Loading...
HomeMy WebLinkAbout0108341-Building (kitchen remodel)OSHKOSH ON THE WATER .lob .Address 124 W NEVADA AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner ARMAND D/MARION BECK Contractor PACKER VALLEY BUILDERS, INC Category 140 - Interior Remodeling No 108341 Create Date 05/26/2004 Plan Type ]~) Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Removing and replacing cabinets, adding to the exisitng soffit, patching plaster and window and door trim. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $18,700.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $119.00 Park Dedication $0.00 Date 05/26/2004 Final/O.P. 00/00/0000 Parcel Id # 1501540000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2277 CLAIRVILLE ROAD OSHKOSH WI 54904 - 0000 Telephone Number 920-232-7620 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.