HomeMy WebLinkAbout08. 20-397 SEPTEMBER 22, 2020 20-397 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE PROFESSIONAL SERVICES AGREEMENT FOR SANITARY AND STORM SEWER MAIN AND LATERAL TELEVISING SERVICES/SPEEDY CLEAN DRAIN&SEWER, INC. ($123,112.50) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with Speedy Clean Drain and Sewer, Inc. for sanitary and storm sewer main and lateral televising in the amount of one hundred twenty-three thousand one hundred twelve dollars and fifty cents. ($123,112.50). Acct. No. 03210410-6802-04091 Contract Control-Sanitary Sewer 03210410-6803-04091 Contract Control-Water Main 03231717-7216-63001 Land Improvement-Parking Lot Improvements Cityo Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer i�l DATE: September 17, 2020 RE: Approve Professional Services Agreement for Sanitary and Storm Sewer Main and Lateral Televising Services / Speedy Clean Drain & Sewer, Inc. ($123,112.50) BACKGROUND The Department of Public Works requested proposals from nine (9) National Association of Sewer Service Companies (NASSCO) certified sewer inspection firms to inspect sanitary sewer and storm sewer mains and laterals via closed circuit televising and to locate laterals. All employees working on this project are required to be NASSCO-certified in the inspection of pipes (NASSCO PACP) and laterals (NASSCO LACP). The work is in preparation for design and construction of projects included in the proposed 2021 Capital Improvement Program (CIP). ANALYSIS Proposals were received from three (3) sewer inspection firm(s). Staff has recommended the agreement be awarded to Speedy Clean Drain & Sewer, Inc. The work associated with this agreement is anticipated to be complete by the spring of 2021. The work includes locating all existing storm and sanitary laterals and video inspection of all laterals. This work allows the location of laterals to be known prior to starting construction. As a result, the construction can proceed faster and there is a reduced risk of missing a lateral reconnection. Missing a lateral reconnection could cause a sewer backup into the property owner's basement. FISCAL IMPACT The cost of these services is estimated not to exceed $123,112.50. Funding is available in the Sanitary and Storm Sewer and Property Improvement sections of the 2020 CIP. l:\Engmsenng\l & 1 Work \Sanitary Laterals \Televising\ 2021\2021 San & Storm Swr Mn & Let Page 1 of 2 Televising Eng Sery Agreemnt Memo _7-17-20.doa RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature may be procured without the use of formal, sealed quotes. I have reviewed this agreement and in accordance with Section 12-16 of the Code, I am hereby recommending the Common Council approve the award of this agreement. Approved, "'--rk A. Rohloff City Manager I[.c/ttt l:\Engireerjmg\1 & I Work\Sanitary Laterals \Televising\ 2021\2021 San & Storm Swr Mn & Lzt Page 2 of 2 Televising Eng Sery Agreemnt Memo_l-1]-20.docx *SPEEDY GU'FAN1 1380 EARL STREET 31ENASIIA, NI 54952 920-734.4707 000-371.4707 a %vw.stoeedvelcanine.4-um September 8, 2020 YOUR Fl/GG SERU/CE DRAIN & SEWER PROFESS/ONAG5 CGEAN/NG TEGEU/S/NG PIP,- PATCLI/NG �C/PPS 11yDR0-EXCAU,9rlAlG WATER JETTING FAR/y/ G/NES DE-SCAG/NG REc'CjvED 11 City of Oshkosh DEPr SEP 2020 215 Church Ave Ostikos �130 VVORKS Oshkosh, WI 54903 ONS�N Thank you for the opportunity to bid on the 2021 Oshkosh Capital Improvement Project. Speedy Clean has four CCTV trucks equipped with systems less than 6 years old. We have the most up to date equipment including several different cameras specifically designed for inspection of