Loading...
HomeMy WebLinkAbout0108151-Building (patio door) � CITY OF OSHKOSH No 108151 � , OSHKOSH BUILDING PERMIT -APPLICATION AND RECO#��E4 ON THE WATER � Job Address 1835 CRANE ST Owner PATRICK KUHL C e Date 05/19/2004 _D+ Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building � Sign � Canopy _� Fence � Raze I Zoning Ciass of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection '; Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete 0 Floating Slab 0 Pier � Other 0 Concrete Block 0 Post � Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature !SFR/Installation of a 6'patio door,two 2x12's will be installed for the header. A light is required to be provided off this exit. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuati $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: �� Date 05/19/2004 Final/O.P. 00/00/0000 � Permit Voided I Parcel Id# 1217300000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure cessary approvals before st in ch activity. Signature Date �� G � ' AgenUOwner � Address 1835 CRANE ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.