HomeMy WebLinkAboutItem V A PLAN COMMISSION STAFF REPORT OCTOBER 6,2020 ITEM V A: GENERAL DEVELOPMENT PLAN AND SPECIFIC IMPLEMENTATION PLAN FOR COMMERCIAL DEVELOPMENT AT 1844 OSHKOSH AVENUE GENERAL INFORMATION Applicant: Vision Architecture LLC: Adam James Property Owner: Prime Space Development Action(s) Requested: The petitioner requests approval of a General Development Plan (GDP) and Specific Implementation Plan (SIP) for a commercial development at 1844 Oshkosh Avenue. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Background Information Property Location and Type: The subject site is a 108,886 square foot (2.49acre) irregular-shaped vacant parcel located on the east side of N. Koeller Street,north of Oshkosh Avenue. The property is zoned Corporate Business Park with a Planned Development Overlay (CBP-PD) and the surrounding area consists predominately of vacant commercial land as well as Lakeshore Park to the north. The 2040 Comprehensive Plan recommends Interstate Commercial land use for the subject property. Subject Site Existing Land Use Zoning Vacant CBP-PD Adjacent Land Use and Zoning -Existing Uses Zoning North Park I ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... South Vacant CBP-PD ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... East Vacant CBP-PD ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... West Commercial/vacant CBP-PD Comprehensive Plan Land Use Recommendation Land Use 2040 Land Use Recommendation Interstate Commercial ANALYSIS Use The proposed development consists of two commercial buildings. The north building is a two- story 21,516 sq. ft. mixed use building containing first floor retail and restaurant spaces and second floor professional office space and also includes a covered patio space to be utilized by Page 1 tenants and guests. The south building will be a 7,896 sq. ft. single story multi-tenant retail building which will also have a drive-thru lane for potential coffee sales or similar tenant. Site Design/Access The proposed development will have two accesses from N. Koeller Street. Department of Public Works staff is recommending a condition that the southern driveway be right-in, right-out access only to alleviate traffic concerns on N. Koeller Street. Staff is also recommending a condition that a cross-access drive aisle be included for access to the vacant property to the east to provide a connection to future development. This has been provided on the site plan and will require a cross-access agreement. — I RATI dfn, { I I�uou�ma cf� rcru I �:j, �wv a MI mz " I V f p SITE PLAN Site Plan Required Provided Parking Spaces Minimum: 98 100 Impervious Surface Maximum: 70% of lot 70% of lot The parking lot provided on the site plan meets the minimum parking requirement of 1 space per 300 square feet of gross floor area for indoor sales, restaurant and office uses. The total impervious surface area for the site is 76,349 sq. ft., which is at the maximum impervious surface ratio for the CBP District. The plan includes a dumpster enclosure on the east side of the parking lot. The proposed dumpster enclosure is constructed of Trex composite fencing. ITEYI VA GDP/SIP-1844 Oshkosh Ave Z Page 2 The dumpster enclosure plan will need to be modified to include materials and colors that are consistent with the principal buildings per CBP accessory structure standards. Building/Parking Setbacks Minimum Provided Front Setback(west) 30 ft. 30.1 ft. Front Setback(north) 30 ft. 11 ft. (bike rack pad) Side Setback(east) 10 ft. 5 ft. (parking lot) Side Setback(south) 10 ft. 22 ft. The proposed buildings meet setback requirements for the CBP District,however the bicycle parking area extends into the front(north) setback and the parking lot and drive-thru lane extend into the side (east) setback area. Staff is supportive of the reduced setbacks for the bicycle parking pad and parking lot/drive-thru areas as site constraints related to the unique lot configuration result in difficulties meeting setbacks and providing required parking. Also, these setback reductions should not cause concerns for the surrounding area as the bicycle parking pad is relatively small in area and the eastern parking/drive-thru area will likely be abutting a similar commercial parking lot with shared access. Storm Water