municipal sewer and industrial drain lines. This allows us to schedule multiple crews daily throughout the year. We continue to operate with the latest technology in main line and lateral launching technology from CUES including Pan & Tilt Lateral Cameras that limit the need to gain access to private residences to complete inspections. This amount of new equipment, as well as great support and employees, allows Speedy Clean to continually meet deadlines on schedule and on time. Our crews inspect over one million feet annually, including thousands of laterals. We have over 65 years combined experience in the CCTV industry. The qualifications and experience we have allows us to produce an exceptional product. Our CCTV technicians are NASSCO PACP, LACP and MACP certified. All of our jobs are completed under NASSCO guidelines and held digitally for 5 years. We specialize in working directly with engineers and planners to gather important information specific to each project. Our CCTV operators understand that each project has a purpose and we work diligently to obtain the information the customer is seeking. Brad Winkler — CCTV Manager. Brad is our lead camera operator televising sanitary and storm sewers, lateral launching and line locating. He came to us with background in surveying and a degree in Power Engineering. Brad is proficient in all aspects of the televising division, detail oriented and very knowledgeable in his position. He works directly with Bill, President of Speedy Clean, in bidding, schedules jobs working directly with the municipalities, contractors and engineers in order to best understand the purpose of their particular project. He is the trainer of new hires for the CCTV department. Brad is NASSCO PACP, LAPC & MACP certified. Paul Ebben — CCTV operator. Paul came to us with a degree in Business & Sports Management from UW- Ripon. He has been a CCTV technician since starting with us and is proficient in all aspects of the televising, lateral launching and line locating. Paul also works directly with contractors and engineers. He is NASSCO PACP, LAPC & MACP certified. COMMERICAL * INDUSTRIAL * MUNICIPAL * RESIDENTIAL Blake Peotter — CCTV operator, CIPP (cured in place pipe patch) installer and Service Technician, Blake is experienced in several areas of the company. Blake started with us part time during his junior and senior year of high school and joined full time after graduation. Blake is proficient in all aspects of the CCTV department. He spent 3 years working exclusively in the camera truck televising, lateral launching and line locating and is experienced in working with the contractors and engineers. He is NASSCO PACP, LAPC & MACP certified. In the past 2 years, he has become one of our top cured in place pipe (CIPP) repair technicians. Matt Stuckrath — CCTV operator. Matt has been a CCTV technician since starting with us in 2017. He has advanced to the televising and lateral launching part of the operation and is proficient in line locating. Ben Matson — CCTV support staff. Ben has worked in several areas of Speedy Clean and is currently working the back of the truck. He is proficient in line locating and learning the televising and launching part of the operation. Speedy Clean has secured the contract for Capital Improvement Project since 2015 with the City of Oshkosh. This is a pre-construction/planning project and consists of televising main line and lateral launching of sanitary and storm sewers. The project starts in December and is completed by the following March/April and consists of launching 200-500 laterals for