Estate Services Holdings LLC 4/5/21 PO Box 2107 La Crosse WI 54602 608-791-7408 smcconaghy@kwiktrip.com X 1711/1719 W. 9th Avenue NMU SMU-PD Allow for development of Jiffy Lube Vacant Land Jiffy Lube oil change facility Construction intended for summer 2021, completion estimated by winter 2021 1308490200/1308490205 NMU SMU-PD Page 11 2 SUBMITTAL REQUIREMENTS – Must accompany the application to be complete. (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy)  Map of the immediate area showing property involved. Area to be rezoned must be outlined in color  A site plan drawn to readable scale showing present status of property and proposed development  Street address, adjacent streets, intersections and any other information or landmarks to help identify the property  Location of existing uses, structures, fences and signs and location of proposed uses, structures, fences and signs  A narrative statement explaining the zone change and discussion of the project  Application fees are due at time of submittal. Make check payable to City of Oshkosh.  Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE SUMMARY OF PROCESS The City of Oshkosh Plan Commission and Common Council act on all amendments to the Official Zoning Map. The petitioner or owner should be present at both the Plan Commission and Common Council meetings to discuss and answer questions regarding the request. The application package is reviewed by Planning Services staff to determine conformance with adopted city plans, zoning requirements and development standards. A staff recommendation is prepared for consideration by the Plan Commission and Common Council. The petitioner will be provided with a copy of the staff report and meeting notice several days prior to the Plan Commission meeting. The staff report and meeting notice will also be available on the City’s website. No notice is sent to the petitioner or owner regarding the Common Council’s consideration of the request. Petitioners and owners are encouraged to contact Planning Services staff to find out when the request will be sent to the Common Council for review. Neighborhood opinion is an important factor in the decision-making process. If the proposed development is expected to have significant impact on other properties, the petitioner may be required to conduct a neighborhood meeting to solicit public input prior to action by the Plan Commission and City Council. Planning Services staff is available to offer assistance in compiling a mailing list for the neighborhood meeting. If deemed appropriate, notification by mail informing the property owners within 100 feet of the subject property of the proposal may substitute for the public meeting. Please note that a meeting notice will be mailed to all abutting property owners regarding your request. Within 90 days of filing a complete application, Plan Commission shall hold a public hearing to consider the request. Within 60 days of the public hearing, the Plan Commission may make a written report to the Common Council with recommendations regarding the proposal. The Plan Commission’s report is advisory only. The Common Council will make the final decision regarding all zone change requests. The Plan Commission may lay over requests to subsequent meetings if incomplete information is provided or additional questions or concerns are raised at the