Loading...
HomeMy WebLinkAbout0108505-Building CITY OF OSHKOSH ' 108505 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD �rE ON THE WATER Job Address 3465 MOSER ST Owner STRATAGRAPH LLC Create Date 05/27/2004 Designer Contractor BOLDT OSCAR CONSTRUCTION Category 211 - Alteration Industrial Plan L9-44 -0604 Type • Building O Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size No change Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished /Living 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature FACTORY/ Alterations for new occupant - Printing Firm. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuati $280,000.00 Plan Approval $0.00 Permit Fee Paid $904.00 Park Dedication $0.00 Issued By: Date 06/04/2004 Final /O.P. 00 /00 /0000 ❑ Permit Voided I Parcel Id # 1519606300 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 419 APPLETON WI 54912 - 0000 Telephone Number 739 -6321 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.