each contract. We complete similar projects annually for the Village of Little Chute, Village of Combined Locks, Village of Fox Crossing, City of Kaukauna and McMahan Engineering. In 2018, we have completed several storm and sanitary sewer locating projects for underground utility construction for RK Enterprises, Neyers Construction, Michels Corp., M.J. Electric, and InterCon Construction. We also perform acceptance televising for contractors including PTS Construction, Carl Bowers Construction, Don Hietpas & Sons, Feaker & Sons as well as many others. Thankyou Brad Winkler CCTV Manager RECEIVED PROPOSAL COST BREAKDOWN FOR SANITARY AND STORM SEWER MAIN AND LATERAL TELEVISING S E P 112020 2021 CAPITAL IMPROVEMENT PROJECTSDEPT OF PUBLIC WORKS OSHhUSH, WISCONSIN OREGON STREET :asw ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. 1. Sanitary Sewer Manhole Set-up Each 15 $ Sanitary Sewer Main Line 2. Televising L.F. 3,300 $ w $ , 3. Sanitary Sewer Lateral Launch Each 22 .J $ 00 $ wo .� Sanitary Sewer Lateral 4. Televising L.F. 3,000 $ $ Sanitary Sewer Lateral Televising 5. From Inside the Building Set-up Each 7 $ o $ Sanitary Sewer Lateral Televising 6. from Inside the Building L.F. 1,000 $ o $ 0 7. Storm Sewer Manhole Set-up Each 16 $ Storm Sewer Main Line SD 8. Televising L.F. 2,450 $ S $ L 1 Q ` 9. Storm Sewer Lateral Launch Each 5 $ j v d $ W 10. Storm Sewer Lateral Televising L.F. 500 $ o $ Heavy Cleaning Less Than 36" 11. Diameter L.F. 630 $ ® $ o Heavy Cleaning Greater Than or 12. Equal to 36" Diameter L.F. 165 $ $ Q 13. Outfall Bagging 24" x 36" RCP Each 1 $1 5O $ w 14. Outfall Bagging 20" x 24" RCP Each 1 $ $ 6 v J SUBTOTAL: OREGON STREET Sn $/3+-7u I:\Engineering\I & I Work\Sanitary Laterals\Televising\2021 \RFP\Proposal Cost Breakdoivn_8-28-20.docx Page 1 of 12 WEST 9TH AVENUE ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. 1. Sanitary Sewer Manhole Set-up Each 23 $ a oZ $ Sanitary Sewer Main Line 2. 1 Televising L.F. 1 6,400 $ d 5 $ 3. Sanitary Sewer Lateral Launch Each 47 $ J00 � $ 00 v Sanitary Sewer Lateral 4. Televising L.F. 4,000 $ 0 $ 1p Sanitary Sewer Lateral Televising 5. From Inside the Building Set-up Each 15 so $ o Sanitary Sewer Lateral Televising 6. from Inside the Building L.F. 1,300 $ v $ o 7. Storm Sewer Manhole Set-up Each 12 $ 6 $ J, ! 00 Storm Sewer Main Line 8. Televising L.F. 1,600 $ v LIS- $ 9. Storm Sewer Lateral Launch Each 10 ,e $ AV •J $ 4QLQ0 10. Storm Sewer Lateral Televising L.F. 800 $ o $ Heavy Cleaning Less Than 36" 11, Diameter L.F. 260 $ o $ o Heavy Cleaning Greater Than or 12. Equal to 36" Diameter L.F. 250 $ $ 13 Outfall Bagging 42" RCP Each 1 $ 5 $ sv SUBTOTAL: WEST 9TH AVENUE $ I ��s" OD 1:\Engineering\I & I Work\Sanitary Laterals \Televising\2021 \ RFP\Proposal Cost Breakdo%vn_8-28-20.docx Page 2 of 12 CEAPE AVENUE ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. I 1. Sanitary Sewer Manhole Set-up Each 22 $ $ Sanitary Sewer Main Line 2. Televising L.F. 4,100 $ s $ 3. Sanitary Sewer Lateral Launch Each 108 $ $ Sanitary Sewer Lateral 4. Televising L.F. 7,100 $ $ Sanitary Sewer Lateral Televising 5. From Inside the Building Set-up Each 36 $ $ o Sanitary Sewer Lateral Televising 6. from Inside the BuildingL.F. 2,200 $ $ rev 7. Storm Sewer Manhole Set-up Each 20 $ $ S-200 Storm Sewer Main Line 8. Televising L.F. 3,400 $ 9. Storm Sewer Lateral Launch Each 20 $ JD0 N $ v a 10. Storm Sewer Lateral Televising L.F. 1,000 $ $ Heavy Cleaning Less Than 36" 11. Diameter L.F. 950 $ o Heavy Cleaning Greater Than or 12. Equal to 36" Diameter L.F. 170 $ $ 13. Outfall Bagging 5' x 8' Conc. Box Each 1 .