HomeMy WebLinkAbout22. 20-411 SEPTEMBER 22, 2020 20-411 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE SPECIFIC IMPLEMENTATION PLAN AMENDMENT
FOR ADDITIONAL PARKING, SHUNTING AREAS, AND
ACCESSORY STRUCTURES AT U-HAUL 900 N. KOELLER
STREET
INITIATED BY: U-HAUL INTERNATIONAL
PLAN COMMISSION RECOMMENDATION: Approved w/ conditions
WHEREAS, the applicant would like to amend the previously approved Specific
Implementation Plan for additional parking, shunting areas, and accessory structures at
900 N. Koeller Street.
WHEREAS, the Plan Commission finds that the planned development
amendment for additional parking, shunting areas, and accessory structures to the
approved site design at 900 N. Koeller Street is consistent with the criteria established in
Section 30-387(C)(6) of the Oshkosh Zoning Ordinance.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the amendment to the specific implementation plan for additional parking,
shunting areas, and accessory structures to the approved site design at 900 N. Koeller
Street, per the attached, is hereby approved with the following conditions:
1. BSM to expand the legal nonconforming use (personal storage facility) and
allow additional accessory structures (two (2) personal storage buildings,
LP filling station and an overhead canopy) in the front yard.
2. Final landscaping plan shall be reviewed and approved by the Department
of Community Development and shall substitute out any proposed plants
listed on the "Use Sparingly" or "Prohibited" plant lists for code compliant
plantings. Final landscaping plan shall also provide the required yard
landscaping points based on the area of the storage buildings and LP filling
station.
3. Applicant shall plant at least the proposed number of shrub landscaping
SEPTEMBER 22, 2020 20-411 RESOLUTION
CONT'D
points and one medium tree in each proposed landscaping end cap.
4. Applicant shall ensure that the widths of the east -west running landscape
islands are at least 10 feet and include at least 50 points of shrub
landscaping and three shade trees each along their lengths.
5. LP tank shall be limited to a maximum height of 16'-6" and a maximum
width of 4'-0"
6. LP tank shall not have signage/logos/trade dress/etc. installed on or around
the tank. LP tank shall have at least 40 landscaping points installed around
the tank.
7. No outdoor storage allowed outside of the designated vehicle display and
vehicle shunting areas.
8. Applicant shall submit plans for a permanent canopy compatible in
appearance to the existing building for Department of Community
Development review as part of the Site Plan Review process or the existing
canopy shall be removed immediately upon completion of the Site Plan
Review Process.
9. Applicant shall submit storm water management plans for Department of
Public Works review during the Site Plan Review Process.
10. All conditions of the original SIP approval from 02/13/2018 are still in effect.
TO: Honorable Mayor and Members of the Common Council
FROM: Mark Lyons
Planning Services Manager
DATE: September 17, 2020
RE: Approve Specific Implementation Plan Amendment for Additional Parking,
Shunting Areas, and Accessory Structures at 900 N. Koeller Street (Plan
Commission Recommends Approval)
BACKGROUND
The subject site consists of a 10,400 square foot parcel located at the southeast corner of N.
Koeller Street and Robin Avenue. The subject area contains a commercial building, associated
surface parking facilities and site signage. On February 13, 2018, the Common Council
approved an amended General Development Plan and Specific Implementation Plan
(GDP/SIP) for an indoor storage/outdoor display land use (U-Haul) located on the subject site.
The surrounding area consists of multi -family residential and institutional uses to the north,
multi -family residential to the east, multi -family residential and commercial to the south and
public right-of-way and Interstate 41 to the west. The 2040 Comprehensive Plan recommends
Interstate Commercial land use for the subject site.
ANALYSIS
The petitioner requests an amendment to the Specific Implementation Plan amendment
approval to allow for additional parking, shunting areas and accessory structures. The petitioner
requests expansions to the parking and vehicle display area facing N. Koeller Street in the front
(west edge) of the site. Additional parking/display is proposed in the southwest corner of the
site. The petitioner also requests additional vehicle display/shunting areas along the eastern
edge of the existing outlot. These areas are designated on the proposed site plan for trailers and
towing. An LP fill station with bollards and landscaping are proposed adjacent to the outlot's
southeast corner. The petitioners installed a canopy in front of the existing building on -site.
This canopy designates the pickup/drop off location in front of the building. In order to
accommodate the canopy and 24' required for two-way drive access, the petitioner has removed
parking stalls from the front of the building. Two detached storage buildings are proposed for
the western portion of the site (behind the westernmost vehicle display areas). Additional
planter islands and beds are proposed in a number of locations including the ends of these
buildings and at the
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://w .ci.oshkosh.wi.us
ends of the western and southwestern vehicle display areas. A Base Standard Modification
(BSM) will be required to allow the storage buildings as they constitute both an expansion of a
non -conforming use (personal storage facility on a Suburban Mixed Use with a Planned
Development Overlay zoned parcel) and construction of accessory structures in the front yard.
FISCAL IMPACT
Approval of this project may result in a small increase in assessed property value for the site
and should require no additional city service provision. The owner is anticipating spending
approximately $250,000 on the additional improvements.
RECOMMENDATION
The Plan Commission recommended approval of the Specific Implementation Plan amendment
with findings and conditions at its September 15, 2020 meeting. Please see the attached staff
report and meeting minutes for more information.
