Loading...
HomeMy WebLinkAbout0108443-BuildingOSHKOSH ON THE WATER .lob Address 120 W 11TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DARYL L LEONARD Contractor OWNER Category 111 - Single Family Addition No 108443 Create Date 06/02/2004 Plan Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Constructing a 8'x14' addition onto the existing house for a laundry/mud room and installing a 6'x6' deck off the rear exit door. All of Work ,;onstruction shall comply with local and state building code requirements. Access and ventilation is required for the addition. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $9,500.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $74.00 Park Dedication $0.00 Date 06/02/2004 Final/O.P. 00/00/0000 Parcel Id # 0302310000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 120 W 11 TH AVE Agent/Owner OSHKOSH WI 54902 - 6012 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. L,..2 q 0 r~