Loading...
HomeMy WebLinkAbout0108119-Building (paving for basketball court)OSHKOSH ON THE WATER .lob ,Address 433 W 15TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MR/MRS EDMUND C NICHOLS Contractor FOX VALLEY ASPHALT Category 142 - Decks, Patios, Ramps No 108119 Create Date 05/1 $/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Paving a 37'x19' area behind the house for a basketball court. This area is not to be used for parking vehicles. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,227.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $32.00 Park Dedication $0.00 Date 05/15/2004 Final/O.P. 00/00/0000 Parcel Id # 0907540000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 433W 15TH AVE Agent/Owner OSHKOSH WI 54902 - 6543 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: /~"~ ~ \_~'Tt~ ~ ZONING: CONSTRUCTION DATA: ~ New Construction ~ Addition ~ Alteration ~PE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) ~ COMPLIANCE CHECKLIST DEFICIENT DEFICIENT DEFICIENT [] Use [] Lot Width [] Lot Area [] Lot Area Per Family [] Flood Plain [] Front Yard [] Front Yard Side Street [] Rear Yard [] Side Yards [] Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [--~ Transitional Yard Standards COMMENTS: [-] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. APPROVED Plan Commission Action Required DENIED Variance(s) Required REVIEWED BY: 2003 0', 50.0' 50.0' / so.o so.o' / DISCLAIMER · ~,~m~.,~...~.~,.~,,.~.~...m~..o~ 433 W. ~5th Ave. N and information located in various city, county Ci~ of Os~osh Wisconsin purposes only, The City of Oshkosh is not r~ If discrepencleScity of Oshkosh.are found, please contact the/ q" = 20' cr~ by- djb 05/13/04