HomeMy WebLinkAbout23. 20-380 AUGUST 25, 2020 20-353 20-380 PENDING AUGUST 12, 2020 RESOLUTION (CARRIED______ LOST_______ LAID OVER___7-0__ WITHDRAWN_______) PURPOSE: APPROVE INSTALLATION OF NEW SIDEWALK: WEST WAUKAU AVENUE, SOUTH SIDE, FROM BELLFIELD DRIVE TO SOUTH WASHBURN STREET INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: That sidewalks and handicap ramps be constructed according to the established grade pursuant to Section 66.0907 of the Wisconsin Statutes, and the ordinances of the City of Oshkosh on the following locations: West Waukau Avenue, south side, from Bellfield Drive to South Washburn Street r,A City 0fV Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager/City Engineer DATE: August 6, 2020 RE: Approve Installation of New Sidewalk: West Waukau Avenue,south side, from Bellfield Drive to South Washburn Street BACKGROUND Per State Statutes, the Common Council is required to pass a resolution which approves the locations desired for the installation of new public sidewalk. Emphasis for these installations has been curb/gutter streets so that grading work can be minimized. Additionally, the City had an inquiry as to when sidewalks will connect this area to the sidewalks on West 201h Avenue. ANALYSIS The 2020 program is proposed to install sidewalk and any necessary handicap ramps on the south side of West Waukau Avenue, from Bellfield Drive to 460' west of South Washburn Street. This section will complete the sidewalk installation in these blocks,improving pedestrian access. This sidewalk is the start of a larger initiative to connect this part of the City to the rest of the City for safer pedestrian access. Moving forward, as funding allows, this sidewalk would connect to South Washburn Street and then also to West 2081 Avenue. FISCAL IMPACT Funding is included in the 2020 Capital Improvement Program. Property owners are charged for 100% of the sidewalk construction expense abutting their land and the City pays for handicap ramp installations at intersections. RECOMMENDATIONS I recommend approval of the resolution. Ap oved: 6" Jo ' Fitzpa Assistant City Manager JLG/tlt I:\Engineering\2020 CONTRACTS\20-06 Sidewalk Rehab\Project_lnformation\Correspondence\Memo\20-061nst of New Sidewalk_8-6-20.docx