Respectfully Submitted,
Mark Lyons -
Planning Services Manager
Approved:
"' - "'
Mark A. Rohloff
City Manager
xcp_�114�
City Hall, 215 Church Avenue P.O. Box l l30 Oshkosh, WI 54903-1130 920.236.5000 http://v .cl.oshkosh.wi.us
ITEM: SPECIFIC IMPLEMENTATION PLAN AMENDMENT FOR ADDITIONAL
PARKING AND SHUNTING AREAS AND ACCESSORY STRUCTURES IN
THE FRONT YARD AT 900 N. KOELLER STREET
Plan Commission meeting of September 15, 2020.
*This item was laid over from the August 41h and August 181h1 2020 meetings.
GENERAL INFORMATION
Petitioner: David Bynum
Owner: U-Haul International
Action(s) Requested:
The petitioner requests approval of a Specific Implementation Plan amendment for additional
parking and shunting areas and accessory structures in the front yard at 900 N. Koeller Street.
Applicable Ordinance Provisions:
Planned Development standards are found in Section 30-387 of the Zoning Ordinance.
Background Information Property Location and Type:
r
o
The subject area consists of one parcel, approximately 10.75 acres in size, located at the
southeast corner of N. Koeller Street and Robin Avenue. The site is owned and operated by U-
Haul International as a climate controlled indoor storage facility with associated vehicle
shunting and display areas. The subject area contains a commercial building, approximately
104,000 square feet in size, associated surface parking facilities and site signage. Prior land uses
on the site included the former K-Mart and Sears Grand retail establishments. The surrounding
area consists of multi -family residential and institutional uses to the north, multi -family
residential to the east, multi -family residential and commercial to the south and public right-of-
way and Interstate 41 to the west. The 2040 Comprehensive Plan recommends Interstate
Commercial land use for the subject site.
On February 13, 2018, the Common Council approved an amended General Development Plan
and Specific Implementation Plan (GDP/SIP) for an indoor storage/outdoor display land use (U-
Haul) located on the subject site. The GDP/SIP was approved with multiple conditions
including a condition that "No outdoor storage allowed outside of the designated vehicle
display and vehicle shunting areas." The intent of the outdoor storage restriction was to
prevent cluttering of the highly visible site with vehicles and other items.
In 2019, Planning Services staff was informed that the outdoor vehicle display was starting to
spill out of the originally designated and approved vehicle shunting/display areas. Staff visited
the site, photographed a number of locations where vehicle display was out of compliance with
the original SIP approval and sent a correction notice to the property owner on March 251h, 2020.
The violation noted in the letter was for the parking of multiple vehicles and trailers outside of
the designated shunting and display areas. The letter instructed the owner to remove these
vehicles/trailers from non -designated areas by the April 81h compliance date. On April 81h and
161h, planning staff re -inspected the site and found that the violations were not corrected. Staff
sent a $100 follow up letter with a compliance date of April 271h. The petitioner contacted
planning staff and had multiple conversations with staff regarding the site and potential
options to address the violations while meeting the needs of the property owner on the site.
Staff explained that an SIP amendment was necessary in order to allow increased vehicle
display/shunting areas on -site beyond what was originally approved. The petitioner later
expanded the scope of potential site modifications to include an LP tank, overhead canopy and
two personal storage buildings in the front yard. He attended a Plan Commission workshop on
June 2nd1 2020 with staff and the Plan Commission. He has since filed a formal SIP amendment
request to allow additional parking/shunting areas and accessory structures in the front yard.
Subject Site
Existing Land Use
Zoning
Commercial — U-Haul
SMU-PD
ITEM - SIP Amendment — 900 N. Koeller Street
Adjacent Land Use and Zoning
Comprehensive Plan Land Use Recommendation
Land Use
2040 Land Use Recommendation
Interstate Commercial
ANALYSIS
Use
The previously approved GDP/SIP (2018) was to allow U-Haul to operate the site as an indoor
storage facility with outdoor display/shunting areas. The storage land uses are not permitted
under base code on an SMU-PD zoned parcel. The owner has modified the plans and is now
proposing additional outdoor display/shunting areas, two personal storage buildings, an LP
tank, and a canopy in the front yard. A Base Standard Modification (BSM) is required to allow
the expansion of a legal nonconforming use (personal storage facility) and construct the two
personal storage buildings on this Suburban Mixed -Use with a Planned Development Overlay
(SMU-PD) zoned parcel. Staff is supportive of the Base Stand Modification (BSM) provided the
applicant meets several conditions (explained below). The applicant has stated that no
additional employees are expected to work on -site.
Site Design & Access/Parking
The site has two access drives from N. Koeller Street and two access drives from Robin Avenue.
A condition of the original SIP approval was that the development be limited to straight truck
deliveries only. The petitioner is not proposing any changes to the site's access drives. The
petitioner requests expansions to the parking and vehicle display area facing N. Koeller Street
in the front (west edge) of the site. Additional parking/display is proposed in the southwest
corner of the site. The petitioner also requests additional vehicle display/shunting areas along
the eastern edge of the existing outlot. These areas are designated on the proposed site plan for
trailers and towing. An LP fill station with bollards and landscaping are proposed adjacent to
the outlot's southeast corner. The petitioners installed a canopy in front of the existing building
on -site. This canopy designates the pickup/drop off location in front of the building. In order
to accommodate the canopy and 24' required for two-way drive access, the petitioner has
removed parking stalls from the front of the building. Two detached proposed storage
buildings are planned for the western portion of the site (behind the westernmost vehicle
display areas). Additional planter islands and beds are proposed in a number of locations
including the ends of these buildings and at the ends of the western and southwestern vehicle
display areas.
