Loading...
HomeMy WebLinkAbout08. 20-417 OCTOBER 13, 2020 20-417 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 20-05 OREGON STREET RECONSTRUCTION, UTILITIES, & PATCHING (WEST 21ST AVENUE TO WEST 28TH AVENUE); WEST 28TH AVENUE UTILITIES & ASPHALT PAVING; CONGRESS AVENUE UTILITIES & PATCHING; & WEST 28TH AVENUE PUMP STATION UPGRADES/PTS CONTRACTORS,INC. (-$283,172.40) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change Order, a copy of which is attached, is hereby approved: PTS CONTRACTORS, INC. 4075 Eaton Road Green Bay, WI 54311 Net Decrease to Contract: (-$283,172.40) PURPOSE: See attached Change Order. Acct. Nos. 03110410-7480 Sidewalk Construction Fund Expenditures 03170410-7480-03304 Special Assessments Fund— Sidewalks 03150410-7480 Street Improvement Fund Expenditures 03170410-7480-03301 Special Assessments Fund— Streets 03170410-7480-03303 Special Assessments Fund—Water 03170410-7480-03302 Special Assessments Fund— Sewer 03170410-7480-03305 Special Assessments Fund— Storm Water 03210410-6801-04005 Contract Control—Paving 03210410-6804-04005 Contract Control—Storm Sewer 03210410-6802-04005 Contract Control—Sanitary Sewer 03210410-6803-04005 Contract Control—Water OCTOBER 13, 2020 20-417 RESOLUTION CONT'D 03210410-6806-04005 Contract Control - Sidewalk 03210410-6809-04005 Contract Control - Traffic 03221910-7206-64004 Property Improvements Cityof Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: James Rabe, Director of Public Works DATE: October 8, 2020 RE: Approve Change Order No. 2 for Public Works Contract No. 20-05 Oregon Street Reconstruction, Utilities, & Patching (West 21st Avenue to West 281h Avenue); West 281h Avenue Utilities & Asphalt Paving; Congress Avenue Utilities & Patching; & West 28th Avenue Pump Station Upgrades PTS Contractors, Inc. (-$283,172.40) Change Order No. 2 for Contract 20-05 is scheduled for consideration by the Common Council at the October 13, 2020 meeting. The Contract was originally awarded to PTS Contractors, Inc. (PTS) in March of 2020. Change Order No. 1 was approved by Council in June of 2020. This current change order is for additional services provided and to address the change in scope of work to install the sanitary sewer at the Oregon Street and West 281h Avenue Canadian National (CN) railroad crossing via open -cut methods. This change in installation method was also discussed as a part of the resolution at the August 25, 2020 meeting in which Common Council approved the agreement with CN for the crossing replacement at Oregon Street and 281h Avenue. ANALYSIS The bid documents for City Contract 20-05 — Oregon Street Reconstruction included the boring and jacking of 240 linear feet of 60" sanitary sewer casing pipe at the Oregon Street and West 2811 Avenue CN railroad crossing. Due to bedrock elevations, the construction of the sanitary sewer via boring and jacking would be difficult and pose significant risk to the Contractor and the CN facilities. After bidding the project, the Engineering Division worked directly with CN and PTS to develop a plan to allow for an open -cut installation. The open -cut method of construction provided less risk to the Contractor and CN's facilities and was an easier method of installation. The cost to install the sanitary sewer as bid was $614,640. PTS provided a price for the open -cut method of $289,572. This would result in a cost reduction for sanitary sewer installation of $325,068. The cost of the CN agreement is anticipated not to exceed $159,363. 1.\Engineering\2020 CONTRACTS\20-052nd Page 1 of 2 Na rtg\ Project_1mmnmtmm\Correspondence\ Memo \20-05 Memo for CO 92_10b-20.doa TO: PTS CONTRACTORS, INC. 4075 EATON ROAD GREEN BAY, WI 54311 CHANGE ORDER #2 DATE: OCTOBER 2, 2020 Your present contract with the City of Oshkosh, Contract No. 20-05, awarded March 24, 2020, is hereby amended and changed as follows: NET DECREASE TO WORK UNIT A: ($614,640.00) NET INCREASE TO ADDITIONAL WORK REQUIRED: $331,467.60 NET DECREASE TO CONTRACT ($283,172.40) TOTALS BID TOTAL $11,561,617.97 $11,561,617.97 CO #1 $294,622.00 $294,622.00 PREVIOUS $11,856,239.97 $11,856,239.97 CO #2 ($283,172.40) ($283,172.40) CONTRACT TOTAL $11,573,067.57 $11,573,067.57 CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 20-05 CHANGE ORDER NO. #2 WORK UNIT A INCREASEIN DECREASEIN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Trenchless 60" sanitary sewer casing pipe; complete Linear A3512A as specified Feet 240.00 0.00 -240.00 $2,561.00 ($614,640.00) WORK UNIT A (BID ITEM A3512A) - SUBTOTAL: NET DECREASE ADDITIONAL WORK REQUIRED CO #2 $0.00 ($614,640.00) ($614,640.00) ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Install monitoring/dewatering wells at pump station; Lump 1-30000 complete as specified Sum 0.00 1.00 1.00 $9,800.00 $9,800.00 36 x 60 SS casing spacer 12- 1-30001 CR; complete as specified Each 0.00 1.00 1.00 $10,716.00 $10,716.00 Furnish and install 240' of 60" sanitary casing pipe; Linear 1-30002 Icomplete as specified Feet 1 0.00 236.00 236.00 $1,227.00 $289,572.00 Pump station 18" N-12 for dewatering; complete as Lump 1-30003 spcified Sum 0.00 1.00 1.00 $1,235.00 $1,235.00 Mobilization of pipe ramming equipment (Minger); complete Lump 1-40000 as specified Sum 1 0.00 1.00 1.00 $1,575.00 $1,575.00 Mobilization of cellular grout and core 4 holes in box to Lump 1-40001 grout; complete as specified Sum 0.00 1.00 1.00 $2,887.50 $2,887.50 Cellular grout (measured as 3 x delivered truck load yardage); complete as Cubic 1-40002 specified Yards 0.00 72.00 72.00 $157.50 $11,340.00 Mobilzation of rock head; Lump 1-40003 complete as specified Sum 0.00 1.00 1.00 $2,500.00 $2,500.00 Bollards installed at the 24th/Hughes/Oregon intersection; complete as Lump 1-50000 specified Sum 0.00 1.00 1.00 $1,842.10 $1,842.10 ADDITIONAL WORK (ITEMS 130000-1-50000) -SUBTOTAL: $331,467.60 $0.00 NET INCREASE: $331,467.60 NET DECREASE TO WORK UNIT A: ($614,640.00) NET INCREASE TO ADDITIONAL WORK: $331,467.60 NET DECREASE TO CONTRACT: ($283,172.40) Page 2 of 2