Loading...
HomeMy WebLinkAbout19. 21-147MARCH 23, 2021 21-147 RESOLUTION JOSSART BROTHERS, INC. FOR THE CEAPE AVENUE RECONSTRUCTION PROJECT ($3,059,387.02) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for the Ceape Avenue Reconstruction Project from Bowen Street to Lake Street; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: JOSSART BROTHERS, INC. 1682 Swan Road De Pere, WI 54115 Total Bid: $3,059,387.02 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. Nos. 03210410-6801-04105 Contract Control-Paving-21-05 Ceape Avenue Reconstruction 03210410-6802-04105 Contract Control-Sanitary Sewer-21-05 Ceape Avenue Reconstruction 03210410-6803-04105 Contract Control-Water Main-21-05 Ceape Avenue Reconstruction 03210410-6804-04105 Contract Control-Storm Sewer-21-05 Ceape Avenue Reconstruction 03210410-6806-04105 Contract Control-Sidewalk-21-05 Ceape Avenue Reconstruction (CARRIED__7-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 21-05 TO MARCH 23, 2021 21-147 RESOLUTION CONT’D 03210410-6809-04105 Contract Control-Traffic-21-05 Ceape Avenue Reconstruction 03210410-6810-04105 Contract Control-Admin Cost-21-05 Ceape Avenue Reconstruction C:\Users\dianem\AppData\Local\Temp\c2c2-85f7-feb7-358e.docx Page 1 of 2 TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: March 18, 2021 RE: Award Bid for Public Works Contract No. 21-05 to Jossart Brothers, Inc. for Ceape Avenue Reconstruction ($3,059,387.02) BACKGROUND The purpose of this Project is to reconstruct Ceape Avenue from Bowen Street to Lake Street. Sanitary sewer and laterals, water main and laterals, and storm sewer and laterals will be installed, replaced, or repaired, as needed, prior to placing new concrete pavement. Defective sidewalk squares, including those that do not meet the Americans with Disabilities Act (ADA) requirements, will be repaired during the project, and new concrete driveway aprons will be constructed, provided property owners have returned the Construction Access Agreement the City mailed to them. Sidewalks and drive aprons abutting properties whose property owners have not returned the Construction Access Agreement will have partial sidewalk sections removed and patched. In 2022, property owners will be responsible for repairing drive aprons and all patched and non-ADA compliant sidewalks that cannot be constructed with this Project. ANALYSIS Engineering staff reviewed five (5) bids. The low bid was received from Jossart Brothers, Inc. of DePere, Wisconsin. The total bid is $3,059,387.02. FISCAL IMPACT Funding for the West 9th Avenue Reconstruction Project is in the 2021 Capital Improvement Program (CIP) (Account No. 03210410-6801-04105/Contract Control-Paving-21-05 Ceape Avenue Reconstruction, 03210410-6802-04105/Contract Control-Sanitary Sewer-21-05 Ceape Avenue Reconstruction, 03210410-6803-04105/Contract Control-Water Main-21-05 Ceape Avenue Reconstruction, 03210410-6804-04105/Contract Control-Storm Sewer-21-05 Ceape Avenue Reconstruction, 03210410-6806-04105/Contract Control-Sidewalk-21-05 Ceape Avenue Reconstruction, 03210410-6809-04105/Contract Control-Traffic-21-05 Ceape Avenue Reconstruction, and 03210410-6810-04105/Contract Control-Admin Cost-21-05 Ceape Avenue Reconstruction). Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction-related expenses. Special Assessments will be levied to adjoining property owners per the City’s Special Assessment Policy. C:\Users\dianem\AppData\Local\Temp\c2c2-85f7-feb7-358e.docx Page 2 of 2 CIP Section CIP Funds Budgeted Estimated Total Construction Cost Street $1,617,500 $1,045,602 Storm Sewer $945,500 $662,144 Sanitary Sewer $1,401,100 $695,853 Water Main $1,554,900 $774,984 Sidewalk $135,500 $58,434 Traffic $380,000 $184,452 Admin $6,000 $6,000 Totals $6,040,500 $3,427,469 RECOMMENDATIONS I recommend award to the low bidder, Jossart Brothers, Inc. in the amount of $3,059,387.02. Approved: Mark A. Rohloff City Manager JLG/tlt Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionSection 1$3,059,387.02$3,246,174.221011Clearing; complete as specifiedInch Diameter 24.00 $31.00 $744.00 $31.00 $744.001021Grubbing; complete as specifiedInch Diameter 24.00 $31.00 $744.00 $31.00 $744.001050Mobilization; complete as specifiedLump Sum 1.00 $88,000.00 $88,000.00 $101,787.00 $101,787.001100Removing pavement; complete as specifiedSquare Yards 1,650.00 $0.01 $16.50 $0.01 $16.501120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 38,300.00 $0.42 $16,086.00 $0.40 $15,320.001200Unclassified excavation; complete as specifiedCubic Yards 5,600.00 $13.40 $75,040.00 $13.60 $76,160.001220Excavation special (paving); complete as specifiedTons 1,400.00 $0.01 $14.00 $0.01 $14.0013017" concrete pavement; with 5" CABC and grading; complete as specifiedSquare Yards 2,700.00 $38.20 $103,140.00 $38.80 $104,760.0013037" concrete pavement HES; with 5" CABC and grading; complete as specifiedSquare Yards 150.00 $41.30 $6,195.00 $41.90 $6,285.0013118" concrete pavement; with 6" CABC and grading; complete as specifiedSquare Yards 7,350.00 $40.70 $299,145.00 $41.30 $303,555.0013138" concrete pavement HES; with 6" CABC and grading; complete as specifiedSquare Yards 450.00 $43.80 $19,710.00 $44.50 $20,025.001334Concrete pavement gaps; complete as specifiedEach 2.00 $1,050.00 $2,100.00 $1,046.00 $2,092.001340Crushed aggregate base course; complete as specifiedTons 1,650.00 $6.20 $10,230.00 $6.30 $10,395.001350Pavement ties; complete as specifiedEach 20.00 $8.30 $166.00 $8.40 $168.00DePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan RoadI:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 1 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road1352Drilled dowel bars; 1"; complete as specifiedEach 35.00 $10.40 $364.00 $10.50 $367.501354Drilled dowel bars; 1 1/4"; complete as specifiedEach 38.00 $12.50 $475.00 $12.50 $475.001360Adjust manholes and inlets; complete as specifiedEach 47.00 $320.00 $15,040.00 $581.00 $27,307.001370Turf restoration; complete as specifiedSquare Yards 5,900.00 $7.85 $46,315.00 $7.80 $46,020.001372Restore gravel driveway/apron; complete as specifiedSquare Yards 120.00 $13.40 $1,608.00 $13.60 $1,632.001380Cold weather covering (concrete pavement) - single visquine; complete as specifiedSquare Yards 2,150.00 $0.01 $21.50 $0.01 $21.501390Up-charge for late season cold weather concrete pavement; complete as specifiedCubic Yards 1,350.00 $0.01 $13.50 $0.01 $13.50141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 180.00 $11.30 $2,034.00 $11.50 $2,070.00144230" curb and gutter; 8"; with 6" CABC and grading; complete as specifiedLinear Feet 90.00 $37.10 $3,339.00 $37.60 $3,384.00144536" curb and gutter; plain; (12" curb head); 8"; with 6" CABC and grading; complete as specifiedLinear Feet 30.00 $46.30 $1,389.00 $48.10 $1,443.001460Sidewalk curb; complete as specifiedLinear Feet 580.00 $20.60 $11,948.00 $20.90 $12,122.0015004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 21,000.00 $5.40 $113,400.00 $5.50 $115,500.0015106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 15,000.00 $6.15 $92,250.00 $6.20 $93,000.