meeting. After the Plan Commission makes its recommendation, the request will be forwarded to the Common Council for consideration. This generally occurs three weeks after the Plan Commission meeting depending on the date the Council meeting is scheduled (the Council meets on the 2nd and 4th Tuesday of every month) and on the availability of a legal description for the zone change. Wisconsin State Statutes require a zone change to be published as Class II notice in the local newspaper, the City takes care of this publication requirement prior to the Council meeting. The Common Council may approve the Official Zoning Map amendment as originally proposed, may approve the proposed amendment with modifications, or may deny approval of the proposed amendment. If the Official Zoning Map amendment is approved, the Ordinance is published in the newspaper on the following Saturday and will be effective on Sunday. City administrative offices are notified of the effective date of the Ordinance and will make changes to the Official Zoning Map accordingly. For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm Page 12 Sign_______ Staff ________ Date Rec’d ________ City of Oshkosh Planned Development Application For General Development Plan or Specific Implementation Plan **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: _________________________________________________________________________________ Date: ____________ Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference:  Phone  Email Status of Petitioner (Please Check):  Owner  Representative  Tenant  Prospective Buyer Petitioner’s Signature (required): _______________________________________________________________ Date: ____________ OWNER INFORMATION Owner(s): __________________________________________________________________________________ Date: ____________ Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference:  Phone  Email Ownership Status (Please Check):  Individual  Trust  Partnership  Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner’s Signature: ___________________________________________________________________ Date: ____________ TYPE OF REQUEST:  General Development Plan (GDP)  General Development Plan (GDP) Amendment  Specific Implementation Plan (SIP)  Specific Implementation Plan (SIP) Amendment SITE INFORMATION Address/Location of Proposed Project: __________________________________________________________________________ Proposed Project Type: ________________________________________________________________________________________ Current Use of Property: ________________________________________________________________Zoning: ________________ Land Uses Surrounding Your Site: North: _________________________________________________________________________ South: _________________________________________________________________________ East: _________________________________________________________________________ West: _________________________________________________________________________  It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal.  Application fees are due at time of submittal. Make check payable to City of Oshkosh.  Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm SUBMIT TO: Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, WI 54901 PHONE: (920) 236-5059 The Morgan Partners, LLC 4/5/21 601 Oregon St Ste B Oshkosh WI 54902 920-267-2558 ed@themorganpartners.com X KT Real Estate Holdings LLC 4/5/21 PO Box 2107 La Crosse WI 54602 608-791-7408 smcconaghy@kwiktrip.com x 1711/1719 W. 9th Avenue Development of oil change facility Vacant Land NMU Commercial Residential- Single Family Homes Residential- Single Family Homes Commercial- Kwik Trip 4/2/21 4/5/21 Page 13 2 SUBMITTAL REQUIREMENTS – Must accompany the application to be complete. (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy) The following information must be provided in order for the application to be considered complete and able to be scheduled for Plan Commission Review. Please use the checklist below to determine the required information to be submitted at the time of application. If all information below cannot be provided at the time of application, please request a waiver in writing to the Division’s Director or designee.  A General Development Plan (GDP) submittal, per Section 30-387(C)(4), shall include the following items (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy):  General location map of the subject site depicting:  All lands for which the Planned Development is proposed and other lands within 100 feet of the boundaries of the subject property.  Current zoning of the subject site and abutting properties, and the jurisdiction(s) that maintains that control.  A graphic scale and north arrow.  Generalized site plan showing the pattern or proposed land uses, including:  General size, shape, and arrangement of lots and specific use areas.  Basic street pattern and pattern of internal drives.  General site grading plan showing preliminary road grades.  Basic storm drainage pattern, including proposed on-site stormwater detention.  General location of recreational and open space areas, including designation of any such areas to be classified as common open space.  Statistical data, including:  Minimum lot sizes in the development.  Approximate areas of all lots.  Density/intensity of various parts of the development.  Building coverage.  Landscaping surface area ratio of all land uses.  Expected staging.  Conceptual landscaping plan.  General signage plan.  General outline of property owners association, covenants, easements, and deed restrictions.  A written description of the proposed Planned Development, including:  General project themes and images.  The general mix of dwelling unit types and/or land uses.  Approximate residential densities and nonresidential intensities.  General treatment of natural features.  General relationship to nearby properties and public streets.  General relationship of the project to the Comprehensive Plan or other area plans.  Proposed exceptions from the requirements of the Zoning Ordinance.  Traffic Impact Analysis (TIA), if deemed necessary by the Director of Planning Services, or designee.  A Specific Implementation Plan (SIP) submittal, per Section 30-387(C)(5), shall include the following items. Note that the area included in an SIP may be only a portion of the area included in a previously approved GDP (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy):  An existing conditions map of the subject site depicting the following:  All lands for which the Planned Development is proposed and other lands within 100 feet of the boundaries of the subject site.  