Loading...
HomeMy WebLinkAbout0107973-Building (roof) C CITY OF OSHKOSH Op,NNF No 107973 co OSHKOSH BUILDING PERMIT - APPLICATION AND RECOR a m , ° ON THE WATER Job Address 931 MORELAND ST Owner GARY A BAHR j - %ate 05/10/2004 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. lill Projection Finished/Living - 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/Tear off and replace existing roofing on garage due to hail damage.* NO STRUCTURAL WORK. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: O Date 05/10/2004 Final /O.P. 00 /00 /0000 ❑ Permit Voided Parcel Id # 1309100000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the Ci y strongly urges the permit applicant to contact the easement holder(s) and to s necessary approv e fore rting such activity. Signature -0 . Date 5 T o r Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number 35 7,a 7 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.