HomeMy WebLinkAbout05. 21-88FEBRUARY 23, 2021 21-88 RESOLUTION
ADVANCE CONSTRUCTION, INC. FOR OREGON STREET AND
FOND DU LAC ROAD SANITARY INTERCEPTOR SEWER
CONSTRUCTION ($7,646,222.99)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for the Oregon
Street and Fond du Lac Road sanitary interceptor sewer construction; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following
is the most advantageous bid:
ADVANCE CONSTRUCTION INC.
2141 Woodale Avenue
Green Bay, WI 54313
Total Bid (Base Bid with Alt. No. 2): $7,646,222.99
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,
all according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 03170410-7480-03302 Special Assessments-TSF to Contract Control-
Sewer Special Assessments
03210410-6801-04103 Contract Control-Paving-21-03 Oregon Intr
Fond du Lac SS
03210410-6802-04103 Contract Control-Sanitary Sewer-21-03 Oregon
Intr Fond du Lac SS
03210410-6803-04103 Contract Control-Water Main-21-03 Oregon Intr
Fond du Lac SS
(CARRIED__7-0___ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 21-03 TO
FEBRUARY 23, 2021 21-88 RESOLUTION
CONT’D
03210410-6804-04103 Contract Control-Storm Sewer-21-03 Oregon
Intr Fond du Lac SS
03210410-6806-04126 Contract Control-Sidewalk-Annual-New
Sidewalk Ordered In
I:\City Manager\Diane\1AGENDA PREP\2.23 word memos\5.docx Page 1 of 2
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager / City Engineer
DATE: February 18, 2021
RE: Award Bid for Public Works Contract No. 21-03
Oregon Street and Fond du Lac Road Sanitary Interceptor Sewer Construction
Advance Construction, Inc. / ($7,646,222.99)
BACKGROUND
The purpose of this Project is to construct a sanitary interceptor sewer on Oregon Street, from
West 28th Avenue to West Waukau Avenue, and to relay a sanitary interceptor sewer on Fond du
Lac Road, from the West 28th Avenue Pump Station to the Waukau Avenue Pump Station. This
will eliminate the Waukau Avenue Pump Station. Sanitary sewer and laterals, water main and
laterals, and storm sewer and laterals will be installed, replaced, or repaired, as necessary, prior
to placing the concrete pavement patch. New sidewalk will be installed on Oregon Street (west
side) from West 29th Avenue to West Waukau Avenue and on West Waukau Avenue (south side)
from Oregon Street to the Gallups/Merritts Creek Bridge. New concrete driveway aprons will be
constructed as necessary, provided property owners have returned the Construction Access
Agreement the City mailed to them.
Sidewalks and drive aprons abutting properties whose property owners have not returned the
Construction Access Agreement will have partial sidewalk sections removed and patched. In 2022,
property owners will be responsible for repairing drive aprons and all patched and non-ADA
compliant sidewalks that cannot be constructed with this Project.
Additionally, this Project will construct a new Oregon Street Gallups/Merritts Creek crossing.
The Winnebago County Highway Department inspects all bridges within the City of Oshkosh on
a bi-annual basis in accordance with Wisconsin Department of Transportation (WDOT)
requirements. Those reports are submitted to the WDOT upon completion. An inspection
completed in late 2019 indicated the deterioration of this structure exceeded typical repair
methods and the structure needed to be considered for replacement in the near future. The report
also indicated there is significant cracking; and that ninety percent (90%) of the surface is patched,
cracked, or delaminated. Delamination is the separation of the steel reinforcemen t from the
concrete structure.
£ _'A· gr Oshkosh
I:\City Manager\Diane\1AGENDA PREP\2.23 word memos\5.docx Page 2 of 2
ANALYSIS
Engineering staff reviewed three (3) bids. The Bid Documents contained two (2) alternative pipe
materials for installation of the large sanitary interceptor pipes. One (1) of the alternatives must
be awarded. After review of the alternatives, it is recommended to award Alternate No. 2 with
the Base Bid. The low Bid with Alternate No. 2 is $7,646,222.99 from Advance Construction, Inc.
of Green Bay, Wisconsin.
FISCAL IMPACT
Funding for the Oregon Street and Fond du Lac Road Sanitary Interceptor Sewer Project is in the
2021 Capital Improvement Program (CIP) (Account #03170410-7480-03302 Special Assessments-
TSF to Contract Control-Sewer Special Assessments; #03210410-6801-04103 Contract Control-
Paving-21-03 Oregon Intr Fond du Lac SS; #03210410-6802-04103 Contract Control-Sanitary
Sewer-21-03 Oregon Intr Fond du Lac SS; #03210410-6803-04103 Contract Control-Water Main-
21-03 Oregon Intr Fond du Lac SS; #03210410-6804-04103 Contract Control-Storm Sewer-21-03
Oregon Intr Fond du Lac SS, and #03210410-6806-04126 Contract Control-Sidewalk-Annual-New
Sidewalk Ordered In). Additional funding for the Storm Water portion of the Project is available
from previous CIP projects which have come in under budget. Following is a summary of the
available funds and the estimated total construction cost, including ancillary costs such as
engineering fees, landfill tipping fees, construction materials testing fees, and other construction-
related expenses. Special Assessments will be levied to adjoining property owners per the City’s
Special Assessment Policy.
CIP Section CIP Funds Budgeted
Estimated Total
Construction Cost
Street $300,000 $193,524
Storm Sewer $475,000 $444,133
Sanitary Sewer $8,026,000 $7,875,282
Water Main $100,000 $82,709
Sidewalk $70,000 $57,208
Totals $8,971,000 $8,652,856
RECOMMENDATIONS
I recommend award to the low bidder, Advance Construction, Inc. in the amount of $7,646,222.99.
