HomeMy WebLinkAbout0108408-BuildingOSHKOSH
ON THE WATER
.lob .Address 2840 BRADLEY ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner 2840 BRADLEY LLP
Contractor R J ALBRIGHT INC.
Category 210 - Addition Industrial
No 108408
Create Date 06/01/2004
Plan L9-42-0604
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: 2Bibc Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 4000 Sq. Ft. Bedrooms 0 Stories 1 Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation ~ Poured Concrete ~ Floating Slab ~ Pier O Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 1
Use/Nature Manufacturing/4000 sf office addition, interior alterations to existing building. * No work to commence above the foundation walls until complete
of Work planning approval and documentation of DNR Chapter 30 permit approval has been obtained.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$250,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$839.00 Park Dedication $0.00
Date 08/01/2004 Final/O.P. 00/00/0000
Parcel Id # 1413240200
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 5711 GREEN VALLEY RD OSHKOSH WI 54904 - 0000 Telephone Number 231-8635
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: 2840 BRADLEY STREET ZONING: M-2
PROPERTY OWNER/CONTRACTOR: MEDALIST LASERFAB/ALBRIGHT
CONSTRUCTION DATA: I--I New Construction ~ Addition [] Alteration
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) 4000 SF BUILDING
ADDITION AND A 51 SPACE PARKING LOT,
COMPLIANCE CHECKLIST
DEFICIENT
DEFICIENT
DEFICIENT
I'-] Use
[-[ Lot Width
I~ Lot Area
[--~ Lot Area Per Family
I~ Floodplain
I~ Front Yard
I~ Front Yard Side Street
r-i Rear Yard
[~ Side Yards
['-] Building Area
~1 Parking Standards
[~ Off-Street Loading Standards
[~ Vision Clearance
[--I Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Mechanical Equip. Screening
Parking Lot Lighting
COMMENTS:
· A DNR approved floodplain study for the property is not required (see attached letter). Since it appears that
the parking lot may encroach into the floodplain of Gallup Creek, this parking lot must be constructed at a
grade ~at or below the pre-construction grade of the site. This is necessary to guarantee that no fill is placed
within the floodway portion of the floodplain. A post-construction elevation survey will be required to verify
the final building, parking lot, and grading is installed according to the approved grading/drainage plan
· Per the attached letter from Attorney Michael Schoendorf, the property to the south (northwest of Gallup
Creek) will be combined with 2840 Bradley Street.
· Landscaping is not required for this property, however, per section 30-350)(1) a mix of trees and shrubs must
be planted between the new parking lot and the street.
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve all plans, except the following: ('1) Alterations or interior work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
[] APPROVED
[] DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: Matt Tucker
DATE: 6/'1/2004~
2003
Page 1 of 1
Tucker, Matt W
From: Michael T. Schoendorf [MTS@tsglaw.com]
Sent: Monday, April 05, 2004 1:50 PM
To: mtucker@ci.oshkosh.wi.us
Cc: bobjr@rjalbright.com; Jeff Knauf
Subject: 2840 Bradley and 2940 Bradley Street
Hi Matt, Bob Albright requested that I send this email to you clarifying that Gallup Creek LLP(f/k/a 2840 Bradley
LLP) who owns both 2840 Bradley Street and 2940 intends to transfer the northwest corner of 2940 Bradley that
is north and west of Gallup's Creek to the 2840 Bradley parcel. This parcel is really only useful to the 2840
address because of the Creek. This will be completed by June 1, 2004. We are currently getting the parcel
surveyed. As soon as the survey is completed we will forward the paper work to you before recording. Please call
if you have any questions or comments. Michael Schoendorf, Partner Gallup Creek, LLP and Vice President &
Secretary for Medalist Laserfab, Inc. Thanks Matt, Mike
Attorney Michael T. Schoendorf
The Schroeder Group, S.C.,
Attorneys at Law
20800 Swenson Drive, Suite 475
Waukesha, WI 53186
Phone: 262-798-8220
Direct: 262-798-8240
Toll Free: 800-372-3020
Fax: 262-798-8232
Email: _mts@tsglaw.com
Web: Www.tsglaw.com
THE INFORMATION CONTAINED IN THIS ELECTRONIC MESSAGE (E-MAIL)AND ANY
ATTACHMENT(S) TO IT IS/ARE INTENDED FOR THE EXCLUSIVE USE OF THE
INTENDED ADDRESSEE(S) AND MAY CONTAIN INFORMATION THAT IS CONFIDENTIAL
AND/OR PRIVILEGED AND EXEMPT FROM DISCLOSURE UNDER APPLICABLE LAW. IF
YOU ARE NOT THE INTENDED RECIPIENT(S) AND HAVE RECEIVED THIS
COMMUNICATION IN ERROR, PLEASE DO NOT DISTRIBUTE IT. INSTEAD, PLEASE
NOTIFY THE SCHROEDER GROUP, S.C., ATTORNEYS AT LAW AT 1-800-372-3020 OR
BY EMAIL AT GENERAL@TSGLAW. COM, AND DESTROY ALL COPIES OF THIS
MESSAGE AND ANY ATTACHMENTS. THANK YOU.
