HomeMy WebLinkAbout0108392-Building (driveway)OSHKOSH
ON THE WATER
.lob Address 1024 ARTHUR AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TYLER AANDERSON
Contractor OWNER
Category 256 - Parking Lots, Driveways
No 108392
Create Date 05/28/2004
Plan
Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature SFR/Pave existing gravel drive - provide 6 inch side yard set back for drive, match to existing sidewalk o.k. as per plan approved by Matt Tucker
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$2,500.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$32.00 Park Dedication $0.00
Date 05/28/2004 Final/O.P. 00/00/0000
Parcel Id # 1607790000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 1024 ARTHUR AVE
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: /0ZV
PROPERTY OWNER/CONTRACTOR:
CONSTRUCTION DATA: [] New Construction
[] Addition
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
ZONING:
[] Alteration
/
COMPLIANCE CHECKLIST
DEFICIENT
DEFICIENT
DEFICIENT
[-I Use
[] Lot Width
[] Lot Area
[~ Lot Area Per Family
[--I Flood Plain
[] Front Yard
~-] Front Yard Side Street
COMMENTS:
[] Rear Yard
I~ Side Yards
I~ Building Area
J~ Parking Standards
[] Off-Street Loading Standards
[] Vision Clearance
[] Transitional Yard Standards
[] Landscape Standards
[] Height
[] Conditions of Approval
[] Compliance with P.C. or
BZA Conditions of Approval
[] Signage Standards
[] Mechanical Equip. Screening
[] Parking Lot Lighting
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve ait plans, except the fo/lowing: (1) Aiterations or interior work when the use is conforming and when no change in
use ie proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
PROVED
Plan Commission Action Required
DENIED
Variance(s) Required
DATE:
2003