Approved:
Mark A. Rohloff
City Manager
JG/tlt
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionSection 1: Work Unit A$5,766,353.29$5,777,341.55A-1012Limbing existing trees; complete as specifiedEach 20.00 $450.00 $9,000.00 $290.00 $5,800.00A-1050Mobilization; complete as specifiedLump Sum 1.00 $420,000.00 $420,000.00 $1,367,500.00 $1,367,500.00A-1100Removing pavement; complete as specifiedSquare Yards 50.00 $10.00 $500.00 $20.00 $1,000.00A-1120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 4,710.00 $0.65 $3,061.50 $1.50 $7,065.00A-1220Excavation special (paving); complete as specifiedTons 475.00 $20.00 $9,500.00 $9.75 $4,631.25A-13087" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedSquare Yards 2,625.00 $52.78 $138,547.50 $49.50 $129,937.50A-13188" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedSquare Yards 266.00 $54.11 $14,393.26 $71.75 $19,085.50A-13198" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedSquare Yards 1,234.00 $57.11 $70,473.74 $73.35 $90,513.90Advance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 1 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-13299" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedSquare Yards 992.00 $65.71 $65,184.32 $75.75 $75,144.00A-13338" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control at STA 155+70 to STA 174+55 on Oregon Street; complete as specifiedLinear Feet 1,728.00 $178.73 $308,845.44 $117.00 $202,176.00A-1334Concrete pavement gaps; complete as specifiedEach 11.00 $1,000.00 $11,000.00 $256.00 $2,816.00A-13359" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control at STA 20+37 to STA 46+46 on Fond du Lac Road; complete as specifiedLinear Feet 2,860.00 $105.00 $300,300.00 $127.50 $364,650.00A-1336Furnish and install 6" perforated underdrain; complete as specifiedLinear Feet 200.00 $40.00 $8,000.00 $24.00 $4,800.00A-1360Adjust manholes and inlets; complete as specifiedEach 69.00 $300.00 $20,700.00 $334.00 $23,046.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 2 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-1370ATurf restoration on Fond du Lac Avenue; complete as specifiedSquare Yards 627.30 $6.10 $3,826.53 $8.25 $5,175.23A-1370BTurf restoration on Oregon Street; complete as specifiedSquare Yards 1,609.70 $6.10 $9,819.17 $8.25 $13,280.03A-1370CTurf restoration on East Waukau Avenue; complete as specifiedSquare Yards 474.00 $6.10 $2,891.40 $8.25 $3,910.50A-1380Cold weather covering (concrete pavement) - single visquine; complete as specifiedSquare Yards 500.00 $1.50 $750.00 $0.01 $5.00A-1382Cold weather covering (concrete pavement) - double visquine; complete as specifiedSquare Yards 300.00 $2.50 $750.00 $0.01 $3.00A-1384Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as Square Yards 170.00 $10.00 $1,700.00 $0.01 $1.70A-1390Up-charge for late season cold weather concrete pavement; complete as specifiedCubic Yards 170.00 $5.00 $850.00 $0.01 $1.70A-141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 265.00 $11.00 $2,915.00 $15.50 $4,107.50A-144830" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedLinear Feet 335.00 $37.00 $12,395.00 $32.25 $10,803.75A-1460Sidewalk curb; complete as specifiedLinear Feet 240.00 $15.00 $3,600.00 $32.50 $7,800.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 3 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-15004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 6,935.00 $5.10 $35,368.50 $5.55 $38,489.25A-15106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 1,115.00 $5.45 $6,076.75 $6.15 $6,857.25A-15208" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 790.00 $6.15 $4,858.50 $7.20 $5,688.00A-1540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 60.00 $30.00 $1,800.00 $31.00 $1,860.00A-1550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 712.00 $1.00 $712.00 $1.30 $925.60A-1560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 102.00 $5.00 $510.00 $6.15 $627.30A-1580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 965.00 $0.10 $96.50 $0.01 $9.65A-1582Cold weather covering (sidewalk) - double visquine; complete as specifiedSquare Feet 200.00 $0.20 $40.00 $0.01 $2.00A-1590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 225.00 $5.00 $1,125.00 $0.01 $2.25A-1650Locate existing property monuments; complete as specifiedEach 21.00 $125.00 $2,625.00 $130.00 $2,730.00A-1651Replace section corner; complete as specifiedEach 1.00 $500.00 $500.00 $515.00 $515.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 4 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-1652Replace existing property monuments; complete as specifiedEach 8.00 $50.00 $400.00 $6.00 $48.00A-1700Sawing existing pavement; complete as specifiedLinear Feet 118.00 $3.50 $413.00 $6.00 $708.00A-1710Sawing concrete pavement full depth; complete as specifiedLinear Feet 120.00 $3.50 $420.00 $11.50 $1,380.00A-1900Tack coat; complete as specifiedGallons 10.00 $10.93 $109.30 $86.50 $865.00A-19114" asphaltic transition LT with 10" CABC and grading; complete as specifiedSquare Yards 20.00 $93.00 $1,860.00 $98.00 $1,960.00A-19164" asphaltic surface LT with 6" CABC and grading; complete as specifiedSquare Yards 104.00 $58.14 $6,046.56 $66.00 $6,864.00A-2002Furnish and install 10" storm sewer; complete as specifiedLinear Feet 40.00 $75.00 $3,000.00 $108.00 $4,320.00A-2003Furnish and install 12" storm sewer; complete as specifiedLinear Feet 205.00 $65.00 $13,325.00 $102.00 $20,910.00A-2006Furnish and install 15" storm sewer; complete as specifiedLinear Feet 345.00 $70.00 $24,150.00 $102.00 $35,190.00A-2009Furnish and install 18" storm sewer; complete as specifiedLinear Feet 240.00 $74.00 $17,760.00 $122.00 $29,280.00A-2015Furnish and install 24" storm sewer; complete as specifiedLinear Feet 75.00 $90.00 $6,750.00 $128.00 $9,600.00A-2016Furnish and install 24" RCP Class III storm sewer; complete as specifiedLinear Feet 30.00 $95.00 $2,850.00 $124.00 $3,720.00A-2021Furnish and install 30" storm sewer; complete as specifiedLinear Feet 860.00 $105.00 $90,300.00 $112.00 $96,320.