HomeMy WebLinkAbout0108405-Building (shed)ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: O/Oc~ C~_o,~_
PROPERTY OWNER/CONTRACTOR:
CONSTRUCTION DATA: [] New Construction [] Addition
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc,)
ZONING:
[] Alteration
COMPLIANCE CHECKLIST
DEFICIENT
Use
[] Lot Width
Lot Area
[] Lot Area Per Family
[] Flood Plain
[] Front Yard
[] Front Yard Side Street
COMMENTS:
DEFICIENT
J~ Rear Yard
[] Side Yards
[] Building Area
J~ Parking Standards
[] Off-Street Loading Standards
[] Vision Clearance
[] Transitional Yard Standards
DEFICIENT
[] Landscape Standards
[] Height
[] Conditions of Approval
[] Compliance with P.C. or
BZA Conditions of Approval
[] Signage Standards
[] Mechanical Equip. Screening
[] Parking Lot Lighting
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
PP.OVE9 9E. E
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: -~-
DATE:
2003
831
9O9
9
OW
60.0,
DISCLAIMER
This map is neither a legally recorded map nor
a survey and it is not intended to be used as one.
This drawing is a compilation of records, data
and information located in various city, county
and state offices and other sources affecting
the area shown and it is to be used for reference
purposes only. The City of Oshkosh is not re-
sponsible for any inaccuracies herein contained.
If discrepencies are found, please contact the
City of Oshkosh.
909 Ceape Ave
City of Oshkosh Wisconsin
Community Development
N
Created by- dpb 6/1/04
0 20 Feet