Management/Utilities The applicant has been in discussion with the Department of Public Works regarding storm water management for the area. Public Works has noted that water quality will need to be provided for the site. Finalized storm water management plans will need to be submitted and approved as part of the Site Plan Review processes. Landscaping Points Required Points Provided Building Foundation 177(88.4 side of main (north) entrance,44.2 street side) Point total not provided Building Foundation 148 (74 side of main Point total not provided (south) entrance, 37 street side) 585 (176 tall trees 234 652.9 Paved Area shrubs) (210 tall trees, 242.9 shrubs) Street Frontage 669.6 647(324 medium trees) (330 medium trees) Yards 588 671 Yards devoted to street 294 308 frontage Total 2,145 2,326 ITEYI VA GDP/SIP-1844 Oshkosh Ave 3 Page 3 I d T I LME l6ua,m uL Yiay♦3,w � U F'I Fi 6(w,rcty i m � � M M,i � d � MA v yyw b �I � S , �. laa(aK T'sioN'fi Ali l'mY�iC. I 9 F!.L ✓d71.�dfMy uu I i u L�hNGSC;J RE DLAN sr." I-"�''�'"" Building Foundation The applicant has demonstrated that the landscape plan meets the total point requirement for combined building foundation area for both buildings combined. However,building foundation points must be applied separately for each building. The applicant will need to demonstrate the foundation point requirements are being met separately for both buildings. This can be provided as part of the Site Plan Review process. The landscaping ordinance specifies that 50% of the required points must be located along the main entrance side of the building, or in this case the north facade of the south building and east fagade of the north building. The plan does not meet the main entrance side point requirement for either building as no landscaping is shown along these facades. Staff is supportive of a Base Standard Modification (BSM) to allow the main entrance side point requirement to be applied to the street side facades of each building (south and east facade of south building and west fagade of north building), as the intent of the code is being met with these facades being most visible from the public right-of-way. The applicant will need to demonstrate that this point requirement is being met during the Site Plan Review process. ITEYI VA GDP/SIP-1844 Oshkosh Ave 4 Page 4 Paved Area The paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area is being met. The code further specifies 30% of all points will be devoted to tall trees and 40%will be devoted to shrubs. A tall deciduous/shade tree is required at the ends of all parking rows. These requirements are also being met. Street Frontage Code requires 100 points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. The landscape plan shows medium trees along the frontage which meet the 50%point total requirement. The CBP standards also require 50% of yard landscaping points to be located along street frontages, which is also being met. All landscaping devoted to street frontage points must be located within 10' of the public right-of-way. Yards Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area. The provided yard landscaping points exceeds this requirement and meets the street frontage point requirement as previously noted. Signage Proposed signage for the site includes two 10' tall X 14' wide monument signs along N. Koeller St., where code allows a maximum of one ground sign per street frontage. The proposed sign along the south entrance will have a 5' front yard setback and the sign along the north entrance will have a 10.7' setback where a 30' setback is required. The applicant is requesting BSMs for both the number of ground signs and the setback reduction. Staff is supportive of the BSM to allow a second ground sign as the frontage wraps around and functions as though as has two frontages. Staff is also supportive of a BSM to allow reduced setbacks as the proposed sign locations are consistent with reduced setbacks of neighboring monument signs within the Corporate Business Park District to the east. Also, as proposed the parking and building areas will be built out to the setbacks leaving no space for ground signage meeting the front setback requirement. The maximum height for the monument signs is 10' per CBP signage standards. I r f J� IJJJJyJ'I�JJJIJ�'';'"WI