Loading...
HomeMy WebLinkAbout0108421-Building (mechanical room floor) No108421 CITY OF OSHKOSH OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER FOX VALLEY TECH & ADULT Job Address150 N CAMPBELL RDOwnerCreate Date05/24/2004 DesignerContractorMIRON CONSTRUCTION CO INC Category229 - Alteration Schools & other EducationalPlan TypeBuildingSignCanopyFenceRaze ZoningClass of Const:Size Sq. Ft.Projection Unfinished/Basement0Rooms0Height0Ft. Finished/Living 0Sq. Ft.Bedrooms0StoriesCanopies0 Garage0Sq. Ft.Baths0Signs0 Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitNot RequiredFlood PlainHeight Permit Park Dedication# Dwelling Units0# Structures0 Tech College/ Raise floor of Mechanical Pit to same elevation as remainder of room, remodel classrooms 203, 211, 225 and 231. Reinstall the Use/Nature folding partition between rooms 225 and 231. of Work HVAC ContractorPlumbing Contractor Electric Contractor Fees: Valuation$50,000.00Plan Approval$0.00Permit Fee Paid$214.00Park Dedication$0.00 06/02/200400/00/0000 Issued By:DateFinal/O.P. Permit Voided Parcel Id #0608020000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner PO BOX 509NEENAHWI549570509920-969-7053 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.