Loading...
HomeMy WebLinkAbout0108519-Building (storage room alterations)OSHKOSH ON THE WATER ,Job Address 500 S OAKWOOD RD Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MERCY MEDICAL CENTER OSH INC Contractor CR MEYER Category 211 - Alteration Industrial No 108519 Create Date 06/07/2004 Plan M1-45-0604 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Hospital/Aterations to divide Cath Storage Room into two rooms, convert North 1/2 into a Soiled Utility Room. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $15,065.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $104.00 Park Dedication $0.00 Date 06/07/2004 Final/O.P. 00/00/0000 Parcel Id # 0613660000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 895W 20TH AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 920-235-3350 x219 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.