PLAN COMMISSION STAFF REPORT APRIL 6, 2021
ITEM VI A: GENERAL DEVELOPMENT PLAN FOR SOUTHWEST CORNER OF WEST
SOUTH PARK AVENUE AND WEST 20TH AVENUE
GENERAL INFORMATION
Applicant: Todd Waller – Lee Associates
Owner: Patrick & Beverly Ruedinger
Action(s) Requested:
The applicant requests approval of a General Development Plan for commercial development at
the southwest corner of W South Park Avenue and W 20th Avenue.
Applicable Ordinance Provisions:
Planned Development standards are found in Section 30-387 of the Zoning Ordinance.
Property Location and Background Information:
The subject site consists of one 1.38 acre parcel located at the southwest corner of W South Park
Avenue and W 20th Avenue, which was the former Packer Pub site. The surrounding area
consists primarily of commercial land uses as well as residential uses along Ripon Lane.
Subject Site
Existing Land Use Zoning
Vacant Commercial SMU
Adjacent Land Use and Zoning
Existing Uses Zoning
North Commercial SMU
South Commercial & Residential SMU
East Commercial SMU
West Commercial SMU
Recognized Neighborhood Organizations
N/A
Comprehensive Plan
Comprehensive Plan Land Use Recommendation Land Use
2040 Land Use Recommendation Interstate Commercial
ITEM VII A: GDP SW corner W 20th Ave./W South Park Ave. 2
ANALYSIS
The applicant is proposing to divide the subject parcel into two commercial lots. A CSM will be
required to split the existing parcel, and has been submitted to the Department of Community
Development for review. As proposed, the two commercial sites will have a shared access off of
W 20th Avenue and W South Park Avenue, which will require a cross access agreement. The
plan also shows an internal driveway connecting to the future commercial development to the
south (La Sures site). Access control variances will be needed for number of driveway
approaches, driveway width, and lateral clearance, which will be addressed under the
subsequent item.
The previous item was for a rezone of the subject site to include a Planned Development (PD)
Overlay. With approval of the rezone, the applicant is requesting base standard modifications
(BSMs) for reduced front setback along W 20th Ave. for the parking lots on both sites to 10.7’
where code requires a 25’ setback. The applicant is also requesting a BSM to allow the
dumpster enclosure on the western site to be placed between the building and public right-of-
way (W South Park Ave.). The site plan appears to be compliant with all other dimensional
requirements.
This proposal was discussed at a Plan Commission workshop on February 16, 2021. Plan
Commission voiced support for the concept plans and preferred a single access off of W 20th Ave.,
as being proposed by the applicant.
ITEM VII A: GDP SW corner W 20th Ave./W South Park Ave. 3
Staff is supportive of both of the requested BSMs as the unique lot configuration results in
difficulties meeting these code requirements. Specifically, the site is irregularly shaped, double-
fronted and has an unusually large right-of-way area along W 20th Avenue. Staff is
recommending that the applicant offset the requested BSMs by increasing the street frontage
landscaping beyond the minimum point requirement. This can be addressed during the SIP
process.
Signage
The submitted site plan shows a monument sign on both of the commercial properties. As
shown, the signs meet setback requirements. Sign renderings were not included with this
request.
Landscaping
A preliminary landscape plan was included with the submittal. The plan shows approximate
locations of street frontage, building foundation, yard, and parking lot landscaping. The
applicant will need to meet all landscaping requirements or apply for base standard
modifications as part of the SIP process.
ITEM VII A: GDP SW corner W 20th Ave./W South Park Ave. 4
Storm Water Management/Utilities
A preliminary storm water management plan was included with this request. The Department
of Public Works has noted that since the overall site has greater than 20,000 square feet of land
disturbing construction activity, it will be subject to water quality along with any other
requirements of Chapter 14 of the City of Oshkosh Municipal Code Storm Water Management.
This will be addressed during the SIP and Site Plan Review processes.
Site Lighting
Lighting plans for the site have not yet been submitted. Lighting plans will be required to be
submitted as part of the SIP request.
Building Facades
Building elevation plans were not submitted as part of the GDP request. The applicant has
noted that they intend to meet all applicable design standard requirements for commercial
buildings.
FINDINGS/RECOMMENDATION/CONDITIONS
In its review and recommendation to the Common Council on an application for a Planned
Development district, staff recommends the Plan Commission make the following findings
based on the criteria established by Chapter 30-387 (C)(6):
(a) The proposed Planned Development project is consistent with the overall purpose
and intent of this Chapter.
(b) The proposed Planned Development project is consistent with the City’s
Comprehensive Plan and other area plans. (It is the responsibility of the City to
determine such consistency.)
(c) The proposed Planned Development project would maintain the desired
relationships between land uses, land use densities and intensities, and land use impacts
in the environs of the subject site.
(d) Adequate public infrastructure is or will be available to accommodate the range of
uses being proposed for the Planned Development project, including but not limited to
public sewer and water and public roads.
(e) The proposed Planned Development project will incorporate appropriate and
adequate buffers and transitions between areas of different land uses and development
densities/intensities.
(g) The proposed architecture and character of the proposed Planned Development
project is compatible with adjacent/nearby development.
(h) The proposed Planned Development project will positively contribute to and not
detract from the physical appearance and functional arrangement of development in the
area.
(i) The proposed Planned Development project will produce significant benefits in terms
of environmental design and significant alternative approaches to addressing
ITEM VII A: GDP SW corner W 20th Ave./W South Park Ave. 5
development performance that relate to and more than compensate for any requested
exceptions/base standard modifications variation of any standard or regulation of this
Chapter.
Staff recommends approval of the General Development Plan with the findings listed above
and the following conditions:
1. A Certified Survey Map (CSM) shall be reviewed and approved by the Department of
Community Development.
2. Approval of Access Control Variances for lateral clearance, driveway width, and
number of driveways.
3. Cross access agreement for shared driveway shall be filed with the Winnebago County
Register of Deeds.
4. BSM to allow reduced front yard pavement setback to 10.7’ (north) for both commercial
sites.
5. BSM to allow a dumpster enclosure to be located between the building and public right-
of-way frontage (W. South Park Ave.)
6. Final landscaping plan shall exceed the minimum point requirement for street frontage
landscaping and be addressed as part of the SIP request.