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 5 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-2025Furnish and install 36" RCP Class III storm sewer; complete as specifiedLinear Feet 40.00 $190.00 $7,600.00 $149.00 $5,960.00A-2027Furnish and install 42" storm sewer; complete as specifiedLinear Feet 15.00 $130.00 $1,950.00 $295.00 $4,425.00A-2049Furnish and install 24" x 38" HERCP Class III storm sewer; complete as specifiedLinear Feet 35.00 $130.00 $4,550.00 $207.00 $7,245.00A-2051Furnish and install 29" x 45" HERCP Class III storm sewer; complete as specifiedLinear Feet 355.00 $145.00 $51,475.00 $155.00 $55,025.00A-2157Furnish and install 29" x 45" RCP Class III apron endwall with joint ties; complete as specifiedEach 1.00 $2,960.00 $2,960.00 $5,955.00 $5,955.00A-2201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 25.00 $400.00 $10,000.00 $432.00 $10,800.00A-2202Furnish and install standard storm sewer manhole (5' diameter); complete as specifiedVertical Feet 7.50 $500.00 $3,750.00 $525.00 $3,937.50A-2203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 7.00 $674.00 $4,718.00 $695.00 $4,865.00A-2205Furnish and install standard storm sewer manhole (8' diameter); complete as specifiedVertical Feet 12.00 $1,100.00 $13,200.00 $968.00 $11,616.00A-2213Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specifiedVertical Feet 27.00 $482.00 $13,014.00 $475.00 $12,825.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 6 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-2217Furnish and install standard storm sewer inlet manhole (8' diameter); complete as specifiedVertical Feet 6.00 $1,280.00 $7,680.00 $1,035.00 $6,210.00A-2237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 5.00 $2,350.00 $11,750.00 $1,955.00 $9,775.00A-2402Furnish and install 8" storm sewer lateral; complete as specifiedLinear Feet 52.00 $50.00 $2,600.00 $73.00 $3,796.00A-2404Furnish and install storm sewer marker balls; complete as specifiedEach 8.00 $24.00 $192.00 $50.00 $400.00A-2406Furnish and install storm sewer clay dams; complete as specifiedEach 4.00 $380.00 $1,520.00 $115.00 $460.00A-2408Furnish and install storm sewer lateral inlet; complete as specifiedEach 1.00 $1,000.00 $1,000.00 $615.00 $615.00A-2414Storm lateral inlet adjustments; complete as specifiedEach 1.00 $300.00 $300.00 $1.00 $1.00A-2508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 65.00 $125.00 $8,125.00 $72.00 $4,680.00A-2510Sediment removal - Type D modified inlet protection; complete as specifiedEach 30.00 $10.00 $300.00 $6.00 $180.00A-2512Furnish; install; maintain; and remove stone tracking pad; complete as Each 2.00 $2,000.00 $4,000.00 $1.00 $2.00A-2516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 60.00 $10.00 $600.00 $11.00 $660.00A-2518Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specifiedLinear Feet 60.00 $8.50 $510.00 $11.00 $660.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 7 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-2522Furnish; install; maintain; and remove ditch check; complete as specifiedEach 10.00 $82.50 $825.00 $51.00 $510.00A-2524Furnish; install; maintain; and remove dewatering tank system; complete as specifiedEach 3.00 $5,000.00 $15,000.00 $1,160.00 $3,480.00A-2526Furnish; install; maintain; and remove turbidity barrier; complete as specifiedEach 1.00 $22,000.00 $22,000.00 $1,740.00 $1,740.00A-2600Furnish and install topsoil 6" depth; complete as specifiedSquare Yards 85.00 $4.00 $340.00 $10.00 $850.00A-2620Furnish and install turf grass; complete as specifiedSquare Yards 85.00 $2.10 $178.50 $1.00 $85.00A-2631Furnish and install Class I; Type B erosion control mat; complete as Square Yards 85.00 $2.00 $170.00 $2.00 $170.00A-2650Furnish and install heavy rip-rap with filter fabric; complete as specifiedSquare Yards 40.00 $70.00 $2,800.00 $80.00 $3,200.00A-2802Abandon 15" and larger storm sewer; complete as specifiedLinear Feet 40.00 $13.00 $520.00 $33.00 $1,320.00A-2804Remove 30" and smaller storm sewer; complete as specifiedLinear Feet 50.00 $45.00 $2,250.00 $42.00 $2,100.00A-2810Abandon storm sewer manholes and inlets; complete as specifiedEach 1.00 $500.00 $500.00 $435.00 $435.00A-2812Remove storm sewer manholes and inlets; complete as specifiedEach 3.00 $550.00 $1,650.00 $605.00 $1,815.00A-2850Connect to existing storm sewer main; complete as specifiedEach 16.00 $1,000.00 $16,000.00 $1,120.00 $17,920.00A-2852Connect to existing storm sewer lateral; complete as specifiedEach 4.00 $250.00 $1,000.00 $285.00 $1,140.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 8 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-2856Connect to existing storm sewer manhole; complete as specifiedEach 2.00 $1,000.00 $2,000.00 $1,625.00 $3,250.00A-2950Excavation special (storm); complete as specifiedTons 50.00 $20.00 $1,000.00 $11.50 $575.00A-3000Furnish and install 8" sanitary sewer (relay); complete as specifiedLinear Feet 515.00 $170.00 $87,550.00 $175.00 $90,125.00A-3002Furnish and install 10" sanitary sewer (relay); complete as specifiedLinear Feet 220.00 $174.00 $38,280.00 $178.00 $39,160.00A-3004Furnish and install 12" sanitary sewer (relay); complete as specifiedLinear Feet 32.00 $180.00 $5,760.00 $195.00 $6,240.00A-3010Furnish and install 21" sanitary sewer (relay); complete as specifiedLinear Feet 3,230.00 $565.00 $1,824,950.00 $426.00 $1,375,980.00A-3060Furnish and install 8" sanitary sewer drop; complete as specifiedVertical Feet 67.00 $400.00 $26,800.00 $383.00 $25,661.00A-3062Furnish and install 10" sanitary sewer drop; complete as specifiedVertical Feet 17.00 $400.00 $6,800.00 $462.00 $7,854.00A-3064Furnish and install 12" sanitary sewer drop; complete as specifiedVertical Feet 3.00 $577.00 $1,731.00 $595.00 $1,785.00A-3100Furnish and install standard sanitary sewer manhole (4' diameter); complete as specifiedVertical Feet 324.00 $510.00 $165,240.00 $304.00 $98,496.00A-3114Furnish and install external sanitary sewer manhole chimney seal; complete as specifiedEach 28.00 $400.00 $11,200.00 $610.00 $17,080.00A-3116Furnish and install external sanitary sewer manhole chimney seal extension; complete as specifiedEach 3.00 $300.00 $900.00 $465.00 $1,395.