Current zoning of the subject property and all abutting properties, and the jurisdiction(s) that maintains that control.  Existing utilities and recorded easements.  All lot dimensions of the subject site.  A graphic scale and a north arrow.  An SIP map of the proposed site showing at least the following:  Lot layout and the arrangements of buildings.  Public and private roads, driveways, walkways, and parking facilities.  Specific treatment and location of recreational and open space areas, including designation of any such areas to be classified as common open space. Page 14 3  Proposed grading plan.  Specific landscaping plan for the subject site, specifying the location, species, and installation size of plantings. The landscaping plans shall include a table summarizing all proposed species.  Architectural plans for any nonresidential buildings, multi-family structures, or building clusters, other than conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor area, bulk, and visual character of such buildings.  Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and walkways.  Signage plan for the project, including all project identification signs, concepts for public fixtures and signs, and group development signage themes that may or may not vary from City standards or common practices.  Specific written description of the proposed SIP including:  Specific project themes and images.  Specific mix of dwelling unit types and/or land uses.  Specific residential densities and nonresidential intensities as described by dwelling units per acre, and landscaping surface area ratio and/or other appropriate measures of density and intensity.  Specific treatment of natural features, including parkland.  Specific relationship to nearby properties and public streets.  Statistical data on minimum lot sizes in the development, the precise areas of all development lots and pads; density/intensity of various parts of the development; building coverage, and landscaping surface area ratio of all land uses; proposed staging; and any other plans required by Plan Commission.  A statement of rationale as to why PD zoning is proposed. This statement shall list the standard zoning requirements that, in the applicant’s opinion, would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project.  A complete list of zoning standards that would not be met by the proposed SIP and the location(s) in which such exceptions/base standard modifications would occur.  Phasing schedule, if more than one development phase is intended.  Agreements, bylaws, covenants, and other documents relative to the operational regulations of the development and particularly providing for the permanent preservation and maintenance of common open areas and amenities.  A written description that demonstrates how the SIP is consistent with the approved GDP and any and all differences between the requirements of the approved GDP and the proposed SIP. I hereby certify that to the best of my knowledge all required application materials are included with this application. I am aware that failure to submit the required completed application materials may result in denial or delay of the application request. Applicant’s Signature (required): _________________________________ Date: _____________________ 4/2/21 Page 15       Mr. Mark Lyons  Planning Director  City of Oshkosh  215 Church Avenue  Oshkosh, WI 54901      RE: Jiffy Lube Development – Oshkosh, WI     Mr. Lyons:   Please allow this letter to serve as our narrative relating to a Planned Development located in adjacent  to Kwik Trip located at 1725 W. 9th Avenue, Parcel ID #1308480000. The actions requested and  described herein include an SIP amendment for the current Kwik Trip parcel and a new PD zoning for the  adjacent parcels (#1308490200 and #1308490205) which will be combined via a CSM also being  currently requested.   