HomeMy WebLinkAbout0108620-BuildingOSHKOSH
ON THE WATER
.lob Address 140 BROCKWAY AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JEFFREY D/BREND FRANK
Contractor OWNER
Category 140 - Interior Remodeling
No 108620
Create Date 06/10/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature DUPLEX/Gutting the bathroom, dining room, and bedroom for the 1st floor unit. New insulation and drywall will be installed. This permit also
of Work includes re-roofing the detached garage.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
SECKAR ELECTRIC
Plumbing Contractor UNKNOWN
$6,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$50.00 Park Dedication $0.00
Date 06/10/2004 Final/O.P. 00/00/0000
Parcel Id # 1401540000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address W3819 PIPELINE LN
Agent/Owner
EDEN
WI 53019 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.