Loading...
HomeMy WebLinkAbout08. 21-110MARCH 9, 2021 21-110 RESOLUTION PURPOSE: APPROVE CHANGE ORDER NO. 1 (FINAL) FOR PUBLIC WORKS CONTRACT NO. 20-07 WATER MAIN AND MISCELLANEOUS UTILITY IMPROVEMENTS / DEGROOT, INC. (-$143,300.36) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change Order, a copy of which is attached, is hereby approved: DE GROOT, INC. 4201 Champion Road Green Bay, WI 54311 Net Decrease to Contract: -$143,300.36 PURPOSE: See attached Change Order. Acct. Nos. 03150410-7480 Streets-TSF to Contract Control 03170410-7480-03303 Special Assessment-TSF to Contract Control- Water Special Assessments 03170410-7480-03302 Special Assessment-TSF to Contract Control- Sewer Special Assessments 03170410-7480-03305 Special Assessment-TSF to Contract Control- Storm Sewer Special Assessments 03210410-6801-04007 Contract Control-Paving-20-07 Misc Utility Improvements 03210410-6802-04007 Contract Control-Sanitary Sewer-20-07 Misc Utility Improvements 03210410-6803-04007 Contract Control-Water Main-20-07 Misc Utility Improvements 03210410-6804-04007 Contract Control-Storm Sewer-20-07 Misc Utility Improvements (CARRIED__6-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______) TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: March 4, 2021 RE: Change Order No. 1 (Final) for Public Works Contract No. 20-07 Water Main and Miscellaneous Utility Improvements / De Groot, Inc. (-$143,300.36) BACKGROUND Change Order No. 1 (Final) for Contract 20-07 is scheduled for consideration by the Common Council at the March 9, 2021 meeting. The Contract was originally awarded to DeGroot, Inc. in May of 2020. ANALYSIS Following is a summary of the significant changes to each section of the CIP:  Streets – Final quantities adjusted to match field conditions.  Storm Sewer – During construction, it was determined several storm sewer mains and structures were beyond conventional repair methods and needed to be replaced. Additionally, two (2) storm laterals were added to the Contract.  Sanitary Sewer – Final quantities adjusted to match field conditions.  Water Main – Final quantities adjusted to match field conditions. FISCAL IMPACT Contract Section Change Order Amount Estimated Total Construction Costs CIP Budget Amount Street $3,079.71 $20,137.59 $25,000 Storm Sewer $21,719.51 $48,047.55 $100,000 Sanitary Sewer $10,517.11 $384,265.00 $648,900 Water Main -$178,616.69 $2,091,746.40 $3,207,100 Total -$143,300.36 $2,544,196.54 $3,981,000 Adequate funds are available in the relating sections of the 2020 Capital Improvement Budget (Account #03150410-7480/Streets-TSF to Contract Control, #03170410-7480-03303/Special Assessment-TSF to Contract Control-Water Special Assessments, #03170410-7480- 03302/Special Assessment-TSF to Contract Control-Sewer Special Assessments, #03170410- 7480-03305/Special Assessment-TSF to Contract Control-Storm Sewer Special Assessments, #03210410-6801-04007/ Contract Control-Paving-20-07 Misc. Utility Improvements, #03210410- 6802-04007/Contract Control-Sanitary Sewer-20-07 Misc. Utility Improvements, #03210410- 6803-04007/Contract Control-Water Main-20-07 Misc. Utility Improvements, and #03210410- 6804-04007/Contract Control-Storm Sewer-20-07 Misc. Utility Improvements. RECOMMENDATIONS I recommend approval of Change Order No. 1 (Final) to Contact No. 20-07 in the amount of - $143,300.36 to DeGroot, Inc. Approved: Mark A. Rohloff City Manager JLG/tlt