AUGUST 25, 2020 20-353 20-380 PENDING
AUGUST 12, 2020 RESOLUTION
(CARRIED______ LOST_______ LAID OVER___7-0__ WITHDRAWN_______)
PURPOSE: APPROVE INSTALLATION OF NEW SIDEWALK: WEST
WAUKAU AVENUE, SOUTH SIDE, FROM BELLFIELD DRIVE TO
SOUTH WASHBURN STREET
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh as follows:
That sidewalks and handicap ramps be constructed according to the established
grade pursuant to Section 66.0907 of the Wisconsin Statutes, and the ordinances of the
City of Oshkosh on the following locations:
West Waukau Avenue, south side, from Bellfield Drive to South Washburn Street
r,A
City
0fV
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager/City Engineer
DATE: August 6, 2020
RE: Approve Installation of New Sidewalk:
West Waukau Avenue,south side, from Bellfield Drive to South Washburn Street
BACKGROUND
Per State Statutes, the Common Council is required to pass a resolution which approves the locations desired
for the installation of new public sidewalk. Emphasis for these installations has been curb/gutter streets so that
grading work can be minimized. Additionally, the City had an inquiry as to when sidewalks will connect this
area to the sidewalks on West 201h Avenue.
ANALYSIS
The 2020 program is proposed to install sidewalk and any necessary handicap ramps on the south side of West
Waukau Avenue, from Bellfield Drive to 460' west of South Washburn Street. This section will complete the
sidewalk installation in these blocks,improving pedestrian access. This sidewalk is the start of a larger initiative
to connect this part of the City to the rest of the City for safer pedestrian access. Moving forward, as funding
allows, this sidewalk would connect to South Washburn Street and then also to West 2081 Avenue.
FISCAL IMPACT
Funding is included in the 2020 Capital Improvement Program. Property owners are charged for 100% of the
sidewalk construction expense abutting their land and the City pays for handicap ramp installations at
intersections.
RECOMMENDATIONS
I recommend approval of the resolution.
Ap oved:
6"
Jo ' Fitzpa
Assistant City Manager
JLG/tlt
I:\Engineering\2020 CONTRACTS\20-06 Sidewalk Rehab\Project_lnformation\Correspondence\Memo\20-061nst of New Sidewalk_8-6-20.docx