The site still remains well over the 70% impervious surface maximum permitted for an SMU-
zoned parcel. However, the proposed storage buildings, LP filling station and existing canopy
are all proposed or located over existing impervious area. Proposed landscaping islands and
ITEM - SIP Amendment — 900 N. Koeller Street
end caps would reduce the total impervious surface area of the site. The previously approved
plans showed 21 parking spaces on -site. With the installation of the canopy, the applicant
would remove 6 parking spaces. The parking count would then be 15 spaces which is the code
minimum requirement for the site. Staff wants to remind the Plan Commission and applicant
that per the original Planned Development approval, the outlot will need to be converted to
grass if it is not developed by February 13ffi, 2021.
Customers and the general public access the site from N. Koeller Street or Robin Avenue and
can circulate through the site via drive aisles running through the site. Much of the parcel is
already covered by building and paved areas. The proposed buildings, LP tank, vehicle
parking/shunting and landscaping areas will reduce the amount of open paved area. These site
additions will not impact the main circulation paths through the site. They would however
increase the amount of structures and vehicles parked/displayed on -site.
Lighting
The petitioner has not proposed any changes to the on -site lighting. If any changes are
proposed the petitioner will have to submit a revised code -compliant photometric plan for staff
review.
Signage
No sign changes are proposed as part of this SIP amendment. Staff recommends that a
condition of approval be that no signage be permitted on or around the LP tank.
Landscaping
900 N Koeller Landscaping
Points Required
Points Proposed
108 points per building
550 linear feet of foundation
and 40 points for the
/ 100 = 40 points per 100
propane station - 256 total
Building Foundation
linear feet - 220 total points
points
210 points (not counting
species provided but
Paved Area
0 points
listed as prohibited)
Street Frontage (N Koeller Street)
0 points
0 points
Street Frontage (Robin Avenue)
0 points
0 points
Total Street Frontage
0 points
0 points
5,155.25 sq. ft. of building /
Yards
1000 x 20 - 104 points
0 points
Bufferyards
0 points
0 points
466 points * Note that the
applicants stated they are
Total Points
304 points
providing 574.5 Points
ITEM - SIP Amendment — 900 N. Koeller Street
The previously approved SIP amendment included landscaping requirements for the site. In
order to offset the increase in vehicle display/shunting areas, two personal storage buildings, LP
tank and new canopy, the applicant proposes additional landscaping for the site. The petitioner
proposes 40 points of foundation landscaping around the propane station. Landscaping end
caps are proposed at the ends of both proposed storage buildings. Additionally, two additional
landscape end caps are proposed for the green buffer adjacent to Sawyer Creek and three end
caps are proposed at the N. Koeller Street entrances.
Building Foundation
The proposed landscape plan meets the total point requirement for building foundation
landscaping. Based on the proposed linear footage of building foundation (500 linear feet for
the 2 storage buildings and 55 linear feet for the LP station) the proposed number of building
foundation points meets the total required by code. Of note is that the applicant has proposed
Autumn Blaze Maples for the landscaping end caps at the west ends of the two proposed storage
buildings. These trees are listed in the "Use Sparingly' list of the Landscaping requirements.
The applicant appears to have used several of these trees elsewhere in the development.
Therefore, staff recommends that a condition of approval be that the two proposed Autumn
Maples not already planted be exchanged for other tall/shade trees that are not in the "Use
Sparingly" or Prohibited" plant lists. Staff also recommends a requirement of least 40 points of
shrub foundation around the LP station.
Paved Area
The applicant has proposed additional paved area landscaping in the form of landscaping
islands and end caps. Staff has evaluated the additional proposed landscaping. The Spirea
Japonica plants the applicant proposed are prohibited under the zoning ordinance so the
applicant must substitute them out for an acceptable selection. The addition of the landscaping
islands and end caps is an improvement on the site's current condition. The applicant could
add even more landscaping points by planting medium trees in the end caps. Staff
recommends that as a condition of approval, the applicant must plant at least the number of
shrub landscaping points currently proposed and one medium tree in each landscape end cap.
For the linear landscape islands proposed adjacent to the storage buildings, staff recommends
requiring that these islands are at least 10 feet wide and contain at least 3 tall trees and 50 points
of shrub landscaping each. The applicant will have to address any prohibited species by
submitting a revised code -compliant landscaping plan as part of the Site Plan Review process.
Street Frontage
The applicant is not proposing any additional site work along the street frontages so additional
street frontage landscaping is not required. The plantings shown on the applicant's landscaping
plan appear to be the existing plantings already located on -site. In reviewing the landscaping
plan staff did not see street frontage landscaping proposed beyond the current landscaping.
Yards
Code requires 20 yard landscaping points per 1,000 sq. ft. of gross floor area proposed for the
site. The applicant does not appear to provide any additional yard landscaping beyond the
current landscaping on -site. The two proposed storage buildings and LP propane station
combined add approximately 5,155.25 sq. ft. of accessory structure area to the site. Therefore,
ITEM - SIP Amendment — 900 N. Koeller Street
104 points of new yard landscaping are required. The applicant will have to address this issue
with a revised landscaping plan submitted as part of the Site Plan Review Process.
Bufferyard
The applicant is not expanding into the areas immediately adjacent to neighboring parcels so
additional bufferyard landscaping is not required. The Plan Commission could at its discretion,
however, require more robust landscaping in either of the areas abutting neighboring parcels.
The applicant has not proposed additional bufferyard landscaping.
Storm Water Management
The Department of Public Works has reviewed the proposal and stated that although the site
disturbance for the LP tank and proposed buildings appear minimal, storm water requirements
from Chapter 14 of the Municipal Code may be triggered. A full site plan review submittal
incorporating the new buildings and LP tank into one plan set will be required. Any storm
water requirements can be addressed during the Site Plan Review process.