The existing use of this portion of these properties is as a Kwik Trip store and adjacent undeveloped  vacant land, formerly the Pool Center property. This adjacent property was acquired by Kwik Trip in  2017 by Kwik Trip. The Kwik Trip property, zoned SMU‐PD will be expanded slightly to the east via a CSM  to allow a cross‐access driveway to be constructed between their parcel and the adjacent parcels,  currently zoned NMU. Our applications currently request approval of the CSM, amendment of the  existing Kwik Trip PD, and approval of a GDP/SIP for the adjacent property.     Necessary base standard modifications required for this plan are, in our review, limited to the  construction of a shared access driveway between the parcels to allow for cross access and a reduction  in parking stalls. These BSMs are, in our opinion, warranted due to the nature of the development and  the nature of the business occupying the currently undeveloped parcel. Cross access between the two  adjacent parcels will provide relief to the amount of traffic currently using the driveway on the Kwik Trip  parcel, as well as provide access in the even the median extending from the roundabout at 9th and  Koeller is ever extended. Due to the nature of Jiffy Lube’s business, in which customers remain in their  vehicles as they enter and exit the service bays of the building, parking is effectively accomplished inside  the building in addition to the stalls in front of the building. Use of the parking stalls in front of the  building will be typically limited to employee parking, which is utilized by 2‐3 employees at most times.    Please note that the proposed Jiffy Lube building will be constructed from a combination of multiple  types of brick veneer, natural stone, and storefront/overhead door glass. These materials, which  constitute almost 100% of each façade of the building (excepting small area of metal flashings along  rooflines), are all Class 1 materials per the City of Oshkosh’s design standards, well in excess of what is  Page 16 required. We believe this building will be a higher quality of construction than many buildings currently  found along 9th Avenue and Koeller Rd as a result.  As an oil change facility, there will be no additional residents on site and limited employees during  regular business hours. Any onsite treatment of stormwater that may be required prior to draining into  the municipal stormwater system will be handled via biofiltration basins, bioswales or other methods to  be approved by the Department of Public Works.  We do not anticipate any negative impacts on any of  the adjoining properties from this development, as the nearby properties are generally commercial in  nature, and any residential properties nearby are sufficiently buffered from any negative effects by  fencing, bermrs and additional transitional yard setbacks as may be required. Traffic generated from this  development will be in keeping with the traffic currently generated by Kwik Trip, Walgreens, CVS and  other commercial users due to the low trip generation of the Jiffy Lube use.    