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 9 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-3210Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specifiedEach 4.00 $77.00 $308.00 $102.00 $408.00A-3222Furnish and install 6" sanitary sewer "Insert-A-Tee" or "Kor-N-Tee"; complete as specifiedEach 40.00 $300.00 $12,000.00 $372.00 $14,880.00A-3234Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specifiedLinear Feet 986.00 $172.00 $169,592.00 $134.00 $132,124.00A-3235Furnish and install 4"/6" sanitary sewer riser (relay); complete as specifiedLinear Feet 450.00 $172.00 $77,400.00 $63.00 $28,350.00A-3236Furnish and install sanitary sewer lateral marker balls; complete as specifiedEach 80.00 $24.00 $1,920.00 $45.00 $3,600.00A-3238Furnish and install clay dams; complete as specifiedEach 35.00 $600.00 $21,000.00 $145.00 $5,075.00A-3300Furnish and install connection to existing 8" sanitary sewer mains; complete as specifiedEach 9.00 $950.00 $8,550.00 $1,410.00 $12,690.00A-3302Furnish and install connection to existing 10" sanitary sewer mains; complete as specifiedEach 5.00 $1,000.00 $5,000.00 $1,510.00 $7,550.00A-3304Furnish and install connection to existing 12" sanitary sewer mains; complete as specifiedEach 1.00 $1,100.00 $1,100.00 $1,895.00 $1,895.00A-3310Furnish and install connection to existing 21" sanitary sewer mains; complete as specifiedEach 1.00 $8,800.00 $8,800.00 $792,018.79 $792,018.79I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 10 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-3330Furnish and install sanitary sewer concrete collars; complete as specifiedEach 2.00 $1,500.00 $3,000.00 $1.00 $2.00A-3332Core into existing manhole; complete as specifiedEach 1.00 $800.00 $800.00 $1.00 $1.00A-3424Furnish and install 60" sanitary sewer open cut casing pipes; complete as specifiedLinear Feet 100.00 $560.00 $56,000.00 $1,000.00 $100,000.00A-3601Rock excavation; complete as specifiedLinear Feet 4,381.00 $270.00 $1,182,870.00 $0.01 $43.81A-3700Closed circuit televising; complete as specifiedLinear Feet 5,842.00 $3.71 $21,673.82 $1.30 $7,594.60A-3710Closed circuit televising - using push camera; complete as specifiedEach 3.00 $225.00 $675.00 $580.00 $1,740.00A-3800Abandon sanitary sewer manholes; complete as specifiedEach 10.00 $750.00 $7,500.00 $830.00 $8,300.00A-3802Abandon 8" sanitary sewer; complete as specifiedLinear Feet 251.00 $5.00 $1,255.00 $16.50 $4,141.50A-3804Abandon 10" sanitary sewer; complete as specifiedLinear Feet 1,427.00 $7.00 $9,989.00 $16.50 $23,545.50A-3806Abandon 12" sanitary sewer; complete as specifiedLinear Feet 2,780.00 $9.00 $25,020.00 $16.50 $45,870.00A-3852Remove sanitary sewer manholes; complete as specifiedEach 5.00 $1,000.00 $5,000.00 $870.00 $4,350.00A-3854Remove sanitary sewer; complete as specifiedLinear Feet 531.00 $56.00 $29,736.00 $35.00 $18,585.00A-3860Abandon sanitary sewer pump station; complete as specifiedLump Sum 1.00 $15,000.00 $15,000.00 $14,100.00 $14,100.00A-3890Sanitary sewer utility line opening (ULO); complete as specifiedEach 3.00 $850.00 $2,550.00 $290.00 $870.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 11 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-3892Excavation special (sanitary); complete as specifiedTons 50.00 $25.00 $1,250.00 $115.00 $5,750.00A-4004Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 100.00 $158.00 $15,800.00 $162.00 $16,200.00A-4008Furnish and install 12" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 23.00 $200.00 $4,600.00 $261.00 $6,003.00A-4036Furnish and install 1" water service (relay); complete as specifiedLinear Feet 30.00 $100.00 $3,000.00 $123.00 $3,690.00A-4046Furnish and install 2" water service (new); complete as specifiedLinear Feet 40.00 $110.00 $4,400.00 $142.00 $5,680.00A-4048Furnish and install 1" corporation and stop box; complete as specifiedEach 1.00 $542.00 $542.00 $635.00 $635.00A-4053Furnish and install 2" corporation and stop box; complete as specifiedEach 1.00 $2,360.00 $2,360.00 $2,475.00 $2,475.00A-4055Furnish and install water service clay dams; complete as specifiedEach 1.00 $400.00 $400.00 $230.00 $230.00A-4060Furnish and install connections to existing 8" water main; complete as specifiedEach 1.00 $2,500.00 $2,500.00 $2,645.00 $2,645.00A-4064Furnish and install connections to existing 12" water main; complete as specifiedEach 4.00 $3,500.00 $14,000.00 $2,915.00 $11,660.00A-4128Furnish and install 12" x 6" water main tee; complete as specifiedEach 1.00 $940.00 $940.00 $995.00 $995.00A-4236Furnish and install 6" 45 degree water main bend; complete as specifiedEach 2.00 $310.00 $620.00 $295.00 $590.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 12 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-4237Furnish and install 8" 45 degree water main bend; complete as specifiedEach 2.00 $410.00 $820.00 $378.00 $756.00A-4309Furnish and install 8" water main plug; complete as specifiedEach 1.00 $220.00 $220.00 $185.00 $185.00A-4354Cut and cap existing 8" water main; complete as specifiedEach 1.00 $970.00 $970.00 $1,325.00 $1,325.00A-4358Cut and cap existing 12" water main; complete as specifiedEach 2.00 $1,105.00 $2,210.00 $2,040.00 $4,080.00A-4360Cut and cap existing 16" water main; complete as specifiedEach 2.00 $1,730.00 $3,460.00 $3,050.00 $6,100.00A-4401Furnish and install 6" water main gate valve; complete as specifiedEach 1.00 $1,330.00 $1,330.00 $1,405.00 $1,405.00A-4402Furnish and install 8" water main gate valve; complete as specifiedEach 1.00 $1,820.00 $1,820.00 $1,885.00 $1,885.00A-4447Furnish and install 12" x 8" tapping valve and sleeve; complete as Each 1.00 $4,825.00 $4,825.00 $5,265.00 $5,265.00A-4500Furnish and install hydrant; complete as specifiedEach 1.00 $5,460.00 $5,460.00 $4,645.00 $4,645.00A-4900Abandon water main on Fond du Lac Avenue; complete as specifiedLump Sum 1.00 $750.00 $750.00 $2,825.00 $2,825.00Section 2: Work Unit B$408,029.70$470,058.45B-1200Unclassified excavation; complete as specifiedCubic Yards 25.00 $15.20 $380.00 $56.50 $1,412.50B-2970Furnish and install concrete-tied block for channel lining; complete as specifiedSquare Yards 38.00 $110.00 $4,180.00 $113.00 $4,294.00B-2972Remove old structure; STA 157+44; complete as specifiedLump Sum 1.00 $20,000.00 $20,000.00 $20,150.00 $20,150.