4/6/04
City of Oshkosh - Department of Community Development
215 Church Avenue Oshkosh, WI 54901 (920) 236-5055
MEMORANDUM
O/HKO/H
(920) 236-5053 fax
TO:
FROM:
DATE:
RE:
file
Matt Tucker, Associate Planner
June 1,2004
Zoning Review Supplement, Medalist Laserfab addition/parking lot
The purpose of this memo is to outline some of the specific information relative to the
subject site, which abuts Gallup's Creek, a navigable stream in the City of Oshkosh.
The subject property abuts Gallup's Creek, a navigable stream that does not have
studied floodplain features, per the March 17, 2003 FEMA maps. Per advisement from
Dick Koch, DNR staff person assigned to manage floodplain related developments in
the Northeast region, development abutting a navigable stream must be studied to
show the impact of the floodplain on the existing and proposed improvements. These
studies may be certified by the DNR for compliance with NR116, Wisconsin's
Floodplain Management Program.
A study was prepared by Craig Hardy, Hardy GeoTech, which was reviewed by Dean
Stitgen, DNR staff assigned to review/approval of floodplain studies. During a
telephone conversation on May 28th 2004, Mr. Stitgen indicated this floodplain analysis
noted that the undersized culverts exist at Bradley Street, upstream to the subject site,
restrict the flow of floodwaters, which will force ponding upstream until the floodwaters
height exceeds the road height. Floodwaters will then cross the road, enter ditching in
front of and on either side of the proposed development, to direct floodwaters back to
the stream bank of the creek. Mr. Stitgen's written comments are attached to this
memo, dated 5/20/2004.
During conversations with Mr. Stitgen in late may, it was determined that the DNR and
NRl16 apply only to areas mapped with floodplain on the regulatory map, not streams
without mapping, and since the area is not mapped, NR116 requirements do not apply
(this is also addressed in the attachment from Mr. Stitgen). Mr. Stitgen further indicated
that a backwater analysis (from downstream to upstream) will not show the area for the
proposed addition to be inundated by the flood waters.
The attached grading and drainage plan dated 5/27/04, submitted by John Davel of
Davel Engineering, depicts the 100 year flood elevation as BELOW the existing floor
elevation of the building and BELOW the proposed floor elevation of the addition. Per a
telephone conversation on 6/1/2004, Mr. Davel explained that the regional flood
elevations were taken off of Mr. Hardy's above-mentioned flood study. The plan also
shows that the owner will be gradi~§'the~site to catch water that may sheet-drain across
Badger Avenue, to channel the floodwaters back to the creek bed.
In reviewing the attached grading and drainage plan from Davel Engineering, dated
5/27/04, considering the proposed ditching on the grading & drainage plan, the
developer appears to have reasonably protected the building and proposed addition
from the potential of flooding during the 100 year flood event.
Throughout the zoning review process, Mr. Robert Albright Jr. was advised that it is in
his client's best interest to raise the elevation of the floor of the building to further
protect the building from the potential of flooding, however, the City will not make this a
requirement.
Er~c.
4%
R~
Z
Z
(D c ~']
~-~ ~. ~ o o
c- ~ --- (D --- ._~
~-- 0 ~
~~ =
Z
ooaaaaa a a
I
0 '~
--~0
0 <
R/W
Date:
05/27/2004
Filename:
2616d
Author:
WFK
Last Saved by:
ohn
Page
1.1