Loading...
HomeMy WebLinkAbout0108184-Building (roof) CITY OF OSHKOSH No 108184 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER 1 Job Address 306 WAUGOO AVE Owner JAMES B BARTELT Cr ate 05/20/2004 U Designer Contractor WERNER HOME IMPROVEMENTS LLC Category 141 - Exterior Remodeling Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature DUPLEX / TEAR OFF & REPLACE ROOFING ON HOUSE, REPLACE WOOD DECKING 7/16 OSB SHEETING, NO STRUCTURAL of Work CHANGES HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,700.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: , -, Z. .., Date 05/20/2004 Final /O.P. 00 /00 /0000 0 Permit Voided I Parcel Id # 0200530000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2147 POINT COMFORT RD OSHKOSH WI 54902 - 7513 Telephone Number 236 -9109 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.