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 13 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313B-2974Excavation for structures; culverts; Structure B-70-085; complete as specifiedLump Sum 1.00 $30,000.00 $30,000.00 $43,285.00 $43,285.00B-2976Backfill structure; Type A; complete as specifiedTons 1,000.00 $20.00 $20,000.00 $33.00 $33,000.00B-2978Breaker run; complete as specifiedTons 106.00 $20.00 $2,120.00 $34.00 $3,604.00B-2980Protective surface treatment; complete as specifiedSquare Yards 23.00 $8.00 $184.00 $6.50 $149.50B-2982Adhesive anchors; No. 4 bar; complete as specifiedEach 42.00 $23.45 $984.90 $16.50 $693.00B-2984Concrete masonry culverts; complete as specifiedCubic Yards 277.00 $817.00 $226,309.00 $720.00 $199,440.00B-2986Bar steel reinforcement; HS structures; complete as specifiedPounds 29,950.00 $1.14 $34,143.00 $1.35 $40,432.50B-2988Bar steel reinforcement; HS coated structures; complete as specifiedPounds 4,900.00 $1.20 $5,880.00 $1.45 $7,105.00B-2990Railing steel Type NY4; complete as specifiedLinear Feet 122.00 $324.00 $39,528.00 $431.00 $52,582.00B-2992Rubberized membrane waterproofing; complete as specifiedSquare Yards 24.00 $46.15 $1,107.60 $58.00 $1,392.00B-2994Riprap; heavy; complete as specifiedCubic Yards 25.00 $100.00 $2,500.00 $97.00 $2,425.00B-2996Pipe underdrain wrapped 6"; complete as specifiedLinear Feet 119.00 $40.00 $4,760.00 $5.25 $624.75B-2997Temporary water diversion; complete as specifiedLump Sum 1.00 $15,000.00 $15,000.00 $57,265.00 $57,265.00B-2998Geotextile fabric Type C; complete as specifiedSquare Yards 376.00 $2.20 $827.20 $5.35 $2,011.60B-2999Geotextile fabric Type HR; complete as specifiedSquare Yards 36.00 $3.50 $126.00 $5.35 $192.60Section 3: Alternate 1 (Not Awarded)$1,108,324.00$1,072,193.00A-3046-1Furnish and install 36" sanitary sewer (new); complete as specifiedVertical Feet 1,845.00 $550.00 $1,014,750.00 $565.00 $1,042,425.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 14 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-3104-1Furnish and install standard sanitary sewer manhole (6' diameter); complete as specifiedVertical Feet 122.00 $767.00 $93,574.00 $244.00 $29,768.00Section 4: Alternate 2 (Awarded)$1,271,840.00$1,209,390.00A-3046-2Furnish and install 36" HOBAS sanitary sewer (new); complete as specifiedLinear Feet 1,845.00 $612.00 $1,129,140.00 $627.00 $1,156,815.00A-3113A-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00 $20,000.00 $20,000.00 $7,250.00 $7,250.00A-3113B-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00 $19,600.00 $19,600.00 $7,045.00 $7,045.00A-3113C-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00 $21,600.00 $21,600.00 $8,260.00 $8,260.00A-3113D-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00 $21,600.00 $21,600.00 $8,260.00 $8,260.00A-3113E-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00 $19,600.00 $19,600.00 $7,045.00 $7,045.00A-3113F-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00 $20,000.00 $20,000.00 $7,250.00 $7,250.00A-3113G-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00 $20,300.00 $20,300.00 $7,465.00 $7,465.00Section 5: Allowances$200,000.00$200,000.00A-2525TCE water treatment allowance; complete as specifiedLump Sum 1.00 $125,000.00 $125,000.00 $125,000.00 $125,000.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 15 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionAdvance Construction Inc.PTS Contractors, Inc2141 Woodale AvenueGreen Bay, WI 54313A-2527TSS water treatment allowance; complete as specifiedLump Sum 1.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00Bid Total:$7,646,222.99$7,656,790.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 16 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantitySection 1: Work Unit AA-1012Limbing existing trees; complete as specifiedEach 20.00A-1050Mobilization; complete as specifiedLump Sum 1.00A-1100Removing pavement; complete as specifiedSquare Yards 50.00A-1120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 4,710.00A-1220Excavation special (paving); complete as specifiedTons 475.00A-13087" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedSquare Yards 2,625.00A-13188" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedSquare Yards 266.00A-13198" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedSquare Yards 1,234.00Unit PriceExtension$5,691,345.20$487.00 $9,740.00$450,000.00 $450,000.00$11.00 $550.00$1.00 $4,710.00$5.00 $2,375.00$70.00 $183,750.00$71.00 $18,886.00$74.00 $91,316.00Dorner Inc.I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 17 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-13299" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedSquare Yards 992.00A-13338" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control at STA 155+70 to STA 174+55 on Oregon Street; complete as specifiedLinear Feet 1,728.00A-1334Concrete pavement gaps; complete as specifiedEach 11.00A-13359" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control at STA 20+37 to STA 46+46 on Fond du Lac Road; complete as specifiedLinear Feet 2,860.00A-1336Furnish and install 6" perforated underdrain; complete as specifiedLinear Feet 200.00A-1360Adjust manholes and inlets; complete as specifiedEach 69.00Unit PriceExtensionDorner Inc.$84.00 $83,328.00$206.00 $355,968.00$1,082.00 $11,902.00$121.00 $346,060.00$27.00 $5,400.00$324.00 $22,356.