Loading...
HomeMy WebLinkAbout0108062-Building (roof) /�'� CITY OF OSHKOSH G�h No �osos2 5 Fa OSHKOSH BUILDING PERMIT -APPLICATION AND RECO q�,G��� ON THE WATER Job Address 1106 CEAPE AVE Owner JEFFREY L SLIFE � ate 05/13l2004 _____ Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building_ � Sign ' , Canopy � Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. j j Projection Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Fioating Slab �; Pier � Other � Concrete Block � Post !; Treated Wood ; Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 — —._.. _— - Use/Nature �FR! Residing and reroofing the house. No structural work. � of Work i i i , I— — _-- ----- ----- _ HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $15,000.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00 Issued By: qr� Date OS/13/2004 Final/O.P. 00/00/0000 —� �] Permit Voided i Parcel Id#0802690000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure y necessary approvals b fore starting such activity. Signature Date X ���" � � AgenVOwner Address Oshkosh WI 54901 -0000 Telephone Number To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.