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 2 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road15146" concrete sidewalk/driveway/ramp (HES) with 3" CABC and grading; complete as specifiedSquare Feet 3,300.00 $6.35 $20,955.00 $6.60 $21,780.0015306" concrete step; complete as specifiedSquare Feet 260.00 $36.00 $9,360.00 $36.60 $9,516.001540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 120.00 $31.00 $3,720.00 $31.40 $3,768.001550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 5,200.00 $0.85 $4,420.00 $0.80 $4,160.001560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 200.00 $6.20 $1,240.00 $6.30 $1,260.001580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 7,900.00 $0.21 $1,659.00 $0.21 $1,659.001590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 1,480.00 $0.01 $14.80 $0.01 $14.801600Furnish and install tree; complete as specifiedEach 6.00 $475.00 $2,850.00 $470.00 $2,820.001650Locate existing property monuments; complete as specifiedEach 90.00 $40.00 $3,600.00 $37.00 $3,330.001652Replace existing property monuments; complete as specifiedEach 90.00 $50.00 $4,500.00 $47.00 $4,230.001700Sawing existing pavement; complete as specifiedLinear Feet 1,350.00 $2.00 $2,700.00 $2.40 $3,240.001710Sawing concrete pavement full depth; complete as specifiedLinear Feet 150.00 $6.00 $900.00 $2.40 $360.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 3 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road1900Tack coat; complete as specifiedGallons 30.00 $9.50 $285.00 $9.40 $282.0019064" asphaltic pavement LT with 10" CABC and grading; complete as specifiedSquare Yards 130.00 $60.30 $7,839.00 $60.60 $7,878.0019114" asphaltic transition LT with 10" CABC and grading; complete as specifiedSquare Yards 180.00 $50.30 $9,054.00 $50.20 $9,036.0019164" asphaltic surface LT with 6" CABC and grading; complete as specifiedSquare Yards 140.00 $51.50 $7,210.00 $51.80 $7,252.0019172" asphaltic surface LT with 6" CABC and grading; complete as specifiedSquare Yards 100.00 $35.60 $3,560.00 $36.10 $3,610.001918Asphaltic cold weather paving; complete as specifiedSquare Yards 70.00 $57.00 $3,990.00 $57.50 $4,025.002003Furnish and install 12" storm sewer; complete as specifiedLinear Feet 300.00 $58.00 $17,400.00 $50.00 $15,000.002006Furnish and install 15" storm sewer; complete as specifiedLinear Feet 215.00 $60.00 $12,900.00 $56.00 $12,040.002009Furnish and install 18" storm sewer; complete as specifiedLinear Feet 450.00 $65.00 $29,250.00 $70.00 $31,500.002012Furnish and install 21" storm sewer; complete as specifiedLinear Feet 295.00 $68.00 $20,060.00 $85.00 $25,075.002015Furnish and install 24" storm sewer; complete as specifiedLinear Feet 265.00 $72.00 $19,080.00 $85.00 $22,525.002021Furnish and install 30" storm sewer; complete as specifiedLinear Feet 615.00 $90.00 $55,350.00 $115.00 $70,725.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 4 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road2024Furnish and install 36" storm sewer; complete as specifiedLinear Feet 465.00 $101.00 $46,965.00 $132.00 $61,380.002027Furnish and install 42" storm sewer; complete as specifiedLinear Feet 255.00 $133.00 $33,915.00 $164.00 $41,820.002201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 20.00 $550.00 $11,000.00 $519.00 $10,380.002202Furnish and install standard storm sewer manhole (5' diameter); complete as specifiedVertical Feet 31.50 $680.00 $21,420.00 $618.00 $19,467.002203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 22.50 $765.00 $17,212.50 $688.00 $15,480.002235Furnish and install Type 1 inlet (with 18" sump); complete as specifiedEach 1.00 $1,900.00 $1,900.00 $4,350.00 $4,350.002237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 18.00 $2,100.00 $37,800.00 $1,917.00 $34,506.002400Furnish and install 6" storm sewer lateral; complete as specifiedLinear Feet 2,680.00 $54.00 $144,720.00 $49.00 $131,320.002404Furnish and install storm sewer marker balls; complete as specifiedEach 155.00 $30.00 $4,650.00 $30.00 $4,650.002406Furnish and install storm sewer clay dams; complete as specifiedEach 77.00 $50.00 $3,850.00 $118.00 $9,086.002408Furnish and install storm sewer lateral inlet; complete as specifiedEach 77.00 $750.00 $57,750.00 $704.00 $54,208.002414Storm lateral inlet adjustments; complete as specifiedEach 77.00 $200.00 $15,400.00 $165.00 $12,705.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 5 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road2508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 48.00 $75.00 $3,600.00 $73.00 $3,504.002510Sediment removal - Type D modified inlet protection; complete as specifiedEach 48.00 $10.00 $480.00 $5.00 $240.002516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 41.00 $8.40 $344.40 $8.00 $328.002750Rock excavation; complete as specifiedCubic Yards 10.00 $0.01 $0.10 $0.01 $0.102800Abandon 8" - 12" storm sewer; complete as specifiedLinear Feet 595.00 $5.00 $2,975.00 $5.00 $2,975.002802Abandon 15" and larger storm sewer; complete as specifiedLinear Feet 1,700.00 $15.00 $25,500.00 $16.00 $27,200.002804Remove 30" and smaller storm sewer; complete as specifiedLinear Feet 335.00 $40.00 $13,400.00 $24.00 $8,040.002810Abandon storm sewer manholes and inlets; complete as specifiedEach 9.00 $400.00 $3,600.00 $415.00 $3,735.002812Remove storm sewer manholes and inlets; complete as specifiedEach 14.00 $500.00 $7,000.00 $436.00 $6,104.002850Connect to existing storm sewer main; complete as specifiedEach 7.00 $1,000.00 $7,000.00 $507.00 $3,549.002852Connect to existing storm sewer lateral; complete as specifiedEach 3.00 $200.00 $600.00 $249.00 $747.002858Connect to existing storm sewer inlet; complete as specifiedEach 1.00 $750.00 $750.00 $485.00 $485.002914Storm sewer utility line opening (ULO); complete as specifiedEach 3.00 $750.00 $2,250.00 $472.00 $1,416.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 6 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road2950Excavation special (storm); complete as specifiedTons 25.00 $10.00 $250.00 $20.00 $500.003000Furnish and install 8" sanitary sewer (relay); complete as specifiedLinear Feet 2,480.00 $105.00 $260,400.00 $135.00 $334,800.003060Furnish and install 8" sanitary sewer drop; complete as specifiedVertical Feet 3.00 $475.00 $1,425.00 $640.00 $1,920.003100Furnish and install standard sanitary sewer manhole (4' diameter); complete as specifiedVertical Feet 85.00 $230.00 $19,550.00 $257.00 $21,845.003114Furnish and install external sanitary sewer manhole chimney seal; complete as specifiedEach 7.00 $460.00 $3,220.00 $470.00 $3,290.003116Furnish and install external sanitary sewer manhole chimney seal extension; complete as specifiedEach 1.00 $415.00 $415.00 $418.00 $418.003118Furnish and install internal sanitary sewer manhole chimney seal; complete as specifiedEach 1.00 $415.00 $415.00 $418.00 $418.003120Furnish and install internal sanitary sewer manhole chimney seal extension; complete as specifiedEach 1.00 $415.00 $415.00 $418.00 $418.003210Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specifiedEach 81.00 $150.00 $12,150.00 $117.00 $9,477.003230Furnish and install 4" sanitary sewer laterals (new); complete as specifiedLinear Feet 70.00 $85.00 $5,950.00 $80.00 $5,600.