+ $ a7 $ L14. Outfall Bagging 48" RCP Each 1 $ 1- (O $ SUBTOTAL: CEAPE AVENUE I:\Engineering\I & I Work\Sanitary laterals\Televising \2021 \RFP\Proposal Cost Breakdown _&2-20.doex Page 3 of 12 KNAPP STREET ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. 1. Sanitary Sewer Manhole Set-up Each 29 w $ $ Sanitary Sewer Main Line 2. Televising L.F. 4,800 $ $ 3. Sanitary Sewer Lateral Launch Each 55 $ $ 5 00 v Sanitary Sewer Lateral 4. Televising L.F. 3,500 $ $ o Sanitary Sewer Lateral Televising 5. From Inside the Building Set-up Each 15 $ $ Sanitary Sewer Lateral Televising 6. from Inside the Building L.F. 1,150 $ 0 $ v 7. Storm Sewer Manhole Set-up Each 1 40 $ jQ5, cam. $ Storm Sewer Main Line 8. Televising L.F. 6,600 _ $ ; L4 'S $ 9. Storm Sewer Lateral Launch Each 20 $ ) ' $ coo w 10. Storm Sewer Lateral Televising L.F. 1,000 $ $ Heavy Cleaning Less Than 36" 11. Diameter L.F. 1,750 $ $ 0 Heavy Cleaning Greater Than or 12. Equal to 36" Diameter L.F. 480 $ $ V 13. Outfall Bagging 18" CMP Each 1 $ j $ �� + 14. Outfall Bagging 24" Conc. Each 1 $ t $ J d SUBTOTAL: KNAPP STREET 1: \Engineering\ I& I Work\Sanitary Laterals\Televising\2021 \ RFP\ Proposal Cost Breakdown_&28-20.docx Page 4 of 12 ERIE AVENUE ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. 1. Sanitary Sewer Manhole Set-up Each 1 $ Sanitary Sewer Main Line U 2. TelevisingL.F. 350 ' ( $ , Ll ' $ 3. Sanitary Sewer Lateral Launch Each 7 $ ((� .0 $ I CO Sanitary Sewer Lateral 4. Televising L.F. 400 $ o $ Sanitary Sewer Lateral Televising 5. From Inside the Building Set-up Each 3 $ $ o Sanitary Sewer Lateral Televising 6. from Inside the Building L.F. 150 $ $ 0 7. Storm Sewer Manhole Set-up Each 1 $ w $ Storm Sewer Main Line LI `jam $-p 6 l 8. TelevisingL.F. 150 $ e $ 9. Storm Sewer Lateral Launch Each 1 $ J $ Uo 10. Storm Sewer Lateral Televising L.F. 50 $ V $ O Heavy Cleaning Less Than 36" 11. Diameter L.F. 50 $ $ C� SUBTOTAL: ERIE AVENUE I:\Engineering\I & I Work\ Sanitary Laterals \Televising\2021 \RFP\Proposal Cost Breakdown_8-2&20.docx Page 5 of 12 FLORIDA AVENUE ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. 1. Sanitary Sewer Manhole Set-up Each 6 $�j $ Sanitary Sewer Main Line 2. TelevisingL.F. 1,300 _ $ , Ll S $ 3. Sanitary Sewer Lateral Launch Each 12 $ Mo a Sanitary Sewer Lateral 4. Televising L.F. 900 $ $ o Sanitary Sewer Lateral Televising 5. From Inside the Building Set-up Each 4 $ $ (/ Sanitary Sewer Lateral Televising 6. from Inside the Building L.F. 300 ��11 $ V $ (, 7. Storm Sewer Manhole Set-up Each 7 $ S v $ S Storm Sewer Main Line 8. Televising L.F. 900 $ , s— $ U 9. Storm Sewer Lateral Launch Each 5 $ ID 0 $ 6 10. Storm Sewer Lateral Televising L.F. 250 $ $ Heavy Cleaning Less Than 36" 11. Diameter L.F. 300 $ $ SUBTOTAL: FLORIDA AVENUE $ 5 �Q A : I: \Engineering \ 1 & I Work\ Sanitary Laterals\Televising \ 2021 \ RFP\ Proposal Cost Breakdown_&-2&20.doc Page 6 of 12 RUGBY STREET ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. 1. Sanitary Sewer Manhole Set-up Each 5 w _ w $ �5 Sanitary Sewer Main Line 2. Televising L.F. 750 $ 0 `4 5- $ 3. Sanitary Sewer Lateral Launch Each 16 $ J100 $ Sanitary Sewer Lateral 4. Televising L.F. 900 $ $ 0 Sanitary Sewer Lateral Televising 5. From Inside the BuildingSet-upEach 5 ``�� $ V $ o Sanitary Sewer Lateral Televising 6. from Inside the Building L.F. 300 $ o $ v 7. Storm Sewer Manhole Set-up Each 7 sajS $ T Storm Sewer Main Line 8. Televising L.F. 950 $ o rj� $ q al 9. Storm Sewer Lateral Launch Each 7 w $ ,y $ 10. Storm Sewer Lateral Televising L.F. 350 so $ o Heavy Cleaning Less Than 36" 11. Diameter L.F. 300 $ $ o Heavy Cleaning Greater Than or 12. Equal to 36" Diameter L.F. 110 $ $ SUBTOTAL: RUGBY STREET I:\Engineering\I & I Work\Sanitary Laterals\Televising\2021 \RFP\Proposal Cost Breakdown_8-28-20.docx Page 7 of 12 SANDERS STREET ITEM DESCRIPTION UNIT EST, UNIT PRICE TOTAL PRICE QTY. I 1. Sanitary Sewer Manhole Set-up Each 5 $ �o 5 $ �5 Sanitary Sewer Main Line 2. TelevisingL.F. 1,300 S� $ , t` $ 3. Sanitary Sewer Lateral Launch Each 23 $ IDO $ C) co Sanitary Sewer Lateral 4. Televising L.F. 1,200 $ $ Sanitary Sewer Lateral Televising 5. From Inside the BuildingSet-upEach 7 ``^^,, $ V $ D Sanitary Sewer Lateral Televising 6. from Inside the BuildingL.F. 400 /� $ o $ v 7. Storm Sewer Manhole Set-up Each 1 $ $ a Storm Sewer Main Line _ w 8. Televising L.F. 300 $ +`J $ 9. Storm Sewer Lateral Launch Each 7 $ t-� r�, r_o l $ W 10. Storm Sewer Lateral Televising L.F. 350 $ $ 0 Heavy Cleaning Less Than 36" 11. Diameter L.F. 78 $ SUBTOTAL: SANDERS STREET l:\Engineedng\I & I Work\Sanitary Laterals\Televising\2021 \RFP\Proposal Cost Breakdown_8-28-20.docx Page 8 of 12 LAKE REST LANE ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. I 1. Sanitary Sewer Manhole Set-up Each 8 $ vu 6 .v $ vo w Sanitary Sewer Main Line 2. Televising L.F. 1,300 $ . L45 $ 5 w 1Heavy Cleaning less than 36" 3. diameter L.F. 450 $ 0 $ SUBTOTAL: LAKE REST LANE PARKING LOT IMPROVEMENTS �a $ ITEM DESCRIPTION UNIT EST, UNIT PRICE TOTAL PRICE QTY. 1. Storm Sewer Manhole Set-up Each 7 $ Storm Sewer Main Line 2. Televising L.F. 500 $ o 3. Storm Sewer Lateral Launch Each 3 $ �(J'W $ 4. Storm Sewer Lateral Televising L.F. 100 $ $ Q Heavy Cleaning less than 36" 5. diameter L.F. 175 $ $ f� SUBTOTAL: PARKING LOT IMPROVEMENTS $,2, L20 - 1:\Engineering\1 & I Work\Sanitary Laterals\Televising\2021 \RFP\Proposal Cost Breakdown_8-28-20.docx Page 9 of 12 BRADLEY STREET ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. I 1. Sanitary Sewer Manhole Set-up Each 9 $C12s $ j., () ' Sanitary Sewer Main Line 2. Televising L.F. 2,800 $ ,, y $ 3. Sanitary Sewer Lateral Launch Each 9 $ 0 $ Sanitary Sewer Lateral 4. Televising L.F. 700 $ $ Sanitary Sewer Lateral Televising 5. From Inside the Building Set-up Each 5 $ $ Sanitary Sewer Lateral Televising 6. from Inside the Building L.F. 250 $ 0 $ SUBTOTAL: BRADLEY STREET I:\Engineering\I & I Work\Sanitary Laterals\Televising\2021\RFP\Proposal Cost Breakdown_B-28-20.docx Page 10 of 12 OTHER MISCELLANEOUS PROJECTS ITEM DESCRIPTION UNIT EST. UNIT PRICE TOTAL PRICE QTY. I 1. Sanitary Sewer Manhole Set-up Each 10 $ JQ $ Sanitary Sewer Main Line 2. Televising L.F. 4,000 $ , y $ 3. Sanitary Sewer Lateral Launch Each 40 $ i 6 $ L 00 Sanitary Sewer Lateral 4. Televising L.F. 2,000 $ $ Sanitary Sewer Lateral Televising 5. From Inside the Building Set-up Each 15 $ $ Sanitary Sewer Lateral Televising 6. from Inside the BuildinE L.F. 750 $ o $ o Heavy Cleaning less than 36" 7. diameter L.F. 800 $ (� $ 0 SUBTOTAL: OTHER MISCELLANEOUS PROJECTS $ Rjosy I: \Engineering\I & I Work\sanitary Laterals\Televising\2021 \ RFP\ Proposal Cost Breakdown_8-28-20.docx Page 11 of 12 TOTALS SUBTOTAL: OREGON STREET $ 1 -' bsl S O SUBTOTAL: WEST 9TH AVENUE SUBTOTAL: CEAPE AVENUE $ SUBTOTAL: KNAPP STREET $ SUBTOTAL: ERIE AVENUE $ SUBTOTAL: FLORIDA AVENUE $ SUBTOTAL: RUGBY STREET $ SUBTOTAL: SANDERS STREET $ 15' 0 -7D SUBTOTAL: LAKE REST LANE $ SUBTOTAL: PARKING LOT IMPROVEMENTS $ c> SUBTOTAL: BRADLEY STREET $ SUBTOTAL: OTHER MISCELLANEOUS PROJECTS $ 0SD ✓ TOTAL PROPOSAL COST l/ I:\Engineering \1&I Work\Sanitary Laterals \Televising\2021\REP\Proposal Cost Breakdown_8-28-20.docx Page 12 of 12