Per the application form, below is our statement regarding any negative impacts on the following issues:    We do not believe there will be any negative health, safety or general welfare impacts on any of  the surrounding land as a result of setback compliance and buffering elements between  commercial and residential uses.    Pedestrian and vehicular circulation and safety will be handled within the previously constructed  shared sidewalks and driveways, and will not meaningfully impact the amount of traffic being  routed towards the public rights‐of‐ways in numbers that would create traffic problems.    This project will not create any additional noise, air, water or other pollutions‐ in fact, it will  assist in the redevelopment of a site currently developed with a deteriorating asphalt and gravel  parking lot, thereby having a positive environmental impact.    It will not impact the demand for or availability of public services in a negative way, as all  necessary public services are in the vicinity and have adequate capacity to serve this project.    There will be no negative impact on the character or future development of the area, as this is a  commercial area being developed with commercial uses in keeping with the surrounding areas.     Respectfully,     Ed Bowen   The Morgan Partners, LLC    Page 17 ∆Κ∆ΒΣΘΗΒ Β≅Θ ΒΓ≅ΘΦΗΜΦ ΡΣ≅ΣΗΝΜ IP IP IP 00 ∆ΜΣ−[∆ΩΗΣ ΡΟΚΗΣ Θ≅ΗΚ Ε∆ΜΒ∆5& ςΝΝΧ Ε∆ΜΒ∆ 5& ςΝΝΧ Ε∆ΜΒ∆ Μ∆ΗΦΓΑΝΘΡ 5& ςΝΝΧ Ε∆ΜΒ∆Μ∆ΗΦΓΑΝΘΡ 3& ΒΓ≅ΗΜ ΚΗΜϑ Ε∆ΜΒ∆IR IR W. 9TH AVE. (TRUCK ROUTE) ΘΗΛ 660−6/ΗΜΥ− 656−6ς ΗΜΥ− 656−8Ρ ΗΜΥ− 657−/ ΘΗΛ 660−/7 ΗΜΥ− 656−1 Μ%ς ΗΜΥ− 656−3 ΘΗΛ 660−6/ ΗΜΥ− 657−0 ΕΤΚΚ ΝΕ Χ∆ΑΘΗΡ ∆ ΗΜΥ− 657−0 ΘΗΛ 660−1+ Ρ ΗΜΥ− 7! ΟΥΒ + ΡΤΛΟ<656−63 Κ≅ΜΧΡΒ≅Ο∆ ΑΤΕΕ∆ΘΞ≅ΘΧ Κ≅ΜΧΡΒ≅Ο∆ ΑΤΕΕ∆ΘΞ≅ΘΧΟΘΝΟΝΡ∆Χ ΟΘΝΟ∆ΘΣΞ ΚΗΜ∆5 ΕΕ∆<661−// ≅ΘΒΓ− ΕΕ∆<0//−// ΟΘΝΟΝΡ∆Χ ΑΤΗΚΧΗΜΦ 2+018 Ρ−Ε− 8−4&7&7&25−4&04−4&17−5&5&17&5&4& 4&02−4&07−4&20& 22−0&68−2&4−0&10−1&0/3−7&00−6&15−8&5& 10&17& 15−4&5−5& 06−4&04&61−1&01−4&00−2&Θ03−4&Θ 3 − 4 &Θ8−4&12−1&18&Θ3−4&3&0−4& 4& 32−2&1&5−7&3& 5−4& Θ 3 − 4 & 5&07&8−1&1−4&14&16−6&7& 8−4&3−8&0&20&8/−7↓7−6&Ρ77↓ 23& 30!∆1−7&01−1&02−2&02−5&0/&7−6&4−3&4−0&5−6&05−6& 0 0 0 0 0 0 1 07≅ 07≅ 1 1 2 2 2 3 3 3 4 2 2 4 3 3 3 3 3 4 32 3 3 3 3 55 5 6 7 8 0/ 00 00 01 0202 2 2 03 04 05 05 05 05 06 06 07 Θ 3 − 4 & 1 07 Θ3−4&02−2&ΡΛΤ,ΟΧ ΡΛΤ,ΟΧ ΡΘ,41& /−6& 08 5≅ 5 4 5≅ 5 42 Θ3/−4& Θ28−4& Θ0 3 − 4 & 5&\A1;6'4−3&Β0// APPROVED BY:CHECKED BY:ΧΘ≅ςΗΜΦ ΕΗΚ∆9 Ο9[66//,6688[6647≅ , Ιηεεξ Κταδ[χϖφκµρ[6647≅,Β0//,ΡΗΣ∆−χϖφ Κ≅ΞΝΤΣ9 Β0//ΟΚΝΣΣ∆Χ9 Λθ 20+ 1/10 , 3906ολ ΟΚΝΣΣ∆Χ ΑΞ9 µσγµοΘ∆Η Μν− ΒΓϑ&ΧΑΞΘ∆ΥΗΡΗΝΜΧ≅Σ∆ ΟΓΝΜ∆9 604−564−8673+Ε≅Ω9 604−564−3/5/ ς≅ΤΡ≅Τ+ ςΗΡΒΝΜΡΗΜ 433/03/7/ Μ− 1/σγ ≅Υ∆ΜΤ∆ DATE:DRAWN BY: SURVEYED BY: DESIGNED BY: ΡΓ∆∆Σ REI Engineering, INC. ENGINEERING, SURVEYING CIVIL & ENVIRONMENTAL ∆Λ≅ΗΚ9 Λ≅ΗΚ?Θ∆Ηδµφηµδδθηµφ−βνλ ΙΗΕΕΞ ΚΤΑ∆ ΝΡΓϑΝΡΓ+ ςΗ 438/1 ςΗΜΜ∆Α≅ΦΝ ΒΝΤΜΣΞ MEM OTHERS JJB MEM 03/31/2021 6647≅0/1/ ϑ∆Ξ∆Χ ΜΝΣ∆Ρ 0− ≅ΡΟΓ≅ΚΣ Ο≅Υ∆Λ∆ΜΣ− Ρ∆∆ Χ∆Σ≅ΗΚ ≅.Β7//− 1− 3! ΒΝΜΒΘ∆Σ∆ ΡΗΧ∆ς≅Κϑ− Ρ∆∆ Χ∆Σ≅ΗΚ Α.Β7//− 2− 07! ΒΤΘΑ ≅ΜΧ ΦΤΣΣ∆Θ− Ρ∆∆ Χ∆Σ≅ΗΚ Β.Β7//− 3− 07! Θ∆Ι∆ΒΣ ΒΤΘΑ ≅ΜΧ ΦΤΣΣ∆Θ− Ρ∆∆ Χ∆Σ≅ΗΚ Β.Β7//− 4− ΣΘ≅ΜΡΗΣΗΝΜ ΒΤΘΑ % ΦΤΣΣ∆Θ− Ρ∆∆ Χ∆Σ≅ΗΚ Ε.Β7//− 5− ΡΣ≅ΜΧ≅ΘΧ ΒΤΘΑ % ΦΤΣΣ∆Θ Σ∆ΘΛΗΜ≅ΣΗΝΜ− Ρ∆∆ Χ∆Σ≅ΗΚ Φ.