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 7 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road3231Furnish and install 4" sanitary sewer riser (new); complete as specifiedLinear Feet 4.00 $100.00 $400.00 $115.00 $460.003234Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specifiedLinear Feet 2,767.00 $86.00 $237,962.00 $80.00 $221,360.003235Furnish and install 4"/6" sanitary sewer riser (relay); complete as specifiedLinear Feet 243.00 $100.00 $24,300.00 $120.00 $29,160.003236Furnish and install sanitary sewer lateral marker balls; complete as specifiedEach 162.00 $30.00 $4,860.00 $20.00 $3,240.003238Furnish and install clay dams; complete as specifiedEach 81.00 $50.00 $4,050.00 $472.00 $38,232.003300Furnish and install connection to existing 8" sanitary sewer mains; complete as specifiedEach 3.00 $750.00 $2,250.00 $1,214.00 $3,642.003330Furnish and install sanitary sewer concrete collars; complete as specifiedEach 1.00 $750.00 $750.00 $488.00 $488.003404Furnish and install 10" sanitary sewer open cut casing pipes; complete as specifiedLinear Feet 80.00 $85.00 $6,800.00 $73.00 $5,840.003600Rock excavation; complete as specifiedCubic Yards 72.00 $0.01 $0.72 $0.01 $0.723700Closed circuit televising; complete as specifiedLinear Feet 2,480.00 $1.50 $3,720.00 $1.00 $2,480.003710Closed circuit televising - using push camera; complete as specifiedEach 2.00 $250.00 $500.00 $235.00 $470.003800Abandon sanitary sewer manholes; complete as specifiedEach 8.00 $500.00 $4,000.00 $456.00 $3,648.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 8 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road3802Abandon 8" sanitary sewer; complete as specifiedLinear Feet 1,660.00 $4.00 $6,640.00 $5.00 $8,300.003804Abandon 10" sanitary sewer; complete as specifiedLinear Feet 565.00 $5.00 $2,825.00 $5.00 $2,825.003852Remove sanitary sewer manholes; complete as specifiedEach 4.00 $600.00 $2,400.00 $472.00 $1,888.003854Remove sanitary sewer; complete as specifiedLinear Feet 262.50 $52.00 $13,650.00 $44.00 $11,550.003890Sanitary sewer utility line opening (ULO); complete as specifiedEach 2.00 $1,000.00 $2,000.00 $709.00 $1,418.003892Excavation special (sanitary); complete as specifiedTons 25.00 $10.00 $250.00 $20.00 $500.004002Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 80.00 $87.00 $6,960.00 $89.00 $7,120.004004Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 805.00 $95.00 $76,475.00 $98.00 $78,890.004010Furnish and install 16" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 1,770.00 $135.00 $238,950.00 $140.00 $247,800.004036Furnish and install 1" water service (relay); complete as specifiedLinear Feet 2,807.00 $72.00 $202,104.00 $70.00 $196,490.004048Furnish and install 1" corporation and stop box; complete as specifiedEach 82.00 $400.00 $32,800.00 $487.00 $39,934.004055Furnish and install water service clay dams; complete as specifiedEach 82.00 $50.00 $4,100.00 $472.00 $38,704.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 9 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road4058Furnish and install connections to existing 6" water main; complete as specifiedEach 1.00 $2,000.00 $2,000.00 $1,562.00 $1,562.004060Furnish and install connections to existing 8" water main; complete as specifiedEach 3.00 $2,500.00 $7,500.00 $1,752.00 $5,256.004066Furnish and install connections to existing 16" water main; complete as specifiedEach 1.00 $3,000.00 $3,000.00 $2,902.00 $2,902.004110Furnish and install 8" x 6" water main tee; complete as specifiedEach 1.00 $500.00 $500.00 $554.00 $554.004111Furnish and install 8" x 8" water main tee; complete as specifiedEach 1.00 $650.00 $650.00 $699.00 $699.004137Furnish and install 16" x 6" water main tee; complete as specifiedEach 4.00 $1,750.00 $7,000.00 $1,627.00 $6,508.004138Furnish and install 16" x 8" water main tee; complete as specifiedEach 1.00 $1,950.00 $1,950.00 $4,083.00 $4,083.004141Furnish and install 16" x 16" water main tee; complete as specifiedEach 1.00 $2,850.00 $2,850.00 $2,791.00 $2,791.004236Furnish and install 6" 45 degree water main bend; complete as specifiedEach 14.00 $250.00 $3,500.00 $280.00 $3,920.004237Furnish and install 8" 45 degree water main bend; complete as specifiedEach 2.00 $350.00 $700.00 $364.00 $728.004240Furnish and install 16" 45 degree water main bend; complete as specifiedEach 2.00 $1,550.00 $3,100.00 $1,556.00 $3,112.004273Furnish and install 16" x 6" water main reducer; complete as specifiedEach 1.00 $1,100.00 $1,100.00 $1,109.00 $1,109.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 10 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road4274Furnish and install 16" x 8" water main reducer; complete as specifiedEach 1.00 $1,100.00 $1,100.00 $1,098.00 $1,098.004401Furnish and install 6" water main gate valve; complete as specifiedEach 5.00 $1,300.00 $6,500.00 $1,270.00 $6,350.004402Furnish and install 8" water main gate valve; complete as specifiedEach 6.00 $1,825.00 $10,950.00 $1,795.00 $10,770.004405Furnish and install 16" water main gate valve; complete as specifiedEach 7.00 $8,000.00 $56,000.00 $7,654.00 $53,578.004500Furnish and install hydrant; complete as specifiedEach 5.00 $4,200.00 $21,000.00 $4,425.00 $22,125.004712Furnish and install 2" water main casing pipe; complete as specifiedLinear Feet 80.00 $55.00 $4,400.00 $50.00 $4,000.004800Rock excavation; complete as specifiedCubic Yards 60.00 $0.01 $0.60 $0.01 $0.604900Abandon water main on Ceape Avenue; complete as specifiedLump Sum 1.00 $7,500.00 $7,500.00 $3,977.00 $3,977.004920Remove water main; complete as specifiedLinear Feet 210.00 $35.00 $7,350.00 $27.00 $5,670.004990Excavation special (water); complete as specifiedTons 25.00 $10.00 $250.00 $20.00 $500.005013Furnish and install pull box (non-conductive); 18" x 36"; complete as specifiedEach 16.00 $1,500.00 $24,000.00 $1,516.00 $24,256.005017Furnish and install pull box - non-conductive, 24" x 36"; complete as specifiedEach 2.00 $1,500.00 $3,000.00 $1,568.00 $3,136.005025Adjust pull box; complete as specifiedEach 16.00 $5.15 $82.40 $5.00 $80.005051Install CITY-supplied lighting control cabinet; complete as specifiedEach 1.00 $2,050.00 $2,050.00 $2,091.00 $2,091.