HomeMy WebLinkAbout0108064-Building (roof) � CITY OF OSHKOSH No 108064
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECOR ��p,ruN�
ON THE WATER Q
Job Address 1107 E NEW YORK AVE Owner ARLENE V MUELLER �re�D e 05/04/2004
------- ------ - ---
Designer Contractor OWNER �qTE
Category 141 -Exterior Remodeling Plan
Type � Building � Sign--- �_CanoPY � Fence ---- 0 Raze -_ _ - �
Zoning Class of Const: Size
Unfinished/Basement _ __ 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection �
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab 0 Pier � Other
� Concrete Block � Post � Treated Wood ----- ------ -
Occupancy Permit Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR/Late PermiU Replacing the existing roof.No structural work.Winkler Roofing did the job but did not have a contractor credential.
of Work The cimney will also be recapped and have a liner installed.
i
�
i
' --- - - —- ------ —J :
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $11,000.00 Plan Approval $0.00 Permit Fee Paid $79.00 Park Dedication $0.00
Issued By: Date 05/14/2004 Final/O.P. 00/00/0000
� Permit Voided j Parcel Id# 1110120000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enfo easement restrictions of which it is not a party,if you perform the work
described in t ' perm�tion within an e ent,the City strongly urges the permit applicant to contact the easement
holder(s)an to sec ssary appro efore sta ing such activity. �7 /
Signature Date ✓� (��
AgentlOwner
Address 1107 E NEW YORK AVE OSHKOSH WI 54901 -4030 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry},your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.