Loading...
HomeMy WebLinkAbout0108380-PlumbingOSHKOSH ON THE WATER .lob Address 2840 BRADLEY ST Contractor AG MECHANICAL Bathtub 0 Shower 0 Whirlpool 0 Floor Drain 3 Lavatory 4 Lndry Tray 0 Toilet 4 Lndry Stndp 0 Res. Sink 0 Disposal 0 Bar Sink 0 Dishwasher 0 Water Heater 1 Sump Pump 0 Site Drain 0 Classrm Sink 0 Roof Drain 0 Breakrm Sink 1 CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner 2840 BRADLEY LLP Category 440- Industrial-Interior Ejector/Grind 0 DipWell 0 F Prep Sink Water Softner 0 Drink Ftn 0 Serv Sink LocaIWaste 0 Wait. St. 0 Shamp Sink CIothesWshr 0 Ice Chest 0 FIr/Wst Sink Bidet 0 Exam Sink 0 Catch Basin Beer Tap 0 Sculry Sink 0 Wash Ftn Dent. Oper. 0 Hand Sink 1 Urinal Lab Sink 0 Plaster Sink 0 Standp Rec Sterilizer 0 Surgeons Sink 0 Ice Maker No 108380 Create Date 05/28/2004 Plan 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 2 EyeWash Statn 0 0 Use/Nature Interior plumbing for expansion and remodel. of Work Sanitary Sewer Storm Sewer Water Service Size Material Type # 0 0 0 0 0 0 0 Conn. Type Valuation $14,900.00 Plan Approval $0.00 Permit Fees $119.00 ~ Permit Voided Issued By Parcel Id # 1413240200 Date 05/28/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1939 CTY RD GG NEENAH WI 54956 - 0000 Telephone Number 920-751-0884 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ir 1111 .4. i r N 4 ,r, A r. 4 4.— A .044 4 1 t l' 7,. k 1 ir .'17 3i i 4 1 •411.1,"k4;:f.* 1 10104 46 91 t pi 't■A.i it f ...o .3 4... t -1,.. iii •P ..s... Ai .4 ■111 4:: f f it sr *4 ....4.11. ft* .1 ai. ,44.4. vs wr s gt y 4 .01 4 A Nit 1 1 1 .41 II 4 or .1 f?',. 4 .4 Vt. t. A 4 z 1 '.3... 1 Ok 4 4 a. IC i