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 11 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionDePere, WI 54115Jossart Brothers, Inc.Dorner Inc.1682 Swan Road5054Install electrical service; complete as specifiedEach 1.00 $1,240.00 $1,240.00 $1,255.00 $1,255.005130Furnish and install 3" Schedule 40 PVC; complete as specifiedLinear Feet 3,345.00 $8.30 $27,763.50 $8.40 $28,098.005240Furnish and install 6 gauge red-coated wire; complete as specifiedLinear Feet 4,400.00 $1.35 $5,940.00 $1.40 $6,160.005241Furnish and install 6 gauge black-coated wire; complete as specifiedLinear Feet 4,400.00 $1.35 $5,940.00 $1.40 $6,160.005252Furnish and install 8 gauge green-coated wire; complete as specifiedLinear Feet 3,790.00 $1.05 $3,979.50 $1.00 $3,790.005270Furnish and install 12 gauge red-coated wire; complete as specifiedLinear Feet 400.00 $0.61 $244.00 $0.60 $240.005271Furnish and install 12 gauge black-coated wire; complete as specifiedLinear Feet 400.00 $0.61 $244.00 $0.60 $240.005272Furnish and install 12 gauge green-coated wire; complete as specifiedLinear Feet 400.00 $0.61 $244.00 $0.60 $240.005380Furnish and install fuse holder; complete as specifiedEach 40.00 $51.50 $2,060.00 $52.00 $2,080.005392Furnish and install 5A fuse; complete as specifiedEach 40.00 $5.15 $206.00 $5.00 $200.005410Install light pole and pole arm and acorn pole top light, "CITY Supplied," complete as specifiedEach 20.00 $775.00 $15,500.00 $784.00 $15,680.005504Furnish and install Type 5 base; complete as specifiedEach 20.00 $900.00 $18,000.00 $915.00 $18,300.005506Furnish and install Type 9 base; complete as specifiedEach 1.00 $1,550.00 $1,550.00 $1,568.00 $1,568.00Bid Total:$3,059,387.02$3,246,174.22I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 12 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantitySection 11011Clearing; complete as specifiedInch Diameter 24.001021Grubbing; complete as specifiedInch Diameter 24.001050Mobilization; complete as specifiedLump Sum 1.001100Removing pavement; complete as specifiedSquare Yards 1,650.001120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 38,300.001200Unclassified excavation; complete as specifiedCubic Yards 5,600.001220Excavation special (paving); complete as specifiedTons 1,400.0013017" concrete pavement; with 5" CABC and grading; complete as specifiedSquare Yards 2,700.0013037" concrete pavement HES; with 5" CABC and grading; complete as specifiedSquare Yards 150.0013118" concrete pavement; with 6" CABC and grading; complete as specifiedSquare Yards 7,350.0013138" concrete pavement HES; with 6" CABC and grading; complete as specifiedSquare Yards 450.001334Concrete pavement gaps; complete as specifiedEach 2.001340Crushed aggregate base course; complete as specifiedTons 1,650.001350Pavement ties; complete as specifiedEach 20.00Unit PriceExtensionUnit PriceExtension$3,308,850.92$3,374,000.00$35.00 $840.00 $31.00 $744.00$20.00 $480.00 $31.00 $744.00$70,000.00 $70,000.00 $208,915.53 $208,915.53$3.00 $4,950.00 $1.75 $2,887.50$0.60 $22,980.00 $0.40 $15,320.00$11.00 $61,600.00 $13.35 $74,760.00$0.01 $14.00 $0.01 $14.00$37.58 $101,466.00 $38.00 $102,600.00$40.58 $6,087.00 $42.00 $6,300.00$40.02 $294,147.00 $40.50 $297,675.00$43.02 $19,359.00 $43.75 $19,687.50$1,000.00 $2,000.00 $1,025.00 $2,050.00$5.00 $8,250.00 $6.15 $10,147.50$8.00 $160.00 $8.25 $165.00Carl Bowers & Sons Const Co. Inc.PTS Contractors, IncI:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 13 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity1352Drilled dowel bars; 1"; complete as specifiedEach 35.001354Drilled dowel bars; 1 1/4"; complete as specifiedEach 38.001360Adjust manholes and inlets; complete as specifiedEach 47.001370Turf restoration; complete as specifiedSquare Yards 5,900.001372Restore gravel driveway/apron; complete as specifiedSquare Yards 120.001380Cold weather covering (concrete pavement) - single visquine; complete as specifiedSquare Yards 2,150.001390Up-charge for late season cold weather concrete pavement; complete as specifiedCubic Yards 1,350.00141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 180.00144230" curb and gutter; 8"; with 6" CABC and grading; complete as specifiedLinear Feet 90.00144536" curb and gutter; plain; (12" curb head); 8"; with 6" CABC and grading; complete as specifiedLinear Feet 30.001460Sidewalk curb; complete as specifiedLinear Feet 580.0015004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 21,000.0015106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 15,000.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$10.00 $350.00 $10.25 $358.75$14.00 $532.00 $13.00 $494.00$300.00 $14,100.00 $308.00 $14,476.00$8.00 $47,200.00 $7.70 $45,430.00$8.00 $960.00 $13.30 $1,596.00$0.01 $21.50 $0.01 $21.50$0.01 $13.50 $0.01 $13.50$11.50 $2,070.00 $11.30 $2,034.00$36.50 $3,285.00 $37.00 $3,330.00$48.00 $1,440.00 $46.00 $1,380.00$25.00 $14,500.00 $20.50 $11,890.00$4.85 $101,850.00 $5.45 $114,450.00$5.35 $80,250.00 $6.05 $90,750.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 14 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity15146" concrete sidewalk/driveway/ramp (HES) with 3" CABC and grading; complete as specifiedSquare Feet 3,300.0015306" concrete step; complete as specifiedSquare Feet 260.001540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 120.001550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 5,200.001560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 200.001580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 7,900.001590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 1,480.001600Furnish and install tree; complete as specifiedEach 6.001650Locate existing property monuments; complete as specifiedEach 90.001652Replace existing property monuments; complete as specifiedEach 90.001700Sawing existing pavement; complete as specifiedLinear Feet 1,350.001710Sawing concrete pavement full depth; complete as specifiedLinear Feet 150.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$5.75 $18,975.00 $6.50 $21,450.00$40.00 $10,400.00 $36.00 $9,360.00$32.00 $3,840.00 $31.00 $3,720.00$1.50 $7,800.00 $0.80 $4,160.00$5.00 $1,000.00 $6.10 $1,220.00$0.01 $79.00 $0.20 $1,580.00$0.01 $14.80 $0.01 $14.80$450.00 $2,700.00 $465.00 $2,790.00$35.00 $3,150.00 $128.00 $11,520.00$45.00 $4,050.00 $42.00 $3,780.00$2.00 $2,700.00 $2.50 $3,375.00$5.00 $750.00 $2.50 $375.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 15 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity1900Tack coat; complete as specifiedGallons 30.0019064" asphaltic pavement LT with 10" CABC and grading; complete as specifiedSquare Yards 130.0019114" asphaltic transition LT with 10" CABC and grading; complete as specifiedSquare Yards 180.0019164" asphaltic surface LT with 6" CABC and grading; complete as specifiedSquare Yards 140.0019172" asphaltic surface LT with 6" CABC and grading; complete as specifiedSquare Yards 100.001918Asphaltic cold weather paving; complete as specifiedSquare Yards 70.002003Furnish and install 12" storm sewer; complete as specifiedLinear Feet 300.002006Furnish and install 15" storm sewer; complete as specifiedLinear Feet 215.002009Furnish and install 18" storm sewer; complete as specifiedLinear Feet 450.002012Furnish and install 21" storm sewer; complete as specifiedLinear Feet 295.002015Furnish and install 24" storm sewer; complete as specifiedLinear Feet 265.002021Furnish and install 30" storm sewer; complete as specifiedLinear Feet 615.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$10.00 $300.00 $3.60 $108.00$60.00 $7,800.00 $79.35 $10,315.50$47.00 $8,460.00 $39.30 $7,074.00$49.00 $6,860.00 $77.25 $10,815.00$34.00 $3,400.00 $22.60 $2,260.00$0.01 $0.70 $3.00 $210.00$73.00 $21,900.00 $78.00 $23,400.00$75.00 $16,125.00 $68.00 $14,620.00$79.00 $35,550.00 $82.00 $36,900.00$83.00 $24,485.00 $82.00 $24,190.00$88.00 $23,320.00 $98.00 $25,970.00$106.00 $65,190.00 $104.00 $63,960.