ITEYI VA GDP/SIP-1844 Oshkosh Ave 5 Page 5 Wall signage is shown on the building elevations for both buildings. Wall signage will be limited to 1 sq. ft. per linear foot of building frontage with a maximum of 15% of the wall area per building facade. This can be addressed under a separate building permit. Site Lighting A photometric plan has been provided by the applicant. The provided plan appears to meet the maximum 0.5 foot candle lighting level allowed at the property lines, with the exception of 0.6 fc lighting level along the east property line. Staff is supportive of a BSM to allow the slightly increased lighting level in this location as this area is an adjoining a commercial lot with shared access. The plan does not show lighting levels at the west property line. A revised lighting plan will need to be provided during the site plan review process to verify that it does not exceed 0.5 fc at the public right-of-way. The minimum lighting level of 0.4 foot candle is being met for the parking area. Building Facades Building Materials The Corporate Business Park standards require buildings to be clad on all sides with at least 75% Class I materials. Also, window and door area shall comprise of at least 40% of the ground floor level of the street facing facade. The specific elevations breakdown is as follows: North Building Required Class I Provided Class I North 75% 92.7% South 75% 78.8% East 75% 85.5% West 75% 100% Street facing ground floor (north 40% door/window 92 7% area facade) Street facing 40% door/window ground floor (west 40.4% area facade) South Building Required Class I Provided Class I North 75% 92% South 75% 88.3% East 75% 79.7% West 75% 82.8% Street facing 40% door/window ground floor (west 44.3% area facade) ITEYI VA GDP/SIP-1844 Oshkosh Ave 6 Page 6 Both buildings meet design standards requirements for building materials on all facades. The applicant is proposing to exceed the minimum of 75% Class I on all facades of both buildings. The minimum door/window area of 40%for street facing ground floor elevations is also being met. ALTERNATE DESIGN �,r ,„ , ,,--Y, r ...... ,""""'ll ........ EAST ELEVATION �I r, I 5C}1JTHI ELE4'ATI4fW Nf}R7HI E.LEVA.kIC3fM J _.... :N ..?. �� , r, f ........ d 3 �MEST ELEVATION North Building. nyrrrrrrn rrr m�rmr�r Lnrrrrrr�rrrni«nrr�ziirrrrrrrrrrrrrrrrrrrrrrrrr r NGRTH ELEVATIOM�•,. EA.5T'ELEV.hTndN WEFT ELEVATIUN _. rd11fGG1�"fifl'lllOjPO;(fJ//NA(1ldllpOlO.:lll, aear�/lGuwsvLrs%/ 5f7�llTHl ELEVATII13Fd South Building ITEYI VA GDP/SIP-1844 Oshkosh Ave 7 Page 7 Building Composition Corporate Business Park standards require buildings to be designed with four-sided detail and a distinct base, middle and top. The base of the building shall be articulated with a horizontal expression line creating a distinct ground level zone. The mid-section shall be articulated to form an expression line which sets up the building's top, while the top portion of the building shall include architectural features that provide distinction and clearly shows a division of roof and walls. The front facade shall include architectural features which emphasize it as the front facade. The proposed elevations for the south building meet these standards as canopies and variation of materials provide distinction to the facades and projections related to the entrance are utilized to emphasize the front facades. The north building elevations also meet building composition standards as entrance canopies along the first floor entrances along with a covered patio area define the ground floor of the building. The windows shown on the elevations provide distinction of floor levels and the projections at the top of the building show a division of roof and walls. The expansive glass window and door areas on the front(north and west) elevations serve to emphasize the front facade. Overall Site The applicant is requesting BSMs related to landscaping for specific locations, increased number of ground signs, and reduced sign and pavement setbacks. To offset the landscaping code deficiencies,increased number of signs and reduced monument sign and pavement setbacks, the applicant has exceeded the overall landscaping point requirement for the site and also exceeded the minimum Class I material allotment for both buildings. Landscaping has also been added around the monument signs to soften its appearance from the public right-of-way. Staff is comfortable that the applicant has adequately offset the requested BSMs and the overall site is complimentary to the surrounding area. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City's Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. ITEU VA GDP/SIP-1844 Oshkosh Ave 8 Page 8 (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. Staff recommends approval of the General Development Plan and Specific Implementation Plan and the findings listed above with the proposed following conditions: 1. Cross access drive aisle required for access to adjoining property to the east. 2. Southern access from N. Koeller Street shall be right-in, right-out only with final design approved by the Department of Public Works. 3. BSM to allow reduced front yard setback (north) to I for bike rack pad. 4. BSM to allow reduced side yard setback(east) to 5' for parking lot/drive-thru. 5. BSM to allow reduced main entrance side building foundation landscaping points to 0 points for the north building and 0 points on south building where 88.4 points and 74 points, respectively, are required. Minimum 88.4 landscaping points shall be applied to the street side of the north building and 74 points shall be applied to the street side of the south building. 6. BSM to allow increased number of ground signs to 2, where code allows 1 per street frontage. 7. BSM to allow reduced front yard setback for monument sign to 5' (south) and 10.7' (north). 8. BSM to allow increased lighting level along east property line to 0.6 footcandle. 9. Final landscaping plan shall be reviewed and approved by the Department of Community Development. ITEU VA GDP/SIP-1844 Oshkosh Ave 9 Page 9 SUBMIT 10: OA% Oshkosh DepiV or Corrimunry Dew"lopmerd City V p 111 Ch,j,Ch A,,,F1() Box 11 EY) of Planned Develolpmient Application Oshlko9M 541901 Oshkosh PWDNIE I920 236-501,59 For General Development Plan or Specific Implementation Plan "PLEASE TYPE OR PRINT USING BLACK Ill APPLICANT INFORMATION Pet0ioner� Date Petitioner's Address: City: St te: _�_ZiP: a ��4j Telephone #: Ern �k Contact preference: (3 Phone IJ Emick Status of Petitioner �Please Check): 5)t,/,')er "Aepresen t alive Tenant Prospective Buyer Pefltiorier's Sugnature equ(rlrec- 1A a-AD 9WHIR INFORMATION OwnerCs), "'k-9.1,11,41, Owner(s) Address: 2, City:. State:!JJ Zip Ernac l: C )nta El ctloreference: Phone OlErnail! �., Owriership Sicilus (Pkx,.,ise Check)� ln(.JMduaE Twst �X[Iurinfz uSilip 'Corpaotion Property Owner Consent: (required) Bys�griature herelon, I/We acknowledge thnf Ofy offi6ak,and/or erne loyees may, in lhe perfori-nance of ti functions, erder, upon the property fo inspect or gather other informatiort necessary to process this application. t also,understand that aH rneefing dates are tentafive and may be postponed by the Planniing Services Division for incornp ete submissions or,Cafl cdministrafive reasons. Properly Owner's Slgncfwe� Dote TIPE 9F REQUEST:, 0 Genern Development Pion (Gi 0 G ererah Development Pilo) (GDl Amendment PNSl irnp ernenfafion Phan (SIP) [I Specific tr­np ernentafion Plari, (SIP) Amen dmen IL SITE INFORMATION Aiddress/Locafloni of Proposed Ill .........____....... -—----_-_- Proposed Project Type� e2 -LV11111­1�$J'.a�­r '­............ CUI'Ier0 Use ou Prol IN .........Z oning� Land Uses Surrounding Youir Site: Norlih: SOLSth: ................... -------------- --------- Ea5l -West: . ................... ------------- It Is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the,proposal Application fees are due at time of submittal. Make check payable to City of Oshkosh. Please refer to the fee schedule for,appropriate fee. FEE IS NiONI-REFUiNDABLE For more informahon 1,,)leasevisit the City's webs,ite at "vi Staff Date Ill Page 10 j prq)osed grading plan. lfying the location, species, and insiailation size of Li Specific landscaping plan for,the subject sate spec plantings, The landscaping plans shall include a tabie surnrnarizing all proposed species, L3 Architectural plans for any nonresidential buildings, muiti-florn4y strucfures, or building clusters, other,than conventional single-farnily or twc-fOrnily horres on indNiduai lots, in sufficient detail to indicate the floor