Loading...
HomeMy WebLinkAbout2004-Building (basement bathroom)OSHKOSH ON THE WATER .lob Address 2388 ABBEY AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DENNISCBLOECHL Contractor STANLEY LEACH-BUILDER Category 140 - Interior Remodeling No 108108 Create Date 05/17/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Constructing a 10'x12' bathroom in the existing basement. A minimum of 7' ceiling height is required for 50% of the floor area. A of Work minimum ceiling height of 6'4" is required under any beams and/or ductwork. An exhaust fan will be installed. HVAC Contractor Electric Contractor Fees: Valuation Issued By: TRUCK ELEC Plumbing Contractor $2,900.00 Plan Approval $0.00 Permit Fee Paid Permit Voided ] $32.00 Park Dedication $0.00 Date 05/17/2004 Final/O.P. 00/00/0000 Parcel Id # 0613991500 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5099 SHERMAN RD OSHKOSH WI 54901 - 9755 Telephone Number 235-2530 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.