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 16 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity2024Furnish and install 36" storm sewer; complete as specifiedLinear Feet 465.002027Furnish and install 42" storm sewer; complete as specifiedLinear Feet 255.002201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 20.002202Furnish and install standard storm sewer manhole (5' diameter); complete as specifiedVertical Feet 31.502203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 22.502235Furnish and install Type 1 inlet (with 18" sump); complete as specifiedEach 1.002237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 18.002400Furnish and install 6" storm sewer lateral; complete as specifiedLinear Feet 2,680.002404Furnish and install storm sewer marker balls; complete as specifiedEach 155.002406Furnish and install storm sewer clay dams; complete as specifiedEach 77.002408Furnish and install storm sewer lateral inlet; complete as specifiedEach 77.002414Storm lateral inlet adjustments; complete as specifiedEach 77.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$118.00 $54,870.00 $122.00 $56,730.00$141.00 $35,955.00 $137.00 $34,935.00$500.00 $10,000.00 $365.00 $7,300.00$630.00 $19,845.00 $555.00 $17,482.50$700.00 $15,750.00 $600.00 $13,500.00$1,900.00 $1,900.00 $1,710.00 $1,710.00$1,900.00 $34,200.00 $1,775.00 $31,950.00$61.00 $163,480.00 $54.00 $144,720.00$25.00 $3,875.00 $35.00 $5,425.00$100.00 $7,700.00 $115.00 $8,855.00$750.00 $57,750.00 $500.00 $38,500.00$200.00 $15,400.00 $1.00 $77.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 17 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity2508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 48.002510Sediment removal - Type D modified inlet protection; complete as specifiedEach 48.002516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 41.002750Rock excavation; complete as specifiedCubic Yards 10.002800Abandon 8" - 12" storm sewer; complete as specifiedLinear Feet 595.002802Abandon 15" and larger storm sewer; complete as specifiedLinear Feet 1,700.002804Remove 30" and smaller storm sewer; complete as specifiedLinear Feet 335.002810Abandon storm sewer manholes and inlets; complete as specifiedEach 9.002812Remove storm sewer manholes and inlets; complete as specifiedEach 14.002850Connect to existing storm sewer main; complete as specifiedEach 7.002852Connect to existing storm sewer lateral; complete as specifiedEach 3.002858Connect to existing storm sewer inlet; complete as specifiedEach 1.002914Storm sewer utility line opening (ULO); complete as specifiedEach 3.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$100.00 $4,800.00 $72.00 $3,456.00$10.00 $480.00 $6.00 $288.00$10.00 $410.00 $8.25 $338.25$0.01 $0.10 $0.01 $0.10$10.00 $5,950.00 $10.00 $5,950.00$23.00 $39,100.00 $15.00 $25,500.00$35.00 $11,725.00 $21.00 $7,035.00$400.00 $3,600.00 $235.00 $2,115.00$500.00 $7,000.00 $235.00 $3,290.00$800.00 $5,600.00 $1,365.00 $9,555.00$400.00 $1,200.00 $275.00 $825.00$500.00 $500.00 $865.00 $865.00$1,000.00 $3,000.00 $58.00 $174.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 18 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity2950Excavation special (storm); complete as specifiedTons 25.003000Furnish and install 8" sanitary sewer (relay); complete as specifiedLinear Feet 2,480.003060Furnish and install 8" sanitary sewer drop; complete as specifiedVertical Feet 3.003100Furnish and install standard sanitary sewer manhole (4' diameter); complete as specifiedVertical Feet 85.003114Furnish and install external sanitary sewer manhole chimney seal; complete as specifiedEach 7.003116Furnish and install external sanitary sewer manhole chimney seal extension; complete as specifiedEach 1.003118Furnish and install internal sanitary sewer manhole chimney seal; complete as specifiedEach 1.003120Furnish and install internal sanitary sewer manhole chimney seal extension; complete as specifiedEach 1.003210Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specifiedEach 81.003230Furnish and install 4" sanitary sewer laterals (new); complete as specifiedLinear Feet 70.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$25.00 $625.00 $58.00 $1,450.00$128.00 $317,440.00 $127.00 $314,960.00$500.00 $1,500.00 $385.00 $1,155.00$350.00 $29,750.00 $265.00 $22,525.00$450.00 $3,150.00 $460.00 $3,220.00$400.00 $400.00 $410.00 $410.00$450.00 $450.00 $410.00 $410.00$350.00 $350.00 $410.00 $410.00$100.00 $8,100.00 $125.00 $10,125.00$110.00 $7,700.00 $120.00 $8,400.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 19 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity3231Furnish and install 4" sanitary sewer riser (new); complete as specifiedLinear Feet 4.003234Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specifiedLinear Feet 2,767.003235Furnish and install 4"/6" sanitary sewer riser (relay); complete as specifiedLinear Feet 243.003236Furnish and install sanitary sewer lateral marker balls; complete as specifiedEach 162.003238Furnish and install clay dams; complete as specifiedEach 81.003300Furnish and install connection to existing 8" sanitary sewer mains; complete as specifiedEach 3.003330Furnish and install sanitary sewer concrete collars; complete as specifiedEach 1.003404Furnish and install 10" sanitary sewer open cut casing pipes; complete as specifiedLinear Feet 80.003600Rock excavation; complete as specifiedCubic Yards 72.003700Closed circuit televising; complete as specifiedLinear Feet 2,480.003710Closed circuit televising - using push camera; complete as specifiedEach 2.003800Abandon sanitary sewer manholes; complete as specifiedEach 8.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$110.00 $440.00 $120.00 $480.00$105.00 $290,535.00 $112.00 $309,904.00$110.00 $26,730.00 $120.00 $29,160.00$30.00 $4,860.00 $33.00 $5,346.00$100.00 $8,100.00 $115.00 $9,315.00$1,100.00 $3,300.00 $1,175.00 $3,525.00$1,000.00 $1,000.00 $1.00 $1.00$150.00 $12,000.00 $60.00 $4,800.00$0.01 $0.72 $0.01 $0.72$2.00 $4,960.00 $1.30 $3,224.00$250.00 $500.00 $345.00 $690.00$500.00 $4,000.00 $575.00 $4,600.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 20 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity3802Abandon 8" sanitary sewer; complete as specifiedLinear Feet 1,660.003804Abandon 10" sanitary sewer; complete as specifiedLinear Feet 565.003852Remove sanitary sewer manholes; complete as specifiedEach 4.003854Remove sanitary sewer; complete as specifiedLinear Feet 262.503890Sanitary sewer utility line opening (ULO); complete as specifiedEach 2.003892Excavation special (sanitary); complete as specifiedTons 25.004002Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 80.004004Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 805.004010Furnish and install 16" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 1,770.004036Furnish and install 1" water service (relay); complete as specifiedLinear Feet 2,807.004048Furnish and install 1" corporation and stop box; complete as specifiedEach 82.004055Furnish and install water service clay dams; complete as specifiedEach 82.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$5.00 $8,300.00 $11.00 $18,260.00$10.00 $5,650.00 $11.00 $6,215.00$1,000.00 $4,000.00 $580.00 $2,320.00$40.00 $10,500.00 $34.00 $8,925.00$1,000.00 $2,000.00 $580.00 $1,160.00$25.00 $625.00 $58.00 $1,450.00$110.00 $8,800.00 $115.00 $9,200.00$105.00 $84,525.00 $98.00 $78,890.00$173.00 $306,210.00 $143.00 $253,110.00$75.00 $210,525.00 $80.00 $224,560.00$600.00 $49,200.00 $520.00 $42,640.00$100.00 $8,200.00 $115.00 $9,430.