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 18 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-1370ATurf restoration on Fond du Lac Avenue; complete as specifiedSquare Yards 627.30A-1370BTurf restoration on Oregon Street; complete as specifiedSquare Yards 1,609.70A-1370CTurf restoration on East Waukau Avenue; complete as specifiedSquare Yards 474.00A-1380Cold weather covering (concrete pavement) - single visquine; complete as specifiedSquare Yards 500.00A-1382Cold weather covering (concrete pavement) - double visquine; complete as specifiedSquare Yards 300.00A-1384Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as Square Yards 170.00A-1390Up-charge for late season cold weather concrete pavement; complete as specifiedCubic Yards 170.00A-141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 265.00A-144830" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifiedLinear Feet 335.00A-1460Sidewalk curb; complete as specifiedLinear Feet 240.00Unit PriceExtensionDorner Inc.$9.00 $5,645.70$9.00 $14,487.30$9.00 $4,266.00$1.62 $810.00$2.70 $810.00$11.00 $1,870.00$5.41 $919.70$11.00 $2,915.00$56.00 $18,760.00$16.00 $3,840.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 19 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-15004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 6,935.00A-15106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 1,115.00A-15208" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 790.00A-1540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 60.00A-1550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 712.00A-1560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 102.00A-1580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 965.00A-1582Cold weather covering (sidewalk) - double visquine; complete as specifiedSquare Feet 200.00A-1590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 225.00A-1650Locate existing property monuments; complete as specifiedEach 21.00A-1651Replace section corner; complete as specifiedEach 1.00Unit PriceExtensionDorner Inc.$6.00 $41,610.00$6.00 $6,690.00$7.00 $5,530.00$32.00 $1,920.00$1.00 $712.00$5.00 $510.00$0.10 $96.50$0.20 $40.00$5.00 $1,125.00$135.00 $2,835.00$541.00 $541.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 20 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-1652Replace existing property monuments; complete as specifiedEach 8.00A-1700Sawing existing pavement; complete as specifiedLinear Feet 118.00A-1710Sawing concrete pavement full depth; complete as specifiedLinear Feet 120.00A-1900Tack coat; complete as specifiedGallons 10.00A-19114" asphaltic transition LT with 10" CABC and grading; complete as specifiedSquare Yards 20.00A-19164" asphaltic surface LT with 6" CABC and grading; complete as specifiedSquare Yards 104.00A-2002Furnish and install 10" storm sewer; complete as specifiedLinear Feet 40.00A-2003Furnish and install 12" storm sewer; complete as specifiedLinear Feet 205.00A-2006Furnish and install 15" storm sewer; complete as specifiedLinear Feet 345.00A-2009Furnish and install 18" storm sewer; complete as specifiedLinear Feet 240.00A-2015Furnish and install 24" storm sewer; complete as specifiedLinear Feet 75.00A-2016Furnish and install 24" RCP Class III storm sewer; complete as specifiedLinear Feet 30.00A-2021Furnish and install 30" storm sewer; complete as specifiedLinear Feet 860.00Unit PriceExtensionDorner Inc.$54.00 $432.00$3.00 $354.00$5.00 $600.00$12.00 $120.00$100.00 $2,000.00$63.00 $6,552.00$68.00 $2,720.00$60.00 $12,300.00$66.00 $22,770.00$92.00 $22,080.00$96.00 $7,200.00$87.00 $2,610.00$106.00 $91,160.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 21 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-2025Furnish and install 36" RCP Class III storm sewer; complete as specifiedLinear Feet 40.00A-2027Furnish and install 42" storm sewer; complete as specifiedLinear Feet 15.00A-2049Furnish and install 24" x 38" HERCP Class III storm sewer; complete as specifiedLinear Feet 35.00A-2051Furnish and install 29" x 45" HERCP Class III storm sewer; complete as specifiedLinear Feet 355.00A-2157Furnish and install 29" x 45" RCP Class III apron endwall with joint ties; complete as specifiedEach 1.00A-2201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 25.00A-2202Furnish and install standard storm sewer manhole (5' diameter); complete as specifiedVertical Feet 7.50A-2203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 7.00A-2205Furnish and install standard storm sewer manhole (8' diameter); complete as specifiedVertical Feet 12.00A-2213Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specifiedVertical Feet 27.00Unit PriceExtensionDorner Inc.$148.00 $5,920.00$168.00 $2,520.00$159.00 $5,565.00$130.00 $46,150.00$9,709.00 $9,709.00$382.00 $9,550.00$516.00 $3,870.00$652.00 $4,564.00$1,024.00 $12,288.00$424.00 $11,448.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 22 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-2217Furnish and install standard storm sewer inlet manhole (8' diameter); complete as specifiedVertical Feet 6.00A-2237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 5.00A-2402Furnish and install 8" storm sewer lateral; complete as specifiedLinear Feet 52.00A-2404Furnish and install storm sewer marker balls; complete as specifiedEach 8.00A-2406Furnish and install storm sewer clay dams; complete as specifiedEach 4.00A-2408Furnish and install storm sewer lateral inlet; complete as specifiedEach 1.00A-2414Storm lateral inlet adjustments; complete as specifiedEach 1.00A-2508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 65.00A-2510Sediment removal - Type D modified inlet protection; complete as specifiedEach 30.00A-2512Furnish; install; maintain; and remove stone tracking pad; complete as Each 2.00A-2516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 60.00A-2518Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specifiedLinear Feet 60.00Unit PriceExtensionDorner Inc.