Loading...
HomeMy WebLinkAbout05. 20-414 OCTOBER 13, 2020 20-414 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID TO INTERSTATE PUMP & TANK FOR UNDERGROUND FUEL TANK REPLACEMENT FOR THE TRANSPORTATION DEPARTMENT ($323,765.51) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for underground fuel tank replacement for the Transportation Department; and WHEREAS,upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: INTERSTATE PUMP &TANK 901 Niagara Street Waukesha, WI 53186 Total Bid: $323,765.51 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bids are hereby accepted and the proper City officials are hereby authorized and directed to enter into appropriate agreements for the purpose of same, all according to plans, specifications, and bids on file. Money for this purpose is hereby appropriated from: Acct. No. 03221728 7204 63015 Fuel Tank Replacement N� m r�. 144. �F Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: October 6, 2020 RE: Award Bid to Interstate Pump & Tank for Underground Fuel Tank Replacement for the Transportation Department ($323,765.51) BACKGROUND The City installed two diesel fuel 12,000-gallon capacity underground storage tanks (UST) at the GO Transit Maintenance Facility in approximately 1980. While these UST's are still in use today for refueling GO transit vehicles, because of their age it is recommended they be removed and replaced. It is anticipated that our insurance deductible will decrease from $250,000 to $10,000 and our insurance premium will go down $3,500 per year by replacing this fuel system. The project scope for this project is to decommission the two USTs and associated fuel system and install one 12,000-gallon capacity tank and a new fuel system. The new tank and fueling system would be installed in compliance with current standards to reduce insurance premiums and deductibles as well to reduce spill risk. This project will also ensure the Transportation Department facilities maintain a state of good repair as required by the Federal Transit Administration. Due to the complexity of this project and the state and federal regulations associated with underground fuel tank removal/installation, the decision was made to engage AECOM to coordinate the engineering services for this project. ANALYSIS Working in conjunction with AECOM and Transportation Department personnel, Purchasing reviewed and prepared bid specifications for the replacement of the underground tank(s). The scope of work for this bid includes the removal of the current fueling system, the installation of a new fuel system that meets all current standards as well as the removal of any impacted soil and the installation of clean backfill. AECOM services include bid specifications, project management and submittal review, field documentation, review of Davis Bacon wage compliance and project documentation. Bids were due September 29, 2020. The bid tab is attached. After reviewing the bids it is the consensus of AECOM and staff that the low bid from Interstate Pump & Tank met the minimum bid specifications. FISCAL IMPACT This project was allocated $200,000 in the 2020 CIP with $160,000 being covered by a federal grant and $40,000 locally. However, as the project evolved and the full complexity of the project scope and regulations became clear, it was deemed necessary that we engage the technical expertise of AECOM to coordinate the engineering services, bid specifications and project management. The fiscal impact of this bid is $323,765.51 that combined with AECOM fees of $52,655, brings the total fiscal impact for this City Hall, 215 Church Avenue P.O. Be. 1130 Oshkosh, WI 54903-1130 http://..ci.oshkosh.wi.us project to $376,420.51. The Transportation Department was able to amend the initial federal grant request to still cover 80% of the project cost. The additional local share of $35,284.10 will be transferred from completed transit projects that were underspent. This award will be charged to AIN#: 0322 1728 7204 63015 (Fuel Tank Replacement). RECOMMENDATION AECOM and City staff recommend the bid for this project be awarded to Interstate Pump & Tank for $323,765.51. If you have any questions about this project please contact Transportation Director Jim Collins. Respectfully Submitted, Approved: Jon G. Urben, General Services Manager Mark A. Rohloff, City Manager BID TAB UNDERGROUND FUEL TANK REPLACEMENT OSHKOSH TRANSPORTATION DEPARTMENT BIDS OPENED SEPTEMBER 29, 2020 VENDOR INFORMATION BID INFORMATION Petro -Chemical Systems Inc. Interstate Pump & Tank 101 Christopher Ct 901 Niagara St Eden WI 53019 Waukesha WI 53186 BID ITEMS Abandonment of Fuel System 1 LS Fuel System Installation 1 LS Impacted Soil Disposal Est 500 Tons Provide Back Fill Est 350 C.Y. TOTAL BID $343,550.00 $323,765.51 ACKNOWLEDGED COMPLIANCE WITH FEDERAL REQUIREMENTS YES YES PREQUAL YES YES BID BOND YES YES