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 21 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity4058Furnish and install connections to existing 6" water main; complete as specifiedEach 1.004060Furnish and install connections to existing 8" water main; complete as specifiedEach 3.004066Furnish and install connections to existing 16" water main; complete as specifiedEach 1.004110Furnish and install 8" x 6" water main tee; complete as specifiedEach 1.004111Furnish and install 8" x 8" water main tee; complete as specifiedEach 1.004137Furnish and install 16" x 6" water main tee; complete as specifiedEach 4.004138Furnish and install 16" x 8" water main tee; complete as specifiedEach 1.004141Furnish and install 16" x 16" water main tee; complete as specifiedEach 1.004236Furnish and install 6" 45 degree water main bend; complete as specifiedEach 14.004237Furnish and install 8" 45 degree water main bend; complete as specifiedEach 2.004240Furnish and install 16" 45 degree water main bend; complete as specifiedEach 2.004273Furnish and install 16" x 6" water main reducer; complete as specifiedEach 1.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$1,500.00 $1,500.00 $1,965.00 $1,965.00$2,000.00 $6,000.00 $2,320.00 $6,960.00$3,000.00 $3,000.00 $7,045.00 $7,045.00$550.00 $550.00 $520.00 $520.00$675.00 $675.00 $655.00 $655.00$1,600.00 $6,400.00 $1,540.00 $6,160.00$4,000.00 $4,000.00 $1,845.00 $1,845.00$2,650.00 $2,650.00 $2,645.00 $2,645.00$330.00 $4,620.00 $275.00 $3,850.00$400.00 $800.00 $355.00 $710.00$1,550.00 $3,100.00 $1,465.00 $2,930.00$1,200.00 $1,200.00 $1,045.00 $1,045.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 22 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity4274Furnish and install 16" x 8" water main reducer; complete as specifiedEach 1.004401Furnish and install 6" water main gate valve; complete as specifiedEach 5.004402Furnish and install 8" water main gate valve; complete as specifiedEach 6.004405Furnish and install 16" water main gate valve; complete as specifiedEach 7.004500Furnish and install hydrant; complete as specifiedEach 5.004712Furnish and install 2" water main casing pipe; complete as specifiedLinear Feet 80.004800Rock excavation; complete as specifiedCubic Yards 60.004900Abandon water main on Ceape Avenue; complete as specifiedLump Sum 1.004920Remove water main; complete as specifiedLinear Feet 210.004990Excavation special (water); complete as specifiedTons 25.005013Furnish and install pull box (non-conductive); 18" x 36"; complete as specifiedEach 16.005017Furnish and install pull box - non-conductive, 24" x 36"; complete as specifiedEach 2.005025Adjust pull box; complete as specifiedEach 16.005051Install CITY-supplied lighting control cabinet; complete as specifiedEach 1.00Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$1,200.00 $1,200.00 $1,035.00 $1,035.00$1,350.00 $6,750.00 $1,275.00 $6,375.00$1,850.00 $11,100.00 $1,775.00 $10,650.00$7,500.00 $52,500.00 $7,315.00 $51,205.00$4,500.00 $22,500.00 $4,345.00 $21,725.00$50.00 $4,000.00 $28.00 $2,240.00$0.01 $0.60 $0.01 $0.60$4,000.00 $4,000.00 $4,050.00 $4,050.00$30.00 $6,300.00 $23.00 $4,830.00$25.00 $625.00 $58.00 $1,450.00$1,450.00 $23,200.00 $1,490.00 $23,840.00$1,500.00 $3,000.00 $1,540.00 $3,080.00$50.00 $800.00 $6.00 $96.00$2,000.00 $2,000.00 $2,055.00 $2,055.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 23 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity5054Install electrical service; complete as specifiedEach 1.005130Furnish and install 3" Schedule 40 PVC; complete as specifiedLinear Feet 3,345.005240Furnish and install 6 gauge red-coated wire; complete as specifiedLinear Feet 4,400.005241Furnish and install 6 gauge black-coated wire; complete as specifiedLinear Feet 4,400.005252Furnish and install 8 gauge green-coated wire; complete as specifiedLinear Feet 3,790.005270Furnish and install 12 gauge red-coated wire; complete as specifiedLinear Feet 400.005271Furnish and install 12 gauge black-coated wire; complete as specifiedLinear Feet 400.005272Furnish and install 12 gauge green-coated wire; complete as specifiedLinear Feet 400.005380Furnish and install fuse holder; complete as specifiedEach 40.005392Furnish and install 5A fuse; complete as specifiedEach 40.005410Install light pole and pole arm and acorn pole top light, "CITY Supplied," complete as specifiedEach 20.005504Furnish and install Type 5 base; complete as specifiedEach 20.005506Furnish and install Type 9 base; complete as specifiedEach 1.00Bid Total:Unit PriceExtensionUnit PriceExtensionCarl Bowers & Sons Const Co. Inc.PTS Contractors, Inc$1,200.00 $1,200.00 $1,235.00 $1,235.00$8.00 $26,760.00 $8.25 $27,596.25$1.30 $5,720.00 $1.35 $5,940.00$1.30 $5,720.00 $1.35 $5,940.00$1.00 $3,790.00 $1.05 $3,979.50$0.60 $240.00 $0.65 $260.00$0.60 $240.00 $0.65 $260.00$0.60 $240.00 $0.65 $260.00$50.00 $2,000.00 $51.00 $2,040.00$5.00 $200.00 $6.00 $240.00$750.00 $15,000.00 $775.00 $15,500.00$875.00 $17,500.00 $900.00 $18,000.00$1,500.00 $1,500.00 $1,540.00 $1,540.00$3,308,850.92$3,374,000.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 24 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantitySection 11011Clearing; complete as specifiedInch Diameter 24.001021Grubbing; complete as specifiedInch Diameter 24.001050Mobilization; complete as specifiedLump Sum 1.001100Removing pavement; complete as specifiedSquare Yards 1,650.001120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 38,300.001200Unclassified excavation; complete as specifiedCubic Yards 5,600.001220Excavation special (paving); complete as specifiedTons 1,400.0013017" concrete pavement; with 5" CABC and grading; complete as specifiedSquare Yards 2,700.0013037" concrete pavement HES; with 5" CABC and grading; complete as specifiedSquare Yards 150.0013118" concrete pavement; with 6" CABC and grading; complete as specifiedSquare Yards 7,350.0013138" concrete pavement HES; with 6" CABC and grading; complete as specifiedSquare Yards 450.001334Concrete pavement gaps; complete as specifiedEach 2.001340Crushed aggregate base course; complete as specifiedTons 1,650.001350Pavement ties; complete as specifiedEach 20.00Unit PriceExtension$3,463,563.30$32.72 $785.28$32.72 $785.28$102,159.28 $102,159.28$0.02 $33.00$0.43 $16,469.00$14.18 $79,408.00$0.02 $28.00$40.45 $109,215.00$43.72 $6,558.00$43.11 $316,858.50$46.38 $20,871.00$1,090.80 $2,181.60$6.54 $10,791.00$8.73 $174.60DE GROOT, INC.I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 25 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity1352Drilled dowel bars; 1"; complete as specifiedEach 35.001354Drilled dowel bars; 1 1/4"; complete as specifiedEach 38.001360Adjust manholes and inlets; complete as specifiedEach 47.001370Turf restoration; complete as specifiedSquare Yards 5,900.001372Restore gravel driveway/apron; complete as specifiedSquare Yards 120.001380Cold weather covering (concrete pavement) - single visquine; complete as specifiedSquare Yards 2,150.001390Up-charge for late season cold weather concrete pavement; complete as specifiedCubic Yards 1,350.00141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 180.00144230" curb and gutter; 8"; with 6" CABC and grading; complete as specifiedLinear Feet 90.00144536" curb and gutter; plain; (12" curb head); 8"; with 6" CABC and grading; complete as specifiedLinear Feet 30.001460Sidewalk curb; complete as specifiedLinear Feet 580.0015004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 21,000.0015106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 15,000.00Unit PriceExtensionDE GROOT, INC.