$1,052.00 $6,312.00$2,087.00 $10,435.00$49.00 $2,548.00$36.00 $288.00$250.00 $1,000.00$935.00 $935.00$175.00 $175.00$76.00 $4,940.00$5.00 $150.00$1,622.00 $3,244.00$11.00 $660.00$11.00 $660.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 23 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-2522Furnish; install; maintain; and remove ditch check; complete as specifiedEach 10.00A-2524Furnish; install; maintain; and remove dewatering tank system; complete as specifiedEach 3.00A-2526Furnish; install; maintain; and remove turbidity barrier; complete as specifiedEach 1.00A-2600Furnish and install topsoil 6" depth; complete as specifiedSquare Yards 85.00A-2620Furnish and install turf grass; complete as specifiedSquare Yards 85.00A-2631Furnish and install Class I; Type B erosion control mat; complete as Square Yards 85.00A-2650Furnish and install heavy rip-rap with filter fabric; complete as specifiedSquare Yards 40.00A-2802Abandon 15" and larger storm sewer; complete as specifiedLinear Feet 40.00A-2804Remove 30" and smaller storm sewer; complete as specifiedLinear Feet 50.00A-2810Abandon storm sewer manholes and inlets; complete as specifiedEach 1.00A-2812Remove storm sewer manholes and inlets; complete as specifiedEach 3.00A-2850Connect to existing storm sewer main; complete as specifiedEach 16.00A-2852Connect to existing storm sewer lateral; complete as specifiedEach 4.00Unit PriceExtensionDorner Inc.$54.00 $540.00$3,785.00 $11,355.00$3,245.00 $3,245.00$11.00 $935.00$1.00 $85.00$2.00 $170.00$70.00 $2,800.00$17.00 $680.00$30.00 $1,500.00$437.00 $437.00$479.00 $1,437.00$609.00 $9,744.00$264.00 $1,056.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 24 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-2856Connect to existing storm sewer manhole; complete as specifiedEach 2.00A-2950Excavation special (storm); complete as specifiedTons 50.00A-3000Furnish and install 8" sanitary sewer (relay); complete as specifiedLinear Feet 515.00A-3002Furnish and install 10" sanitary sewer (relay); complete as specifiedLinear Feet 220.00A-3004Furnish and install 12" sanitary sewer (relay); complete as specifiedLinear Feet 32.00A-3010Furnish and install 21" sanitary sewer (relay); complete as specifiedLinear Feet 3,230.00A-3060Furnish and install 8" sanitary sewer drop; complete as specifiedVertical Feet 67.00A-3062Furnish and install 10" sanitary sewer drop; complete as specifiedVertical Feet 17.00A-3064Furnish and install 12" sanitary sewer drop; complete as specifiedVertical Feet 3.00A-3100Furnish and install standard sanitary sewer manhole (4' diameter); complete as specifiedVertical Feet 324.00A-3114Furnish and install external sanitary sewer manhole chimney seal; complete as specifiedEach 28.00A-3116Furnish and install external sanitary sewer manhole chimney seal extension; complete as specifiedEach 3.00Unit PriceExtensionDorner Inc.$750.00 $1,500.00$24.00 $1,200.00$146.00 $75,190.00$115.00 $25,300.00$152.00 $4,864.00$681.00 $2,199,630.00$336.00 $22,512.00$613.00 $10,421.00$909.00 $2,727.00$300.00 $97,200.00$487.00 $13,636.00$433.00 $1,299.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 25 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-3210Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specifiedEach 4.00A-3222Furnish and install 6" sanitary sewer "Insert-A-Tee" or "Kor-N-Tee"; complete as specifiedEach 40.00A-3234Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specifiedLinear Feet 986.00A-3235Furnish and install 4"/6" sanitary sewer riser (relay); complete as specifiedLinear Feet 450.00A-3236Furnish and install sanitary sewer lateral marker balls; complete as specifiedEach 80.00A-3238Furnish and install clay dams; complete as specifiedEach 35.00A-3300Furnish and install connection to existing 8" sanitary sewer mains; complete as specifiedEach 9.00A-3302Furnish and install connection to existing 10" sanitary sewer mains; complete as specifiedEach 5.00A-3304Furnish and install connection to existing 12" sanitary sewer mains; complete as specifiedEach 1.00A-3310Furnish and install connection to existing 21" sanitary sewer mains; complete as specifiedEach 1.00Unit PriceExtensionDorner Inc.$134.00 $536.00$362.00 $14,480.00$87.00 $85,782.00$168.00 $75,600.00$41.00 $3,280.00$293.00 $10,255.00$1,505.00 $13,545.00$1,818.00 $9,090.00$2,179.00 $2,179.00$5,634.00 $5,634.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 26 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-3330Furnish and install sanitary sewer concrete collars; complete as specifiedEach 2.00A-3332Core into existing manhole; complete as specifiedEach 1.00A-3424Furnish and install 60" sanitary sewer open cut casing pipes; complete as specifiedLinear Feet 100.00A-3601Rock excavation; complete as specifiedLinear Feet 4,381.00A-3700Closed circuit televising; complete as specifiedLinear Feet 5,842.00A-3710Closed circuit televising - using push camera; complete as specifiedEach 3.00A-3800Abandon sanitary sewer manholes; complete as specifiedEach 10.00A-3802Abandon 8" sanitary sewer; complete as specifiedLinear Feet 251.00A-3804Abandon 10" sanitary sewer; complete as specifiedLinear Feet 1,427.00A-3806Abandon 12" sanitary sewer; complete as specifiedLinear Feet 2,780.00A-3852Remove sanitary sewer manholes; complete as specifiedEach 5.00A-3854Remove sanitary sewer; complete as specifiedLinear Feet 531.00A-3860Abandon sanitary sewer pump station; complete as specifiedLump Sum 1.00A-3890Sanitary sewer utility line opening (ULO); complete as specifiedEach 3.00Unit PriceExtensionDorner Inc.$581.00 $1,162.00$732.00 $732.00$418.00 $41,800.00$175.00 $766,675.00$1.00 $5,842.00$243.00 $729.00$543.00 $5,430.00$8.00 $2,008.00$10.00 $14,270.00$12.00 $33,360.00$939.00 $4,695.00$34.00 $18,054.00$6,468.00 $6,468.00$878.00 $2,634.