Building
No changes are proposed to the existing building or its facades. However, the petitioner
proposes to add two 2,500 square foot personal storage buildings to the front (western portion)
of the site. He would clad the new storage buildings with a combination of brick and steel
paneling. Staff recommends as a condition of approval that the petitioner must use Class I
materials for the end walls and the first four (4) feet from the ground up of the north and south
facades of these buildings. The petitioner will require a BSM to allow these buildings, as they
constitute both an expansion of a non -conforming use (personal storage facility on an SMU-PD
zoned parcel) and construction of accessory structures in the front yard.
ITEM - SIP Amendment — 900 N. Koeller Street
The above two images show the proposed storage buildings that would be placed in the front of the site off
of North Koeller Street.
The LP tank will consist of the approximately 16.5' tall and 4' wide vertically -oriented propane
tank and surrounding bollards. This tank would be installed adjacent to the southeast corner of
the outlot. It would look very similar to the tank shown in the image below. Staff recommends
that a condition of approval be that the tank has maximum dimensions of 16.5' in height by 4' in
width and that no signage/trade dress be permitted on or around the LP tank. The LP tank is an
accessory structure proposed in the front yard so will require a BSM. Staff is supportive of the
BSM provided the required landscaping is installed on -site and 40 points of shrub foundation
landscaping are placed around the LP tank.
ITEM - SIP Amendment — 900 N. Koeller Street
w.,
finllri{ 11-is
®EST 4 Wis s
�1
Ar
OIL
bplg`ter-
ARWA
The above image shows an LP filling station very similar to the one proposed as part of this SIP
amendment request.
The canopy was installed without approvals or permits. The applicant would like to have the
canopy approved as part of this SIP amendment. The canopy is an accessory structure in the
front yard and requires a BSM. The applicant states in his narrative that the canopy is located at
the center of the lot and it was placed there for a number of reasons. The placement of the
existing building on the site prevents the canopy from being located to the north, east or south
sides of the existing building. According to the applicant, the customers need a visual point to
return rental equipment to the store. The canopy is located straight in front of two driveways to
maximize visibility. It also shelters customers from the elements while returning vehicles to the
store and places the return area near the store entrance. The existing canopy on -site is shown in
the image below. Staff can support the idea of a canopy on -site and its placement/dimensions
based on the dimensions of the drive aisles around it but the existing canopy appears to be a
pop-up type canopy that is often associated with temporary events/occurrences. Staff has
concerns with the nature of the existing canopy and would not support a BSM to allow this
canopy as installed to remain as -is in the front yard long-term. Staff would recommend that a
condition of SIP amendment approval be that the applicant submit plans for a permanent
canopy architecturally compatible with the existing building. The canopy could be the same
footprint and height as the existing one but would need to be more permanent in nature. Any
proposal to add trade dress to a permanent canopy would require staff and Plan Commission
review.
ITEM - SIP Amendment — 900 N. Koeller Street
The existing canopy was not approved or permitted and appears to be a temporary pop-up canopy.
FINDINGS/RECOMMENDATION/CONDITIONS
In its review and recommendation to the Common Council on an application for a Planned
Development district, staff recommends the Plan Commission make the following findings
based on the criteria established by Chapter 30-387 (C)(6):
(a) The proposed Planned Development project is consistent with the overall purpose
and intent of this Chapter.
(b) The proposed Planned Development project is consistent with the City's
Comprehensive Plan and other area plans. (It is the responsibility of the City to
determine such consistency.)
(c) The proposed Planned Development project would maintain the desired
relationships between land uses, land use densities and intensities, and land use impacts
in the environs of the subject site.
public sewer and water and public roads.
(h) The proposed Planned Development project will positively contribute to and not
detract from the physical appearance and functional arrangement of development in the
area.
(i) The proposed Planned Development project will produce significant benefits in terms
of environmental design and significant alternative approaches to addressing
development performance that relate to and more than compensate for any requested
exceptionsibase standard modifications variation of any standard or regulation of this
Chapter.
ITEM - SIP Amendment — 900 N. Koeller Street
Staff recommends approval of the Specific Implementation Plan amendment as proposed with
the findings listed above and the proposed following conditions:
1. BSM to expand the legal nonconforming use (personal storage facility) and allow
additional accessory structures (two (2) personal storage buildings, LP filling station and
an overhead canopy) in the front yard.
2. Final landscaping plan shall be reviewed and approved by the Department of
Community Development and shall substitute out any proposed plants listed on the
"Use Sparingly" or "Prohibited" plant lists for code compliant plantings. Final
landscaping plan shall also provide the required yard landscaping points based on the
area of the storage buildings and LP filling station.
3. Applicant shall plant at least the proposed number of shrub landscaping points and one
medium tree in each proposed landscaping end cap.
4. Applicant shall ensure that the widths of the east -west running landscape islands are at
least 10 feet and include at least 50 points of shrub landscaping and three shade trees
each along their lengths.
5. LP tank shall be limited to a maximum height of 16'-6" and a maximum width of 4'-0"
6. LP tank shall not have signage/logos/trade dress/etc. installed on or around the tank. LP
tank shall have at least 40 landscaping points installed around the tank.
7. No outdoor storage allowed outside of the designated vehicle display and vehicle
shunting areas.
Applicant shall submit plans for a permanent canopy compatible in appearance to the
existing building for Department of Community Development review as part of the Site
Plan Review process or the existing canopy shall be removed immediately upon
completion of the Site Plan Review Process.
Applicant shall submit storm water management plans for Department of Public Works
review during the Site Plan Review Process.
10. All conditions of the original SIP approval from 02/13/2018 are still in effect.
The Plan Commission approved of the Specific Implementation Plan amendment as requested
with findings and conditions noted. The following is the Plan Commission's discussion on the
item.