$10.91 $381.85$13.09 $497.42$327.24 $15,380.28$9.05 $53,395.00$14.18 $1,701.60$0.02 $43.00$0.02 $27.00$12.00 $2,160.00$39.27 $3,534.30$51.11 $1,533.30$23.84 $13,827.20$5.78 $121,380.00$6.43 $96,450.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 26 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity15146" concrete sidewalk/driveway/ramp (HES) with 3" CABC and grading; complete as specifiedSquare Feet 3,300.0015306" concrete step; complete as specifiedSquare Feet 260.001540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 120.001550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 5,200.001560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 200.001580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 7,900.001590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 1,480.001600Furnish and install tree; complete as specifiedEach 6.001650Locate existing property monuments; complete as specifiedEach 90.001652Replace existing property monuments; complete as specifiedEach 90.001700Sawing existing pavement; complete as specifiedLinear Feet 1,350.001710Sawing concrete pavement full depth; complete as specifiedLinear Feet 150.00Unit PriceExtensionDE GROOT, INC.$6.87 $22,671.00$40.20 $10,452.00$32.72 $3,926.40$0.87 $4,524.00$6.54 $1,308.00$0.22 $1,738.00$0.02 $29.60$490.86 $2,945.16$38.18 $3,436.20$49.09 $4,418.10$2.02 $2,727.00$2.02 $303.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 27 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity1900Tack coat; complete as specifiedGallons 30.0019064" asphaltic pavement LT with 10" CABC and grading; complete as specifiedSquare Yards 130.0019114" asphaltic transition LT with 10" CABC and grading; complete as specifiedSquare Yards 180.0019164" asphaltic surface LT with 6" CABC and grading; complete as specifiedSquare Yards 140.0019172" asphaltic surface LT with 6" CABC and grading; complete as specifiedSquare Yards 100.001918Asphaltic cold weather paving; complete as specifiedSquare Yards 70.002003Furnish and install 12" storm sewer; complete as specifiedLinear Feet 300.002006Furnish and install 15" storm sewer; complete as specifiedLinear Feet 215.002009Furnish and install 18" storm sewer; complete as specifiedLinear Feet 450.002012Furnish and install 21" storm sewer; complete as specifiedLinear Feet 295.002015Furnish and install 24" storm sewer; complete as specifiedLinear Feet 265.002021Furnish and install 30" storm sewer; complete as specifiedLinear Feet 615.00Unit PriceExtensionDE GROOT, INC.$9.82 $294.60$63.27 $8,225.10$52.36 $9,424.80$53.99 $7,558.60$37.63 $3,763.00$59.99 $4,199.30$74.96 $22,488.00$81.14 $17,445.10$79.69 $35,860.50$87.91 $25,933.45$91.19 $24,165.35$111.97 $68,861.55I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 28 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity2024Furnish and install 36" storm sewer; complete as specifiedLinear Feet 465.002027Furnish and install 42" storm sewer; complete as specifiedLinear Feet 255.002201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 20.002202Furnish and install standard storm sewer manhole (5' diameter); complete as specifiedVertical Feet 31.502203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 22.502235Furnish and install Type 1 inlet (with 18" sump); complete as specifiedEach 1.002237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 18.002400Furnish and install 6" storm sewer lateral; complete as specifiedLinear Feet 2,680.002404Furnish and install storm sewer marker balls; complete as specifiedEach 155.002406Furnish and install storm sewer clay dams; complete as specifiedEach 77.002408Furnish and install storm sewer lateral inlet; complete as specifiedEach 77.002414Storm lateral inlet adjustments; complete as specifiedEach 77.00Unit PriceExtensionDE GROOT, INC.$127.05 $59,078.25$170.02 $43,355.10$828.03 $16,560.60$988.90 $31,150.35$875.67 $19,702.58$2,170.75 $2,170.75$2,317.58 $41,716.44$53.67 $143,835.60$60.60 $9,393.00$151.50 $11,665.50$585.80 $45,106.60$202.00 $15,554.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 29 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity2508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 48.002510Sediment removal - Type D modified inlet protection; complete as specifiedEach 48.002516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 41.002750Rock excavation; complete as specifiedCubic Yards 10.002800Abandon 8" - 12" storm sewer; complete as specifiedLinear Feet 595.002802Abandon 15" and larger storm sewer; complete as specifiedLinear Feet 1,700.002804Remove 30" and smaller storm sewer; complete as specifiedLinear Feet 335.002810Abandon storm sewer manholes and inlets; complete as specifiedEach 9.002812Remove storm sewer manholes and inlets; complete as specifiedEach 14.002850Connect to existing storm sewer main; complete as specifiedEach 7.002852Connect to existing storm sewer lateral; complete as specifiedEach 3.002858Connect to existing storm sewer inlet; complete as specifiedEach 1.002914Storm sewer utility line opening (ULO); complete as specifiedEach 3.00Unit PriceExtensionDE GROOT, INC.$76.36 $3,665.28$5.45 $261.60$8.73 $357.93$1.01 $10.10$6.06 $3,605.70$14.14 $24,038.00$28.28 $9,473.80$454.50 $4,090.50$505.00 $7,070.00$2,154.76 $15,083.32$1,022.12 $3,066.36$1,527.12 $1,527.12$1,212.00 $3,636.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 30 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity2950Excavation special (storm); complete as specifiedTons 25.003000Furnish and install 8" sanitary sewer (relay); complete as specifiedLinear Feet 2,480.003060Furnish and install 8" sanitary sewer drop; complete as specifiedVertical Feet 3.003100Furnish and install standard sanitary sewer manhole (4' diameter); complete as specifiedVertical Feet 85.003114Furnish and install external sanitary sewer manhole chimney seal; complete as specifiedEach 7.003116Furnish and install external sanitary sewer manhole chimney seal extension; complete as specifiedEach 1.003118Furnish and install internal sanitary sewer manhole chimney seal; complete as specifiedEach 1.003120Furnish and install internal sanitary sewer manhole chimney seal extension; complete as specifiedEach 1.003210Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specifiedEach 81.003230Furnish and install 4" sanitary sewer laterals (new); complete as specifiedLinear Feet 70.00Unit PriceExtensionDE GROOT, INC.