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 27 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-3892Excavation special (sanitary); complete as specifiedTons 50.00A-4004Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 100.00A-4008Furnish and install 12" ductile iron water main (relay) with polywrap; complete as specifiedLinear Feet 23.00A-4036Furnish and install 1" water service (relay); complete as specifiedLinear Feet 30.00A-4046Furnish and install 2" water service (new); complete as specifiedLinear Feet 40.00A-4048Furnish and install 1" corporation and stop box; complete as specifiedEach 1.00A-4053Furnish and install 2" corporation and stop box; complete as specifiedEach 1.00A-4055Furnish and install water service clay dams; complete as specifiedEach 1.00A-4060Furnish and install connections to existing 8" water main; complete as specifiedEach 1.00A-4064Furnish and install connections to existing 12" water main; complete as specifiedEach 4.00A-4128Furnish and install 12" x 6" water main tee; complete as specifiedEach 1.00A-4236Furnish and install 6" 45 degree water main bend; complete as specifiedEach 2.00Unit PriceExtensionDorner Inc.$24.00 $1,200.00$109.00 $10,900.00$227.00 $5,221.00$77.00 $2,310.00$87.00 $3,480.00$512.00 $512.00$2,452.00 $2,452.00$250.00 $250.00$1,605.00 $1,605.00$2,175.00 $8,700.00$1,047.00 $1,047.00$341.00 $682.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 28 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-4237Furnish and install 8" 45 degree water main bend; complete as specifiedEach 2.00A-4309Furnish and install 8" water main plug; complete as specifiedEach 1.00A-4354Cut and cap existing 8" water main; complete as specifiedEach 1.00A-4358Cut and cap existing 12" water main; complete as specifiedEach 2.00A-4360Cut and cap existing 16" water main; complete as specifiedEach 2.00A-4401Furnish and install 6" water main gate valve; complete as specifiedEach 1.00A-4402Furnish and install 8" water main gate valve; complete as specifiedEach 1.00A-4447Furnish and install 12" x 8" tapping valve and sleeve; complete as Each 1.00A-4500Furnish and install hydrant; complete as specifiedEach 1.00A-4900Abandon water main on Fond du Lac Avenue; complete as specifiedLump Sum 1.00Section 2: Work Unit BB-1200Unclassified excavation; complete as specifiedCubic Yards 25.00B-2970Furnish and install concrete-tied block for channel lining; complete as specifiedSquare Yards 38.00B-2972Remove old structure; STA 157+44; complete as specifiedLump Sum 1.00Unit PriceExtensionDorner Inc.$435.00 $870.00$194.00 $194.00$438.00 $438.00$842.00 $1,684.00$1,452.00 $2,904.00$1,460.00 $1,460.00$2,022.00 $2,022.00$4,921.00 $4,921.00$4,688.00 $4,688.00$3,999.00 $3,999.00$480,332.00$32.00 $800.00$124.00 $4,712.00$19,467.00 $19,467.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 29 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityB-2974Excavation for structures; culverts; Structure B-70-085; complete as specifiedLump Sum 1.00B-2976Backfill structure; Type A; complete as specifiedTons 1,000.00B-2978Breaker run; complete as specifiedTons 106.00B-2980Protective surface treatment; complete as specifiedSquare Yards 23.00B-2982Adhesive anchors; No. 4 bar; complete as specifiedEach 42.00B-2984Concrete masonry culverts; complete as specifiedCubic Yards 277.00B-2986Bar steel reinforcement; HS structures; complete as specifiedPounds 29,950.00B-2988Bar steel reinforcement; HS coated structures; complete as specifiedPounds 4,900.00B-2990Railing steel Type NY4; complete as specifiedLinear Feet 122.00B-2992Rubberized membrane waterproofing; complete as specifiedSquare Yards 24.00B-2994Riprap; heavy; complete as specifiedCubic Yards 25.00B-2996Pipe underdrain wrapped 6"; complete as specifiedLinear Feet 119.00B-2997Temporary water diversion; complete as specifiedLump Sum 1.00B-2998Geotextile fabric Type C; complete as specifiedSquare Yards 376.00B-2999Geotextile fabric Type HR; complete as specifiedSquare Yards 36.00Section 3: Alternate 1 (Not Awarded)A-3046-1Furnish and install 36" sanitary sewer (new); complete as specifiedVertical Feet 1,845.00Unit PriceExtensionDorner Inc.$32,445.00 $32,445.00$22.00 $22,000.00$24.00 $2,544.00$9.00 $207.00$25.00 $1,050.00$884.00 $244,868.00$1.20 $35,940.00$1.30 $6,370.00$350.00 $42,700.00$50.00 $1,200.00$81.00 $2,025.00$27.00 $3,213.00$59,483.00 $59,483.00$3.00 $1,128.00$5.00 $180.00$1,258,711.00$645.00 $1,190,025.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 30 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-3104-1Furnish and install standard sanitary sewer manhole (6' diameter); complete as specifiedVertical Feet 122.00Section 4: Alternate 2 (Awarded)A-3046-2Furnish and install 36" HOBAS sanitary sewer (new); complete as specifiedLinear Feet 1,845.00A-3113A-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00A-3113B-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00A-3113C-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00A-3113D-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00A-3113E-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00A-3113F-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00A-3113G-2Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specifiedEach 1.00Section 5: AllowancesA-2525TCE water treatment allowance; complete as specifiedLump Sum 1.00Unit PriceExtensionDorner Inc.$563.00 $68,686.00$1,419,015.00$713.00 $1,315,485.00$14,790.00 $14,790.00$14,790.00 $14,790.00$14,790.00 $14,790.00$14,790.00 $14,790.00$14,790.00 $14,790.00$14,790.00 $14,790.00$14,790.00 $14,790.00$200,000.00$125,000.00 $125,000.00I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 31 of 322/15/2021
Contract 21-03 Oregon Street and Fond du Lac Road Sanitary Sewer Interceptor Construction (#7517653)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 02/15/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityA-2527TSS water treatment allowance; complete as specifiedLump Sum 1.00Bid Total:Unit PriceExtensionDorner Inc.$75,000.00 $75,000.00$7,790,692.20I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Contract Info\21-03 Bid Tab_2-15-21Page 32 of 322/15/2021