Loading...
HomeMy WebLinkAbout16. 21-118MARCH 9, 2021 21-118 RESOLUTION BOILER & COOLING TOWER PUMP REPLACEMENT FOR GENERAL SERVICES ($120,800.00) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids to replace the second boiler and cooling tower pumps for City Hall; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: REEKE-MAROLD CO INC. 1337 S Broadway Green Bay, WI 54304 Total Bid: $120,800.00 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bids are hereby accepted and the proper City officials are hereby authorized and directed to enter into appropriate agreements for the purpose of same, all according to plans, specifications, and bids on file. Money for this purpose is hereby appropriated from: Acct. No. 0323 0130 7214 63035 HVAC/Roofing Replacement Program (CARRIED__6-0__ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID TO REEKE-MAROLD CO. INC. FOR CITY HALL City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: March 2, 2021 RE: Award Bid to Reeke-Marold Co. Inc. for City Hall Boiler and Cooling Tower Pump Replacement for General Services ($120,800.00) BACKGROUND The Facilities Maintenance Division works closely with our HVAC engineer from McMahon & Associates to regularly monitor, update and prioritize the annual replacement schedule for our building’s HVAC systems and equipment. The 2021 CIP Roofing/HVAC CIP was allocated $500,000.00. The next project priority is to replace the second boiler and cooling tower pumps for City Hall. The boiler is 34 years old, only 82% energy efficient and has far exceeded its normal service life. The boiler will be replaced with a 95% energy efficient unit. The two cooling tower pumps are 31 years old and are also recommended for replacement due to their age. The pumps circulate cooling tower water for removing heat from the chiller system. Because of the higher energy efficiency of these new units McMahon estimates the City will realize a Focus on Energy rebate of $9,000.00 upon project completion. ANALYSIS Working with McMahon and Facilities Maintenance staff, Purchasing prepared bid specifications for this project. The bid was advertised in the local newspaper. Bids were due February 25, 2021. The bid tab is attached. It was the consensus of McMahon and City staff that the Reeke-Marold Co. Inc. bid met all the minimum bid requirements. FISCAL IMPACT The fiscal impact of this bid is $120,800.00. This bid, added to McMahon’s engineering fee of $10,700 brings the total fiscal impact of this project to $131,500.00. The 2021 Roofing/HVAC Fund has been allocated $500,000.00. With the inclusion of this project and factoring in current/pending projects, the HVAC/Roofing CIP Fund has sufficient funds for this project. This project will be charged to A/N#: 0323 0130 7214 63035 (HVAC/Roofing Replacement Program). RECOMMENDATION Purchasing recommends the Common Council award this bid to Reeke-Marold Co. Inc. for $120,800.00. Respectfully Submitted, Approved: Jon G. Urben, General Services Manager Mark A. Rohloff, City Manager BID TAB OSHKOSH CITY HALL BOILER AND COOLING TOWER PUMP REPLACEMENT BIDS OPENED FEBRUARY 25, 2021 VENDOR INFORMATION BID ADDENDUM 1 & 2 PREQUAL BID BOND August Winters & Sons Inc. 2323 N Roemer Road $127,500.00 X X X Appleton, WI 54911 B-P Mechanical Inc. 3200 W Highview Drive $128,688.00 X X X Appleton, WI 54914 EGI Mechanical Inc. 1000 East Pearl St. $121,000.00 X X X PO Box 65 Seymour, WI 54165 Hurckman Mechanical Industries Inc. 1450 Velp Ave. $148,900.00 X X X Green Bay, WI 54303 Reeke-Marold Co Inc. 1337 S Broadway $120,800.00 X X X Green Bay, WI 54304 Southport Engineered Systems 1343 S 27th Street $125,950.00 X X X Caledonia, WI 53108 Wisconsin Mechanical Solutions 1045 Indianhead Dr. $164,400.00 X X X Mosinee, WI 54455