08-04-2020 Minutes
Mr. Lyons explained since the initial filing, staff has been continually working with the
applicant on outstanding items. He said in talking with the applicant, staff felt it was best to lay
the item over another meetings. He stated the applicant agreed with staff.
Motion by Hinz to lay over the Specific Implementation Plan amendment for additional parking and
shunting areas and accessory structures in the front yard at 900 N. Koeller Street until the August
18, 2020 Plan Commission meeting.
Seconded by Ford.
ITEM - SIP Amendment — 900 N. Koeller Street 10
Ms. Propp asked if there was any discussion on the motion.
There was no discussion on the motion.
Motion carried 8-0.
08-18-2020 Minutes
Ms. Propp stated the applicant is requesting this item to be laid over until the September 15,
2020 Plan Commission meeting.
Motion by Hinz to lay over the Specific Implementation Plan amendment for additional parking and
shunting areas and accessory structures in the front yard at 900 N. Koeller Street until the
September 15, 2020 Plan Commission meeting.
Seconded by Ford.
Ms. Propp asked if there was any discussion on the motion.
There was no discussion on the motion.
Motion carried 8-0.
09-15-2020 Minutes
Site Inspections Report: Mr. Hinz and Ms. Propp reported visiting the site.
Staff report accepted as part of the record.
The applicant requests approval of a Specific Implementation Plan amendment to allow for
additional parking, shunting areas, and accessory structures at 900 N. Koeller Street.
Mr. Wiley presented the item and reviewed the site and surrounding area as well as the land
use and zoning classifications in this area. The petitioner requests expansions to the parking and
vehicle display area facing N. Koeller Street in the front of the site. Additional parking/display
is proposed in the southwest corner of the site. The petitioner also requests additional vehicle
display/shunting areas along the eastern edge of the existing outlot. These areas are designated
on the proposed site plan for trailers and towing. An LP fill station with bollards and
landscaping are proposed adjacent to the outlot's southeast corner. The petitioners installed a
canopy in front of the existing building on -site. This canopy designates the pickup/drop off
location in front of the building. In order to accommodate the canopy and 24' required for two-
way drive access, the petitioner has removed parking stalls from the front of the building. Two
detached storage buildings are proposed for the western portion of the site. Additional planter
islands and beds are proposed in a number of locations including the ends of these buildings
and at the ends of the western and southwestern vehicle display areas. He said staff
ITEM - SIP Amendment — 900 N. Koeller Street 11
recommends approval of the Specific Implementation Plan amendment as proposed with the
findings and conditions listed in the staff report.
Ms. Propp opened technical questions to staff.
Mr. Perry asked if the additional outside storage has to adhere to Class I materials and if it has
to be real brick opposed to plastic or spray paint -colored brick.
Mr. Lyons replied that it will have to be brick or brick veneer.
Mr. Hinz asked if the propane tank as shown in the report is okay given that staff does not want
the propane tank to have any signage.
Mr. Lyons replied that it was not okay.
Mr. Hinz asked if they could put propane signage on it.
Mr. Lyons replied that they can put propane signage on it, but not any additional signage for U-
Haul. He said that during the original approvals, they received approval for signage in excess of
what would typically have been allowed. Staff is of the opinion that they were granted a Base
Standard Modification for larger signage on the building and they do not need to go further
with additional signage.
Mr. Hinz asked if they could have the green propane signage, but not the signage that is above
it.
Mr. Lyons replied that staff is suggesting that they cannot have the U-Haul signage on it.
Ms. Propp asked if what they proposed for the frontage road building material is adequate.
Mr. Lyons replied that staff feels comfortable with what the petitioner is proposing with the
brick or brick veneer plus the knee wall with landscaping in front of it. He said that staff are
also requiring that one medium tree be added to the landscaping island, which will further
break up the plane. He said that in terms of the world of storage units, what the petitioner has
proposed is pretty good with the landscaping and exterior building materials that are being
added.
Mr. Wiley added that it is a significant improvement on what was originally submitted, which
were more modular units that looked like they were just put in place on the site.
Ms. Propp asked to see where they are illegally parking now and where they will be allowed to
park.
Mr. Lyons pointed out the parking areas on the site map including the approved customer
parking areas. He stated that with the original approval, the only places they were supposed to
be parking were the shunting area and the display areas. The petitioner is requesting essentially
ITEM - SIP Amendment — 900 N. Koeller Street 12
trailer parking along the side of the north property and that is the only additional new area that
they are requesting for parking.
Ms. Propp asked for confirmation that there was no parking or structure on the Sawyer Creek
side.
Mr. Lyons replied affirmatively, stating the only new additions to the south property line are
the two landscaping islands.
Mr. Kiefer joined the meeting at 4:20 pm.
Mr. Mitchell asked if there was any particular reason the landscaping on the southern border
goes halfway as opposed to continuing along the southern border.
Mr. Lyons replied that when it was originally approved by Plan Commission the concern was
the view of the shunting area from traffic headed in a northern direction on Koeller. The
landscape island was extended to soften the viewpoint looking at the shunting areas as you
travel north.
Mr. Mitchell stated that he noticed a lot of the images have vehicles parked along the area
where they don't have a curb. He asked if that would no longer be permissible.
Mr. Lyons stated that it was not permissible under the original approval either, which is why
some of the violation letters were sent. He stated that no vehicle parking is permitted in that
area.
Mr. Mitchell asked if the petitioner had been asked to consider continuing the landscaping the
entire way or if they were told they only had to do half.
Mr. Lyons replied that the concern at that time was what it looked like and that's why it ended
where it did.