$15.15 $378.75$137.00 $339,760.00$555.50 $1,666.50$357.73 $30,407.05$454.50 $3,181.50$404.00 $404.00$454.50 $454.50$404.00 $404.00$671.65 $54,403.65$81.59 $5,711.30I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 31 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity3231Furnish and install 4" sanitary sewer riser (new); complete as specifiedLinear Feet 4.003234Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specifiedLinear Feet 2,767.003235Furnish and install 4"/6" sanitary sewer riser (relay); complete as specifiedLinear Feet 243.003236Furnish and install sanitary sewer lateral marker balls; complete as specifiedEach 162.003238Furnish and install clay dams; complete as specifiedEach 81.003300Furnish and install connection to existing 8" sanitary sewer mains; complete as specifiedEach 3.003330Furnish and install sanitary sewer concrete collars; complete as specifiedEach 1.003404Furnish and install 10" sanitary sewer open cut casing pipes; complete as specifiedLinear Feet 80.003600Rock excavation; complete as specifiedCubic Yards 72.003700Closed circuit televising; complete as specifiedLinear Feet 2,480.003710Closed circuit televising - using push camera; complete as specifiedEach 2.003800Abandon sanitary sewer manholes; complete as specifiedEach 8.00Unit PriceExtensionDE GROOT, INC.$222.20 $888.80$90.07 $249,223.69$160.82 $39,079.26$60.60 $9,817.20$151.50 $12,271.50$5,065.15 $15,195.45$505.00 $505.00$96.94 $7,755.20$1.01 $72.72$1.41 $3,496.80$245.43 $490.86$656.50 $5,252.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 32 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity3802Abandon 8" sanitary sewer; complete as specifiedLinear Feet 1,660.003804Abandon 10" sanitary sewer; complete as specifiedLinear Feet 565.003852Remove sanitary sewer manholes; complete as specifiedEach 4.003854Remove sanitary sewer; complete as specifiedLinear Feet 262.503890Sanitary sewer utility line opening (ULO); complete as specifiedEach 2.003892Excavation special (sanitary); complete as specifiedTons 25.004002Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 80.004004Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 805.004010Furnish and install 16" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 1,770.004036Furnish and install 1" water service (relay); complete as specifiedLinear Feet 2,807.004048Furnish and install 1" corporation and stop box; complete as specifiedEach 82.004055Furnish and install water service clay dams; complete as specifiedEach 82.00Unit PriceExtensionDE GROOT, INC.$3.03 $5,029.80$4.04 $2,282.60$858.50 $3,434.00$45.45 $11,930.63$1,212.00 $2,424.00$15.15 $378.75$101.45 $8,116.00$92.94 $74,816.70$136.71 $241,976.70$70.65 $198,314.55$852.78 $69,927.96$151.50 $12,423.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 33 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity4058Furnish and install connections to existing 6" water main; complete as specifiedEach 1.004060Furnish and install connections to existing 8" water main; complete as specifiedEach 3.004066Furnish and install connections to existing 16" water main; complete as specifiedEach 1.004110Furnish and install 8" x 6" water main tee; complete as specifiedEach 1.004111Furnish and install 8" x 8" water main tee; complete as specifiedEach 1.004137Furnish and install 16" x 6" water main tee; complete as specifiedEach 4.004138Furnish and install 16" x 8" water main tee; complete as specifiedEach 1.004141Furnish and install 16" x 16" water main tee; complete as specifiedEach 1.004236Furnish and install 6" 45 degree water main bend; complete as specifiedEach 14.004237Furnish and install 8" 45 degree water main bend; complete as specifiedEach 2.004240Furnish and install 16" 45 degree water main bend; complete as specifiedEach 2.004273Furnish and install 16" x 6" water main reducer; complete as specifiedEach 1.00Unit PriceExtensionDE GROOT, INC.$2,247.25 $2,247.25$2,819.92 $8,459.76$4,287.45 $4,287.45$736.29 $736.29$872.64 $872.64$1,946.27 $7,785.08$4,221.80 $4,221.80$2,981.52 $2,981.52$522.17 $7,310.38$601.96 $1,203.92$1,861.43 $3,722.86$1,410.97 $1,410.97I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 34 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity4274Furnish and install 16" x 8" water main reducer; complete as specifiedEach 1.004401Furnish and install 6" water main gate valve; complete as specifiedEach 5.004402Furnish and install 8" water main gate valve; complete as specifiedEach 6.004405Furnish and install 16" water main gate valve; complete as specifiedEach 7.004500Furnish and install hydrant; complete as specifiedEach 5.004712Furnish and install 2" water main casing pipe; complete as specifiedLinear Feet 80.004800Rock excavation; complete as specifiedCubic Yards 60.004900Abandon water main on Ceape Avenue; complete as specifiedLump Sum 1.004920Remove water main; complete as specifiedLinear Feet 210.004990Excavation special (water); complete as specifiedTons 25.005013Furnish and install pull box (non-conductive); 18" x 36"; complete as specifiedEach 16.005017Furnish and install pull box - non-conductive, 24" x 36"; complete as specifiedEach 2.005025Adjust pull box; complete as specifiedEach 16.005051Install CITY-supplied lighting control cabinet; complete as specifiedEach 1.00Unit PriceExtensionDE GROOT, INC.$1,400.87 $1,400.87$1,383.30 $6,916.50$1,906.48 $11,438.88$7,545.31 $52,817.17$4,493.49 $22,467.45$55.55 $4,444.00$1.01 $60.60$4,545.00 $4,545.00$25.25 $5,302.50$15.15 $378.75$1,581.66 $25,306.56$1,636.20 $3,272.40$5.45 $87.20$2,181.60 $2,181.60I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 35 of 363/8/2021 Contract 21-05 - Ceape Avenue Reconstruction (#7578439)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 03/08/2021 11:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantity5054Install electrical service; complete as specifiedEach 1.005130Furnish and install 3" Schedule 40 PVC; complete as specifiedLinear Feet 3,345.005240Furnish and install 6 gauge red-coated wire; complete as specifiedLinear Feet 4,400.005241Furnish and install 6 gauge black-coated wire; complete as specifiedLinear Feet 4,400.005252Furnish and install 8 gauge green-coated wire; complete as specifiedLinear Feet 3,790.005270Furnish and install 12 gauge red-coated wire; complete as specifiedLinear Feet 400.005271Furnish and install 12 gauge black-coated wire; complete as specifiedLinear Feet 400.005272Furnish and install 12 gauge green-coated wire; complete as specifiedLinear Feet 400.005380Furnish and install fuse holder; complete as specifiedEach 40.005392Furnish and install 5A fuse; complete as specifiedEach 40.005410Install light pole and pole arm and acorn pole top light, "CITY Supplied," complete as specifiedEach 20.005504Furnish and install Type 5 base; complete as specifiedEach 20.005506Furnish and install Type 9 base; complete as specifiedEach 1.00Bid Total:Unit PriceExtensionDE GROOT, INC.$1,308.96 $1,308.96$8.73 $29,201.85$1.41 $6,204.00$1.41 $6,204.00$1.09 $4,131.10$0.66 $264.00$0.66 $264.00$0.66 $264.00$54.54 $2,181.60$5.45 $218.00$818.10 $16,362.00$954.45 $19,089.00$1,636.20 $1,636.20$3,463,563.30I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-05 Ceape Ave\Project_Information\Contract Info\21-05 Bid Tab_3-8-21Page 36 of 363/8/2021