Loading...
HomeMy WebLinkAbout0108164-Building (siding)OSHKOSH ON THE WATER .lob Address 922 VINE AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MR/MRS R DOUGLS HElL Contractor BEULEN & SONS CONSTRUCTION Category 141 - Exterior Remodeling No 108164 Create Date 05/19/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work SFR/ Removing the steel siding to expose the original wood siding, install "Flare" between 1st and 2nd stories. The wood siding shall be brought to a condition free from peeling or chipped paint and in good repair within 1 year of removal of the steel siding. Progress shall be made on this project to insure a timely completion. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $9,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $68.00 Park Dedication $0.00 Date 05/19/2004 Final/O.P. 00/00/0000 Parcel Id # 0506560000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 922 VINE AVE OSHKOSH WI 54901 - 3532 Telephone Number 233-2680 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.