Mr. Hinz stated that he thought there was a discussion about clearance on the side of the
building.
Mr. Lyons replied that there are some overhead entrance doors on the south side of the
building. He said that he does not recall specifically if there was enough clearance room for
getting in.
Ms. Propp asked if there were any public comments and asked if the applicant wanted to make
any statements.
David Bynum and Theresa Smith (applicants), 11700 W. Capitol Drive of Wauwatosa, stated
that they felt their points were well covered. Mr. Bynum said that after reviewing the
documentation, he is going to lean toward whatever Plan Commission's recommendations are.
ITEM - SIP Amendment — 900 N. Koeller Street 13
Ms. Propp asked if Mr. Bynum agreed with the staff conditions.
Mr. Bynum replied that he agreed and they could make it happen.
Mr. Hinz asked if he had been correct about the clearance on the south side of the building.
Mr. Bynum replied that Mr. Hinz is correct.
Mr. Mitchell stated that the clearance may become an issue when you get close to the very
eastern edge.
Mr. Lyons noted that Plan Commission did not want storage in that area during the original
approval, which is why the approved site plan does not contain any storage. He said that one of
the concerns that came up was limiting those storage areas.
Ms. Propp thanked Mr. Bynum and Ms. Smith for their statement.
There were no public comments on this item.
Ms. Propp closed public comments and asked if the applicant wanted to make any closing
statements.
There were no closing statements from the applicant.
Motion by Hinz to adopt the findings and recommendation as stated in the staff report.
Conditions:
1. BSM to expand the legal nonconforming use (personal storage facility) and allow
additional accessory structures (two (2) personal storage buildings, LP filling station and
an overhead canopy) in the front yard.
2. Final landscaping plan shall be reviewed and approved by the Department of Community
Development and shall substitute out any proposed plants listed on the "Use Sparingly"
or "Prohibited" plant lists for code compliant plantings. Final landscaping plan shall
also provide the required yard landscaping points based on the area of the storage
buildings and LP filling station.
3. Applicant shall plant at least the proposed number of shrub landscaping points and one
medium tree in each proposed landscaping end cap.
4. Applicant shall ensure that the widths of the east -west running landscape islands are at
least 10 feet and include at least 50 points of shrub landscaping and three shade trees
each along their lengths.
5. LP tank shall be limited to a maximum height of 16'-6" and a maximum width of 4'-0"
6. LP tank shall not have signage/logos/trade dress/etc. installed on or around the tank. LP
tank shall have at least 40 landscaping points installed around the tank.
7. No outdoor storage allowed outside of the designated vehicle display and vehicle shunting
areas.
ITEM - SIP Amendment — 900 N. Koeller Street 14
8. Applicant shall submit plans for a permanent canopy compatible in appearance to the
existing building for Department of Community Development review as part of the Site
Plan Review process or the existing canopy shall be removed immediately upon
completion of the Site Plan Review Process.
9. Applicant shall submit storm water management plans for Department of Public Works
review during the Site Plan Review Process.
10. All conditions of the original SIP approval from 0211312018 are still in effect.
Seconded by Ford.
Ms. Propp asked if there was any discussion on the motion.
Ms. Davey stated that Plan Commission had discussed putting a botanical barrier all the way
along the creek and looking at the picture now, it looks like they have several parking spaces
along the southern edge of the building which are also going to be contributing things that we
do not want going into Sawyer Creek. She is wondering if it would be prudent to suggest that at
least the botanical buffer go down that far for the protection of Sawyer Creek.
Mr. Ford asked staff if there is an expressed environmental concern regarding Sawyer Creek
and this property.
Mr. Lyons replied that staff did not have a specific issue or concern with that area. He said that
when the original approval went forward, they were looking at the overall reduction in hard
surface and the overall impact on the drainage of the site. He said that working through the
process initially, it was felt that it was a general overall improvement with the amount of hard
surface that would be removed for the site. He said there was expressed concern related to
snow storage and making sure that area was not used for snow storage. He said that Public
Works brought up that concern and Planning staff agreed that they did not want salt from the
parking lot running off into the creek.
Mr. Mitchell stated that the comprehensive plan cites that protection of water quality is critical
for Oshkosh's health, business, and recreational opportunities. The plan cites this area, although
not specifically this property, as an environmentally sensitive area given that the property is in
close proximity to a flood area. The number one goal in that section of the comprehensive plan
is to protect and preserve wetlands, shorelines, and environmentally sensitive areas. He said
that anywhere you have a large number of vehicles, you have drip oil and gasoline and
miscellaneous pollutants, which pose a risk especially if the surface flows directly into a creek.
The American Planning Association cites the impervious surface of the surrounding earth and
areas as a serious threat to water quality. He said this is certainly something that should be
looked at as a serious thing and that the photograph makes it look like any pollutants in that
area would flow into the creek in the event of heavy rain. He thinks that the presentations
provided by staff should address what the comprehensive plan says about the environmentally
sensitive elements of the proposal. It would be great to see the City have tools to support the
improvements that should be put in place because there really should be a buffer as far along as
is feasible to not enable continued pollution of our already heavily polluted waterways. He said
ITEM - SIP Amendment — 900 N. Koeller Street 15
that it is reasonable for Plan Commission to request that this project include a buffer and that
the City supports that in some fashion.
Ms. Propp asked about the drainage of the site and if Public Works will require an additional
drainage plan.
Mr. Gierach replied that without having the full detailed site plan, he is not sure exactly how
the site is draining. There is some internal storm sewer on the site, but he is not sure if it drains
directly south to the creek or north to one of the right-of-ways.
Ms. Propp asked if an additional drainage plan is needed.