area, bulk, and visual character of such Widings. Ll Engineering pions for aH water and sewer systems, siormwater systems, roads, parking areas, and waikwa gala ign(jge an for the project, inclu&)g al� project identifical'k,)n signs, concepts,for publ�c fixtures ond signs, and group development sognoge themes that may or may, not vary frory) City,standards or common practices. L:i Specific written description of the proposed SIP including: Specific project 1hernes and images. Specific mix of dwelling unit types and/or (land uses, ed by dwelling units per acre, Specific residenfi6 densities and nonresidential intensities cs describ and land scap4-ag surface area ratio and/or offi er appropriate measures of density and Intensity. Specific ti,eatment of natural teatures, ir,�cluding parklarld. Specific relationship to nearby properties and public streets. 11 deve�oprrient lots Statistical data on, ryiiNmum iot sizes in the development, the precuse areas of a and pads; density/intensity of various parts of the development: building, coverage, sand ¢andscaping surface area ratio of all land uses; proposed staging, and any other plans required by Plan Comrnissiion. the standard A statement of rationoie as to why Pik zoning is proposed.This statement shall iist zoning requlremen IrS that,, in the applicant's opin�ion,, would inhibit the development project and the opporJr unHies fo: cornrnuriOy bef lrerp111°perfl that ore avo0ob1e through JI-ue proposed FID project. A ccrnpiete list of zoning standards that would not be n'-iet by the proposed SIP and the location(s), in which such exceptions/base standard modfficotions would occur. Phasing schedule, if more than one development phase is intended. Li Agreements, bylaws, covenants, and other documents relative to the operoflonal regulations of the development and par-ticularly providing for the permanent preservation and mainterlarce of common open areas and amenifies, L) A written description that demorastrates how the SIP is consistent with the approved GDP and any and all differences between fl"ae requirerlierfls of ffie approved GDP and Ple proposed V", I hereby certify that to the best of: my knowledge oil required application materials are Included with this application. 11 am aware that failure to submit the required completed application materials may result in denial or delay of the opplicotlon request. /.,,ppjicr Date: Signature Jrequired)-. 3 Page 11 6N C:IIIII A R C I I 1-1 F C"rf.IR F ,LIC: 1844 Oshkosh Avenue Project Narrative The project consists of two new commercial buildings. The north building is a two-story mixed use building containing first floor retail and restaurant spaces and second floor professional office space. The second floor includes a large covered patio space that can be utilized by the tenants and their guests. The total building area is approximately 21,516 s.f. The south building is a single story multi-tenant retail building. The design includes a drive-thru lane for a potential coffee or similar tenant. The total building area is approximately 7,896 s.f. The site includes 117 parking spaces for employee and customer use. The parking lot will consist of asphalt paving with concrete curbing. Perimeter and island landscaping are being provided to screen the parking and reduce the heat island effect from the parking lot. Site lighting will be provide to meet the zoning ordinance. The development takes advantage of the views of the park to the north as well as encourages pedestrian bike and foot traffic from the trails and public ways. Bike parking is being provided near both building. Adjacent properties to the east,west and south include similar developments providing continuity in use and public access. In addition,the proposed uses comply with the current zoning ordinance and comprehensive plan. We believe this development will provide a high quality amenity that the community can be proud of for many years. In addition, the local ownership group is sure to fill the lease space with great local and national tenants that the community will enjoy. VISION ARCHITECTURE,LLC Adam James,AIA Partner P.O.Box 224 Neenah,WI 54956 www.visiori-arcliitecture.net Page 12 b o'R rn rn rn — — — 00 w w J w W w N 11.1 w - bZ 191 lel N bZ LL C co 8l u 30' FRONT YARD SETBACK LINE 00w ; 4. U