Loading...
HomeMy WebLinkAbout13. 21-65FEBRUARY 9, 2021 21-65 RESOLUTION (CARRIED_______ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 21-02 TO VIKING INDUSTRIAL PAINTING FOR WASHBURN WATER TOWER PAINTING AND MIXING / ($993,500.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for the repainting of the Washburn Water Tower; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: VIKING INDUSTRIAL PAINTING PO Box 24162 Omaha, NE 68124 Total Bid: $993,500.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. Nos. 03221810-7214-64003 Water Capital Fund-Buildings-Water Tower Improvements TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works / Utilities General Manager DATE: February 4, 2021 RE: Award Bid for Public Works Contract No. 21-02 Washburn Water Tower Painting and Mixing Viking Industrial Painting / ($993,500) BACKGROUND The Washburn Water Tower was installed in 1976 and was last painted in 2004. Regular maintenance and inspections are performed on the City’s water towers to evaluate the overall condition of the towers. This includes the paint that protects the metal in the water tower structures. Inspections have indicated the interior and exterior paint on the Washburn Water Tower has started to show signs of failure and it needs to be repainted. Typical water tower painting cycles are ten (10) to fifteen (15) years. The Project also includes the installation of a mixing system to improve water quality in the system. Additionally, repairs and improvements to several components of the tower are included. Some of the included items are the installation of a Cathodic Protection System and replacement of a fall-prevention device. ANALYSIS Engineering staff reviewed three (3) bids. The low bid was received from Viking Industrial Painting of Omaha, Nebraska. The total bid is $993,500. FISCAL IMPACT Funding for the Washburn Water Tower Painting and Mixing project is in the 2020 and 2021 Capital Improvement Program (CIP) (Account #03221810-7214-64003/Water Capital Fund- Buildings-Water Tower Improvements). There is $1,175,000 budgeted for Water Tower Improvements in the 2020 and 2021 CIP in the Property Improvements – Water Utility section. RECOMMENDATIONS I recommend award to the low bidder, Viking Industrial Painting, in the amount of $993,500. Approved: Mark A. Rohloff City Manager SMG/tlt Contract 21-02 - Washburn Water Tower Painting and Mixing (#7441272)Owner: Oshkosh WI, City ofSolicitor: Dixon Engineering, Inc.Bid Opening: 02/01/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionSection 1:Base Bid$993,500.00$1,167,958.0010000Total price for Contract 21-02 Washburn Water Tower Painting and Mixing which is the sum of prices from the Schedule of Values - Section 00 06 00; complete as specifiedLump Sum 1.00 $993,500.00 $993,500.00 $1,167,958.00 $1,167,958.00Base Bid Total:$993,500.00$1,167,958.00Viking Industrial PaintingClassic Protective Coatings Inc.PO Box 24162Omaha, NE 68124I:\Water Filtration\21-02 Washburn Wtr Twr\Project_Information\Contract Info\21-02 Bid Tab_2-1-21Page 1 of 22/1/2021 Contract 21-02 - Washburn Water Tower Painting and Mixing (#7441272)Owner: Oshkosh WI, City ofSolicitor: Dixon Engineering, Inc.Bid Opening: 02/01/2021 10:00 AM CSTSection TitleItem CodeItem DescriptionUofMQuantitySection 1:Base Bid10000Total price for Contract 21-02 Washburn Water Tower Painting and Mixing which is the sum of prices from the Schedule of Values - Section 00 06 00; complete as specifiedLump Sum 1.00Base Bid Total:Unit PriceExtension$1,451,500.00$1,451,500.00 $1,451,500.00$1,451,500.00TMI Coatings, Inc.I:\Water Filtration\21-02 Washburn Wtr Twr\Project_Information\Contract Info\21-02 Bid Tab_2-1-21Page 2 of 22/1/2021