Loading...
HomeMy WebLinkAbout0108405-Building (shed)ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: O/Oc~ C~_o,~_ PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: [] New Construction [] Addition TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc,) ZONING: [] Alteration COMPLIANCE CHECKLIST DEFICIENT Use [] Lot Width Lot Area [] Lot Area Per Family [] Flood Plain [] Front Yard [] Front Yard Side Street COMMENTS: DEFICIENT J~ Rear Yard [] Side Yards [] Building Area J~ Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards DEFICIENT [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. PP.OVE9 9E. E Plan Commission Action Required Variance(s) Required REVIEWED BY: -~- DATE: 2003 831 9O9 9 OW 60.0, DISCLAIMER This map is neither a legally recorded map nor a survey and it is not intended to be used as one. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not re- sponsible for any inaccuracies herein contained. If discrepencies are found, please contact the City of Oshkosh. 909 Ceape Ave City of Oshkosh Wisconsin Community Development N Created by- dpb 6/1/04 0 20 Feet