Loading...
HomeMy WebLinkAbout0107686-Building (patio)OSHKOSH ON THE WATER .lob Address 101 W 14TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CURT L JOHNSON Contractor OWNER Category 142 - Decks, Patios, Ramps No 107686 Create Date 04/27/2004 Plan Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Constructing a 3'x7' platform and steps off the rear of the house and installing a 13'4"x20' patio. All construction shall comply with local of Work and state building code requirements. A minimum of 48" of frost protection is required in addition to code compliant handrails and guardrails. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $1,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 04/27/2004 Final/O.P. 00/00/0000 Parcel Id # 0304410000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 101 W 14TH AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: lot ZONING: PROPERT~ONTRACTOR: CONSTRUCTION DATA: ~)New Construction [] Addition TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) [] Alteration COMPLIANCE CHECKLIST DEFICIENT r-~ use [] Lot Width [] Lot Area Lot Area Per Family [] Flood Plain [] Front Yard [] Front Yard Side Street COMMENTS: DEFICIENT ~I Rear Yard [] Side Yards [] Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards DEFICIENT [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting REVIEW AUTHORITY As per Saction 30-5 Enforcement of fhe City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. APPROVED Plan Commission Action Required [] DENIED Variance(s) Required REVIEWED BY: ~ 2003