Β7//− 5≅− ΣΘ≅ΜΡΗΣΗΝΜ ΒΤΘΑ ΕΘΝΛ ΕΚΤΡΓ ΣΝ ΕΤΚΚ Γ∆ΗΦΓΣ− Θ∆Ε∆Θ ΣΝ ΡΓ∆∆Σ Β1/0 ΕΝΘ Χ∆Σ≅ΗΚΡ− 6− Γ≅ΜΧΗΒ≅Ο Ο≅ΘϑΗΜΦ ΡΟ≅Β∆Ρ % ΡΣΘΗΟΗΜΦ− Ρ∆∆ Χ∆Σ≅ΗΚ Γ.Β7//− 7− Υ≅Μ ≅ΒΒ∆ΡΡΗΑΚ∆ Γ≅ΜΧΗΒ≅Ο ΡΗΦΜ− Ρ∆∆ Χ∆Σ≅ΗΚ Η.Β7//− 8− ΣΞΟ∆ 1 Γ≅ΜΧΗΒ≅Ο Θ≅ΛΟ− Ρ∆∆ Χ∆Σ≅ΗΚ Ι.Β7//− 0/− 06−4&Ω04& Θ∆ΕΤΡ∆ ≅Θ∆≅, 5! ΒΝΜΒΘ∆Σ∆ Ο≅Χ ςΗΣΓ 5!Ω5! ς∆ΚΧ∆Χ ςΗΘ∆ Λ∆ΡΓ− Θ∆Ε∆Θ ΣΝ ≅ΘΒΓΗΣ∆ΒΣΤΘ≅Κ ΟΚ≅ΜΡ ΕΝΘ ∆ΜΒΚΝΡΤΘ∆ Χ∆Σ≅ΗΚΡ− 00− Ο≅ΗΜΣ∆Χ ΡΣΘΗΟΗΜΦ+ Ξ∆ΚΚΝς− ∋ΣΞΟΗΒ≅Κ( 01− ΡΗΦΜΡ ΑΞ ΝΣΓ∆ΘΡ− 02− 2/! ΒΤΘΑ ≅ΜΧ ΦΤΣΣ∆Θ− Ρ∆∆ Χ∆Σ≅ΗΚ Χ.Β7//− 03− 07! ΧΘΗΥ∆ς≅Ξ ΒΤΘΑ % ΦΤΣΣ∆Θ− Ρ∆∆ Χ∆Σ≅ΗΚ ∆.Β7//− 04− ΒΝΜΒΘ∆Σ∆ ΧΘΗΥ∆ς≅Ξ ≅ΟΘΝΜ− Ρ∆∆ Χ∆Σ≅ΗΚ Κ.Β7//− 05− 5! ΒΝΜΒΘ∆Σ∆ Ο≅Υ∆Λ∆ΜΣ− Ρ∆∆ Χ∆Σ≅ΗΚ ϑ.Β7//− 06− ΟΘΝΟΝΡ∆Χ ςΝΝΧ ΟΘΗΥ≅ΒΞ Ε∆ΜΒΗΜΦ ΑΞ ΝςΜ∆Θ− 07− ΡΚΝΟ∆ ΡΗΧ∆ς≅Κϑ ? 0190 Λ≅Ω− 07≅− ΡΚΝΟ∆ ΡΗΧ∆ς≅Κϑ ≅ΜΧ ΒΤΘΑ ? 0190 Λ≅Ω− 08− ΡΣΝΟ ΡΗΦΜ− ΜΝΣ∆Ρ9 ∋≅( ΑΤΗΚΧΗΜΦΡ ≅ΜΧ Ο≅ΘϑΗΜΦ ΡΟ≅Β∆Ρ ≅Θ∆ Ο≅Θ≅ΚΚ∆Κ ≅ΜΧ Ο∆ΘΟ∆ΜΧΗΒΤΚ≅Θ ΣΝ Θ∆Ε∆Θ∆ΜΒ∆ ΚΗΜ∆ Κ≅Α∆Κ∆Χ+ Ρ77↓23&30!∆+ ≅Ρ Σ≅ϑ∆Μ ΕΘΝΛ ΣΓ∆ ΡΤΘΥ∆Ξ− ∋Α( ≅ΚΚ ΧΗΛ∆ΜΡΗΝΜΡ ≅Θ∆ ΣΝ ΣΓ∆ Α≅Βϑ ΝΕ ΒΤΘΑ ΝΘ Ε≅Β∆ ΝΕ ΗΜΣ∆ΦΘ≅Κ ΒΤΘΑ+ ΤΜΚ∆ΡΡ ΝΣΓ∆ΘςΗΡ∆ ΜΝΣ∆Χ− ∋Β( ΟΘΗΥ≅Σ∆ % ΟΤΑΚΗΒ ΤΣΗΚΗΣΞ ΒΝΝΘΧΗΜ≅ΣΗΝΜ ΗΜΒΚΤΧΗΜΦ Φ≅Ρ+ ∆Κ∆ΒΣΘΗΒ+ ≅ΜΧ Σ∆Κ∆ΒΝΛΛΤΜΗΒ≅ΣΗΝΜΡ ΡΓ≅ΚΚ Α∆ ΒΝΝΘΧΗΜ≅Σ∆Χ ΑΞ ΣΓ∆ ΒΝΜΣΘ≅ΒΣΝΘ− ∋Χ( ∆ΩΗΡΣΗΜΦ ΒΤΘΑ ΒΤΣ ΣΝ Α∆ ΒΚΝΡ∆Χ Ο∆Θ ΒΗΣΞ ΝΕ ΝΡΓϑΝΡΓ ΡΣ≅ΜΧ≅ΘΧΡ− / ΡΒ≅Κ∆ΡΗΣ∆ ΟΚ≅Μ NAPΟΘΝΟΝΡ∆Χ ΟΘΝΟ∆ΘΣΞ ΚΗΜ∆Page 18 REZONE/GDP/SIP 1711-1719 W 9TH AVE PC: 05-04-21 AMIE L BROWNFIELD 1636 W 9TH AVE OSHKOSH, WI 54902 JASON M/MELISSA S WATKINS 930 MORELAND ST OSHKOSH, WI 54902 JEFFERY L BECKER LIVING TRUST 925 S WESTFIELD ST OSHKOSH, WI 54902 JORDAN A/ALYSSA J BELTON 722 S WESTFIELD ST OSHKOSH, WI 54902 JOSEPH MEZZANO REV LIVING TRUST 1703 W 9TH AVE OSHKOSH, WI 54902 KELLY A TRIEMSTRA 928 MORELAND ST OSHKOSH, WI 54902 MARK S/KRISTINE D GRAF 915 S WESTFIELD ST OSHKOSH, WI 54902 NATHAN/DANIELLE POTRATZ N4764 MARTIN RD FOND DU LAC, WI 54937 ROBERT A ILG III TRST/HOUSER FAM TRST 1235 NORTH LOOP W STE 205 HOUSTON, TX 77008 STEPHANIE M MCAULY 909 S WESTFIELD ST OSHKOSH, WI 54902 VICKI L GINTNER 932 MORELAND ST OSHKOSH, WI 54902 THE MORGAN PARTNERS, LLC 601 OREGON ST STE B OSHKOSH, WI 54902 KT REAL ESTATE HOLDINGS LLC PO BOX 2107 LA CROSSE, WI 54602 Page 19 W 9TH AVW 9TH AV SSWWEESSTTFFIIEELLDDSSTTW 7TH AVW 7TH AV MORELAND STMORELAND STREICHOW STREICHOW STW 7TH AVW 7TH AV S WESTFIELD STS WESTFIELD STC:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 4/6/2021 1 in = 120 ft1 in = 0.02 mi¯1711-1719 W 9TH AVE1711-1719 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 20 I SR-5 SMU I I SR-3 SMU-PD HI MR-12 I SMU-PD I-PD DR-6 SMU-PD MR-12 MR-12 I MR-12 NMU MR-12 SMU-PD I-PD MR-12 !"#$41 !"#$41 SSKKOOEELLLLEERRSSTTWW 99TT HH AA VVS WASHBURN STS WASHBURN STW 5TH AVW 5TH AV REICHOW STREICHOW STS EAGLE STS EAGLE STS WESTFIELD STS WESTFIELD STBISMARCK AVBISMARCK AV LILAC STLILAC STARMORY PLARMORY PLMORELAND STMORELAND STW 6TH AVW 6TH AV W 7TH AVW 7TH AV OSBORN AVOSBORN AVW 4TH AVW 4TH AV W 3RD AVW 3RD AV WINDSOR STWINDSOR STCRYSTAL SPRINGS AVCRYSTAL SPRINGS AV DDEEVVOONNSSHHIIRREEDDRRDICKINSON AVDICKINSON AV CCAANNTTEERRBBUURRYYDDRRCAMBRIDGE AVCAMBRIDGE AVS MEADOW STS MEADOW STW 7TH AVW 7TH AV S WESTFIELD STS WESTFIELD STWW77TT HH AAVV MR-12-PD C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 4/6/2021 1 in = 500 ft1 in = 0.09 mi¯1711-1719 W 9TH AVE1711-1719 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 21 C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 4/6/2021 1 in = 100 ft1 in = 0.02 mi¯1711-1719 W 9TH AVE1711-1719 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 22