Mr. Gierach replied that there is no need for a storm water management plan based on the work
they're showing here.
Ms. Propp asked if that was because it was grandfathered in.
Mr. Gierach replied that impervious disturbances does not trigger the code requirements for
storm water management plan because the amount of work they're doing.
Mr. Hinz asked for confirmation that Plan Commission worked with them on a storm water
management plan when this was originally approved.
Mr. Lyons replied affirmatively.
Mr. Hinz asked for confirmation that City ordinances are in place for setbacks alongside the
waterways so they are not right on top of the water.
Mr. Lyons replied affirmatively.
Ms. Propp asked for any additional comments.
Ms. Propp stated that she liked the idea of asking them to extend the green space along the
waterway to the extent that it works with the turning radius coming into their driveway.
Mr. Lyons stated that there is nothing in the code that specifically would require them to do
that.
Mr. Perry stated that he does not see how it can be completely extended with the parking spaces
as they're designated currently. He said that he sees this as an impediment to the business
which is concerning because there really isn't much else that would fit there other than this type
of business.
Ms. Propp said that she was not talking about extending it all of the way to the back of the
building.
ITEM - SIP Amendment — 900 N. Koeller Street 16
Mr. Hinz asked staff what the long buildings are where the greenery stops to the south of
Sawyer Creek.
Mr. Lyons replied that the buildings are apartments.
Mr. Hinz stated that it is all blocked off with trees already so it's not adding more buffer
visually.
Mr. Lyons stated that there are options like curbing and adding green space for the commission
to consider. He said that if the concern is specific to water run-off, then more curbing could be
added. He said that it is one of the things that the current code requires, but when this site was
approved it was not required.
Ms. Davey asked if curbing would offer the same protection to the waterway that green space
would.
Mr. Lyons replied that it would not be as effective, but it would be better than doing nothing.
He said that the green space would need to be curbed as well.
Motion by Davey to amend the conditions to include green space to the end of the parking and
include curbing along the southern lot line.
Seconded by Mitchell.
Mr. Gierach stated that he does not know the specific areas in question as far as square footage
of disturbance. He said that if the commission decides to add the green space to buffer along the
entire parking lot, code has a 20,000 square foot impervious disturbance limit and once you hit
that threshold the storm water requirements come into play. He said that adding all of this may
have greater implications down the line for any development or uses in the future.
Mr. Lyons added that the cost of the project could increase significantly.
Mr. Gierach stated that with what's proposed right now, code requires treatment of the water
on driving aisles and parking areas. He said that even if it surpasses 20,000 square feet right
now going from a parking aisle to a green space, treatment would not be required. He said that
what it could do is kick them into requirements sooner depending on what they do in the
future.
Mr. Mitchell stated that the storm water provisions are designed and intended to improve water
quality. He suspects there is a way this could be done so that it's not used as a tool to oppose
efforts that are being considered to improve water quality. He said that they're saying not to do
these because then the provisions to improve water quality will kick in, but that's what they're
there for.
Mr. Lyons replied that they are not saying not to do it, but they are trying to make sure Plan
Commission understands the full implications of doing it.
ITEM - SIP Amendment — 900 N. Koeller Street 17
Ms. Davey asked Mr. Gierach if not doing the curb to the end of the lot line and just doing the
green space would make a significant difference as far as their cost and not disturbing as much.
Mr. Gierach replied that he would need to know the dimensions. He said that what the
commission decides today may have implications down the road.
Motion withdrawn by Davey.
Seconded by Mitchell.
Motion by Davey to amend the conditions to include green space to the end of the parking.
Seconded by Mitchell.
Mr. Hinz stated that he is not against keeping the waterway clean, but he thinks that the
commission is moving the goalposts after the game has begun. He said that he will not be
supporting the amendment.
Mr. Ford stated that he agreed with Mr. Hinz. He said he was satisfied with the project being
consistent with the comprehensive plan including the environmental aspects that Mr. Mitchell
had mentioned. He said that they have come back with a plan that has less impervious space, so
it's actually an improvement on what they had approved in 2018. He said that because they
have the ability to trigger these new things and go above and beyond what they required
before, he does not think it is a smart precedent for the commission to set. He said that he will
not be supporting it.
Mr. Perry stated that he agreed. He said he was concerned about the precedent as well as
parking with the green space, so he will not be supporting the amendment.
Motion to amend conditions failed 3-6 (Ayes: Davey, Mitchell and Propp. Nays: Coulibaly, Hinz,
Ford, Kiefer, Perry and Stengel.)
Motion passed 8-1 (Nay: Mitchell).
