HomeMy WebLinkAbout0108188 BOSHKOSH
ON THE WATER
.lob Address 1903 OHIO ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JULIE B SHERMAN
Contractor OWNER
Category 141 - Exterior Remodeling
No 108188
Create Date 05/20/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Installing a 3'x4' precast platform unit with steps off the front of the house. Code compliant handrails and guardrails will be installed.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$500.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$20.00 Park Dedication $0.00
Date 05/20/2004 Final/O.P. 00/00/0000
Parcel Id # 1409070000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 1152 W 18TH AVE
Agent/Owner
OSHKOSH
WI 54902 - 6659 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.