w LU - w v o a,co 09/ �v - o- s6 24' z • w •� 6.6' Z w w 4 O 30' ZO =) N z �U-: Z N O z IL -- U — — Q — CD — _ ELLER STREET wch � S J no qC J ' J Z Z z ❑ J O ❑ 00 z w ❑ w = F- LU u ❑Z w w �>> � CL > 7 LU S Z w O Z ~ J LU O CEO � Q N w w - m U � w ~ Q wo0waO R U ❑ O Z ❑ > w � � 0 N CD Z Q (D Z = 0 Z m Z w Q ~ w w ❑ w ❑ ? w O w ❑ z J ❑ Q Y > Q �Iv U = c'7 u7 > Y 0Q — < Lu70m 0 `ate 3 � 3 ? w w 3 Z U O = Q w ❑ U Q = � � ❑ 1 0 -7 � = boUUO � U - " H Z m Z O m Q w 0 w _ Q 0 0 2 Z U 0O�v o m Z J Q Z w = LJ J O = L, w > 0 coN a w w Q > L W J Q J O Z mLLLL- N z11JUz UzZU � LU JQZ V) � Z (� � OwLu Z O w 0 Z Q w Q n J > LL, =) iw w ZU > (=jwO ~r) ❑ U V > W p mLoaow 0 � (Davwi O ? n - 0m LL J Q J Z LLI7 s°m Q 07 L W W �� �� �'0 Q j W W l 7 O m � p 9 W Q W Z W O Q � v _Z i Q it q Qw � o z N N,i is�q i" qil"j° Q n. w �f LJ ZN w O z I" I I> W .........P J W C W W > > r I W Z O W c!1 Q N � U Z_ J O Q W G 1-/ FW-- R Z Q a 0 OD J a U ZV) O w 1 � CITY OF OSHKOSH HIGHWAY 21 HOSPITALITY GROUP LLC LAKE SHORE DEVELOPMENT OF OSHKOSH LLC PO BOX 1130 5108 1 AH MAY TAH RD 230 OHIO ST 200 OSHKOSH WIS4903 OSHKOSH W154901 OSHKOSH W154902 PRIME SPACE LLC FOX COMMUNITIES CREDIT UNION VISION ARCHITECTURE LLC 1325 N SUMMER RANGE RD 3401 E CALUMET ST PO BOX 224 DE PERE WI 54115 APPLETON WI 54915 NEENAH WI 54956 PRIME SPACE DEVELOPMENT 230 OHIO ST OSHKOSH W154902 Page 16 "Clio �L,1h.90' 29p5, �����.�� gb.28• ',V � a a 56. 6 �'tP h5 N s RAT.H...L.A a33 18255 z 'a�35 1874 1850 XADSAJAV � N o �� Q e o L / ✓ 1,111, II„���'� rY/2 F: V Vuu T �� g�g m " g� a n o m — T m � IM, 11248 o " A BS 1 a N v " m d ® ,® ,,,,, J, ,,, J r ` ,,, lilnl ��.�U Irr l ......... ulnl 5�D C ii(y iuif Oshrlvcavh imalps and data aI e=lime rode d b Ik e used for ale=IrneMlralll Ilde illfic„do n purposes i inlly,and ............................................................ y (he �,uty Of l 1 lk0ylh aSSUITes no II vulnCy IOIr dhe accuracy cutr of dhe lntalli nticnln IlPncns= using thneM nt0lrin bD11 pole= I'P—Spoin iilkalle bi ve=Iriif iilne accuracy or luallll Itisc,lainrneMl slleMa r go to � �III���':�I��Il�ll��ll � M W � y II. �< :M ,t IF°Irulnl'��Iilnl vuww d oshlscash vvil us/GlSdisclal incur LAIr�paired Ib Cwut^of Oshkosh,N Oshkosh GIS Phu 'il'hdy Corr INsskm S Ilo 4'Ihn Ifl:I.l I omi I d"2 A I flan C,„eolmisskm Silo I'hir Ifl 71.E I o01 p rllo rnwd Page 1-7 O %- - CBP-PD m MRj2 l�� �. u a�Ilo �� �� UMU U �... C P- PD ONE L ' SMU- - {.SR-5 5 -9 I-PD -20 c e.,1 z cn SMU SMU- N. d ®r ®r I 1 u 110,09 1 Il 500 ft cii(y Dif a<shrlkash i and data are=lime rode d b Ik e used for ge=IrneMlralll Ilde iffic„do n purposes iDInlly,and ............................................................ �he �,uty Of l lvlken;lhl aSSUITes no II IvulnCy teen dhe ne,cclnoutr of dhe lntarli ntirnln IIPuons= uaailrrt thneM ntenlrin ctiorr pole= Ire Sponln iilkalle br ve=Iriif iilne accuracy or luallll rtisc,lainrneMl slleMa r go to � �III���. �l��ll�li��li � M W � y I,. �< :M ,t IF°Irulnl'��Iilnl vuww d oshlscash vvil uu,7/GI dIisccrn'u�inc r LAIr�paired Iby�Cwut^of Oshkosh,N Oshkosh Gls P nilling"IMll C i,orr mikskm Silo 4lhn Ifl:I.l I omi I du 2 iAI flan C oor misskm Silo 4Ihn Ifl 71.I I ooi p rlio rlwd Page 18 b;rpirc^,k; %/ �/� / i a r/,� .l >%hn�d°I,r.,✓,Yr�lra� r;p`, �u�u, ��,,.m,.. F er�� �rk���Ur'7� n ! � P �%Ia81�//p sl/Yl l(Y�d�11)l/Idyl✓myi rlP�i)�%I� IYfL p91€li pJIC. / /:p p (� i�/r�//, iF u' V!I@(IIRa r i i i n I t i //1 1 /"mkY( IN � i�ii � �G /add r�lA7Pr"llnf�l/N(' rn, I o�Lm�/ �mWNo"�/r�//0%H, AN, I/e/p'ji/00 nrlJ/„�" " Iuµ . ................ �/,/,////""","","",","""//-,//,/,/,/,/,/,/,//;,;,;;;;;;;;;/..... ....... ......... d ® ,® ,,,,, J, ,,, J r ` �,,, n lilnl ��.�U Irml C ii(y luif k)nalnlvcavly imalps and data pane lithe=nrnde d b Ikhe used for ale=nrneMnralll nude iffic„tionn purposes Iannlly,and ............................................................ y tlhe= sully can l911ken,lh assurnes no Inability fern tlhe accuracy of tlhe nnnnhminnrntl€nnn Ihose using the ii l i i 1 IFIrinn'blnn �' I t&:9I4I2020 ntnnrnn bD`I pl= r=npoin ilale an v=rif in� accuracy For Ia111 aisclailrMn IsllMa r go to Oshkosh vvn d oshsash vru uu7/GIISdIscl 'u LAIrepaired Ib Cwut^of Oshkosh,N Gl',H'I nilling"IMll I orr mikskm Silo 4lhn Ifl:I.l I omi I du 2 iAI I'hur I oor misskm Silo 4Ihn Ifl€I.I I ooi p rlio nwd Page 19 1