ITEM - SIP Amendment — 900 N. Koeller Street 18
SUBMIT TO:
City Of Oshkosh Dept. of Community Development
215 Church Ave., P.O. Box 1 130
c`tof Planned Development Application °HONE: (
Oshkosh 920)236-5059
For General Development Plan or Specific Implementation Plan
**PLEASE TYPE OR PRINT USING BLACK INK**
APPLICANT INFORMATION
Petitioner: David Bynum
Petitioner's Address: 11700 W Capitol Dr City: Wauwatosa
Date:
State: V\A Zip: 53222
Telephone #: (414 ) 916-3292 Email: david_bynum@uhaul.com Contact preference: ❑ Phone ® Email
Status of Petitioner (Please Check): I I Owner [xRepresentative I_i Tenant Prospective Buyer `
Petitioner's Signature (required): --1 Date: �/ I �f 11'0
OWNER INFORMATION
Owner(s )
U-Haul International
Owner(s) Address:
2727 N Central Avenue
Telephone #: (602 ) 263-6555
City:
Phoenix
Date:
State: AZ Zip: 85004
Email: david bynum(c)-uhaul.com Contact preference: ❑ Phone ® Email
Ownership Status (Please Check): 1 Individual ;1 Trust I i Partnership X Corporation
Property Owner Consent: (required)
By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter
upon the property to inspect or gather other information necessary to process this application. I also understand that all
meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other
ndminktrntivP rPnsons_ _
Property Owner's Signature:
TYPE OF REQUEST:
❑ General Development Plan (GDP)
® Specific Implementation Plan (SIP)
SITE INFORMATION
Date: 6/V Y go
❑ General Development Plan (GDP) Amendment
A Specific Implementation Plan (SIP) Amendment
Address/Location of Proposed Project: 900 N Koeller St, OSHKOSH Wisconsin 54902
Proposed Project Type: Additional parking/shunting areas and LP tank installation
Current Use of Property: Indoor Storage Facility and Outdoor Display Zoning:
Land Uses Surrounding Your Site: North: Multi -family Residential & Institutional - MR-20 and I-PD
South: Commercial and Multi -family Residential - MR-20
East: Multi -family Residential - MR-20
West: Public Right-of-Way/Interstate 41-SMU
➢ It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal.
➢ Application fees are due at time of submittal. Make check payable to City of Oshkosh.
➢ Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE
For more information please visit the City's website at www.ci.oshkosh.wi.us/Community_Development/Planning.hfm
Sign k Staff Date Rec'd Cll�AV ZO
❑ Proposed grading plan.
❑ Specific landscaping plan for the subject site, specifying the location, species, and installation size of
plantings. The landscaping plans shall include a table summarizing all proposed species.
❑ Architectural plans for any nonresidential buildings, multi -family structures, or building clusters, other than
conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor
area, bulk, and visual character of such buildings.
❑ Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and
walkways.
❑ Signage plan for the project, including all project identification signs, concepts for public fixtures and signs,
and group development signage themes that may or may not vary from City standards or common
practices.
❑ Specific written description of the proposed SIP including:
• Specific project themes and images.
• Specific mix of dwelling unit types and/or land uses.
• Specific residential densities and nonresidential intensities as described by dwelling units per acre,
and landscaping surface area ratio and/or other appropriate measures of density and intensity.
• Specific treatment of natural features, including parkland.
• Specific relationship to nearby properties and public streets.
• Statistical data on minimum lot sizes in the development, the precise areas of all development lots
and pads; density/intensity of various parts of the development; building coverage, and
landscaping surface area ratio of all land uses; proposed staging; and any other plans required by
Plan Commission.
• A statement of rationale as to why PD zoning is proposed. This statement shall list the standard
zoning requirements that, in the applicant's opinion, would inhibit the development project and the
opportunities for community betterment that are available through the proposed PD project.
• A complete list of zoning standards that would not be met by the proposed SIP and the location(s)
in which such exceptions/base standard modifications would occur.
• Phasing schedule, if more than one development phase is intended.
❑ Agreements, bylaws, covenants, and other documents relative to the operational regulations of the
development and particularly providing for the permanent preservation and maintenance of common
open areas and amenities.
❑ A written description that demonstrates how the SIP is consistent with the approved GDP and any and all
differences between the requirements of the approved GDP and the proposed SIP.
I hereby certify that to the best of my knowledge all required application materials are included with this
application. I am aware that failure to submit the required completed application materials may result in denial or
delay of the application request.
Applicant's Signature (required): -� '_� �__ - Date:' `%
M N I. MIA�SiyT�
07ZW�
R11 � li"ZI
Tom.
r.
r�
SIP AMENDMT
900 N KOELLER ST
PC: 09-15-20
HILL PROPERTIES LLC
40 N HOLLY AVE
FOX LAKE IL 60020
U-HAUL INTERNATIONAL
2727 N CENTRAL AVE
PHOENIX AZ 85004
CI IARLES ANIARILYN I PERRY LIVING TRUST
1360 GREENWAY TER
ELM GROVE WI 53122
VICTOR/ELIZABETH CORTEZ
350 N COUNTRY LN
FOND DU LAC WI 54935
FATHER CARR'S PLACE 2 B LTD
1062 N KOELLER ST
OSHKOSH WI 54902
DAVID BRYNUM
11700 W CAPITOL DR
WAUWATOSA WI 53222
City of Oshkosh maps and data are intended to be used for general identification purposes only, and
the City of Oshkosh assumes no liability for the accuracy of the information. Those using the
information are responsible for verifying accuracy. For full disclaimer please go to
www.ci.oshkosh.wi.us/GlSdisclai mer
N
1 in=0.03mi
1in=150ft
Printing Date: 7/2/2020
Prepared by: City of Oshkosh, WI
Oshkosh
JJJ d jKJr—1 rr •�-
City of Oshkosh maps and data are intended to be used for general identification purposes only, and
the City of Oshkosh assumes no liability for the accuracy of the information. Those using the
information are responsible for verifying accuracy. For full disclaimer please go to
www.ci.oshkosh.wi.us/GlSdisclai mer
N
1 in=0.09mi
1 in=500ft
Printing Date: 7/6/2020
Prepared by: City of Oshkosh, WI
I n-I
,or
Oshkosh
» 0 � 11s E! E f, r
City of Oshkosh maps and data are intended to be used for general identification purposes only, and
the City of Oshkosh assumes no liability for the accuracy of the information. Those using the
information are responsible for verifying accuracy. For full disclaimer please go to
www.ci.oshkosh.wi.us/GlSdisclaimer
N
1 in=0.02mi
1in=120ft
Printing Date: 7/6/2020
Prepared by: City of Oshkosh, WI
Oshkosh