Loading...
HomeMy WebLinkAboutDirector's Memo - Nov City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us TO: Advisory Park Board FROM: Ray Maurer, Parks Director DATE: November 5, 2020 RE: November 9, 2020 Meeting 1. Discuss initial development of Lakeshore Park – 4 seasons building Staff from SmithGroup, the firm hired to assist the city with architectural and engineering design for the initial development of phase 1 at Lakeshore Park, will be in attendance to present some initial information on the project. More specifically, SmithGroup staff will discuss preliminary information on site conditions, conceptual ideas for where the building and parking lot may be located on the site and the preliminary project schedule. Included in your packet are the following: existing site conditions aerial, Master Plan concept plan with specific east side park components, design concept of how the components were envisioned in the Master Plan, a more defined concept design of the components based on existing vegetation and input from neighbors, and conceptually how future phase 1 components are envisioned. We just recently received the report from the soil borings that were completed on the site and are reviewing that information. We are also in the process of conducting a site survey to provide us with topographical and other data. This initial information is needed before site amenity design can begin. If you have questions prior to the meeting, please feel free to contact me. If you will not be able to attend the meeting, please contact Stacy James, Administrative Assistant, at 236-5080. Thank you in advance.