Loading...
HomeMy WebLinkAbout0108387-Building (sunroom)OSHKOSH ON THE WATER .lob Address 3980 SHARRATT DR Designer Category 111 - Single Family Addition CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 108387 Owner ANDREW C/PAULA HEUN Create Date 05/28/2004 Contractor REMODELING AND DESIGN GROUP INC Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Constructing a 7' x 15' sunroom off the rear of the house. The room will be seperated from the main building by exterior patio doors. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $17,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $109.00 Park Dedication $0.00 Date 05/28/2004 Final/O.P. 00/00/0000 Parcel Id # 1528560000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 622AIRPORT RD MENASHA WI 54952 - 0000 Telephone Number 920-730-4141 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. 90.0' 30.02' 17.53, 3980 SH/ I 4OO 30.0' 160.0' 80.0'