Loading...
HomeMy WebLinkAbout04. 20-327 JULY 28, 2020 20-327 RESOLUTION CARRIED___7-0__LOST_______LAID OVER________WITHDRAWN________) PURPOSE: APPROVE GENERAL DEVELOPMENT PLAN & SPECIFIC IMPLEMENTATION PLAN APPROVAL FOR A PERSONAL STORAGE FACILITY FOR PROPERTIES (3 PARCELS) LOCATED AT THE NORTHEAST CORNER OF JACKSON STREET AND W. FERNAU AVENUE INITIATED BY: JARED VAN LANEN PLAN COMMISSION RECOMMENDATION: Approved w/conditions WHEREAS, the Plan Commission finds that the General Development Plan and Specific Implementation Plan for the proposed planned development for a personal storage facility for properties located at the Northeast corner of Jackson Street and W. Fernau Avenue, is consistent with the criteria established in Section 30-387(6) of the Oshkosh Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that a General Development Plan and Specific Implementation Plan for the personal storage facility for properties located at the Northeast corner of Jackson Street and W. Fernau Avenue, per the attached, is hereby approved with the following conditions: 1. BSM to allow the use: personal storage facility on a BP-PD-zoned parcel. 2. BSM to allow Class IV materials on only the east façade of Building A. 3. Class IV cladding materials shall not be permitted on the west, south and north facades of Building A. 4. Applicant shall install at least 300 landscaping points of year-round landscaping along the east façade of Building A. 5. Applicant shall install at a minimum one (1) planter island meeting code requirements in the parking area east of Building A so that no more than 180 linear feet are between landscaping areas. JULY 28, 2020 20-327 RESOLUTION CONT'D 6. Applicant shall install a six (6) foot tall solid fence between the north fagade of Building A and the plantings in the bufferyard along the north edge of the site. 7. For Buildings B, C, D and E, at least 15% of the fagade area for each street facing fagade shall consist of brick matching the brick used on Building A. 8. Lot combination shall occur prior to permit issuance. 9. Applicant shall submit a revised landscaping plan for Department of Community Development review and approval. 10. Applicant shall submit a revised code -compliant photometric plan for Department of Community Development review approval. 11. All on -building and freestanding signage shall meet ordinance standards. r,A Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Mark Lyons Planning Services Manager DATE: July 23, 2020 RE: Approve General Development Plan & Specific Implementation Plan for a Personal Storage Facility for Properties (3 parcels) Located at the Northeast Corner of Jackson Street and W. Femau Avenue (Plan Commission Recommends Approval) BACKGROUND The subject area consists of 3 parcels of 28,000 sq. ft., 49,500 sq. ft. and 102,300 sq. ft. that were previously used for residential purposes. The parcels are located along the Jackson Street corridor on the northeast corner of Jackson Street and W. Fernau Avenue. One of the parcels has a deteriorating single family home according to the applicant. The applicant's plans include demolition of this home. The surrounding area consists of mixed residential, commercial and industrial uses. The subject parcels are zoned Business Park with a Planned Development Overlay (BP -PD) and the 2040 Comprehensive Land Use Plan recommends Industrial land use for the subject property and surrounding properties to the north and east and Mixed Use to the west and south. The applicant came before the Plan Commission at workshops that were held at the December 3rd, 2019 and January 21st, 2020 Plan Commission meetings. At the workshops, the applicant explained his overall plans for the subject parcels. Staff had further discussions with the applicant and explained that a zone change for the subject parcels was the first step in the redevelopment process. The Plan Commission and Common Council approved a zone change to allow a Planned Development overlay for the three subject parcels at the May 19th, 2020 and June 9th, 2020 meeting respectively. ANALYSIS The applicant is requesting a General Development Plan and Specific Implementation Plan (GDP/SIP) to allow a personal storage facility that includes five new buildings on the subject site. The two-story westernmost building is approximately 24,000 sq. ft. includes offices, a call center, climate controlled storage units, a restroom, an elevator, heating and cooling. The four buildings to the east are single story personal storage facilities because personal storage facility City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://w .ci.oshkosh.wi.us is not a permitted land use on a BP -zoned parcel, a Base Standard Modification (BSM) is required to allow the proposed use. The proposed development would have a single access drive from W. Fernau Avenue on the south edge of the site. The 12 parking spaces proposed significantly exceed the 4 spaces required based on the largest employee shift on-site. The total proposed impervious surface area for the site is 67.53% of the lot area. The proposed site plan meets setback requirements for the BP District for both the building and paved area locations. The Department of Public Works will require finalized storm water management plans as part of the Site Plan Review process. The applicant will need to submit a revised landscaping plan and a revised code -compliant photometric plan for Department of Community Development review and approval. All on -building and freestanding signage shall meet ordinance standards. Commercial building design standards require facades to consist of at least 50% Class I materials. The standards prohibit the use of Class IV materials on commercial facades. Staff has discussed the proposed elevations with the applicant and explained that in exchange for permitting the land use (a personal storage facility on a BP -zoned parcel), the commercial design standards would apply for Building A. The applicant has requested a BSM to permit the use of Class IV materials (ribbed steel paneling) on the east elevation. Staff is not supportive of the requested BSM to permit the use of Class IV materials unless the applicant greatly enhances the building foundation landscaping along the east facade of Building A. The personal storage facility is not a permitted land use on a BP -zoned parcel and the property is located along Jackson Street on a prominent corridor leading into the city. The requirement that the project meet the commercial design standards is a means to justify the BSM required for the land use. Currently, the east elevation does not meet code and the applicant does not provide enough landscaping points to justify the requested BSM. Staff discussed with the applicant the possibility of widening the planting areas adjacent to Building A to accommodate more robust landscaping and additional point totals. The applicant stated that this would interfere with the turning radii for some of the semi -truck traffic he anticipates on- site. The mini -warehousing buildings located to the east of Building A would include steel paneling and staff would support allowing these buildings to meet the Industrial Design Standards since these buildings are located on the east side of the site and off of the main corridor. The buildings have to include at least 15% Class I materials on their street facing facades. Currently the buildings employ split face CMU which is not a Class I material. FISCAL IMPACT Approval of this project should result in an increase in assessed property value for the site and should require no additional city service provision. The owner is anticipating spending approximately $2.28 million on the development. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://w .ci.oshkosh.wi.us RECOMMENDATION The Plan Commission recommended approval of the General Development Plan and Specific Implementation Plan with findings and conditions at its July 21, 2020 meeting. Please see the attached staff report and meeting minutes for more information. Respectfully Submitted, //V�� Mark Lyons Planning Services Manager Approved:? i� Mark A. Rohloff City Manager City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://w .ci.oshkosh.wi.us ITEM: GENERAL DEVELOPMENT PLAN & SPECIFIC IMPLEMENTATION PLAN APPROVAL FOR A PERSONAL STORAGE FACILITY FOR PROPERTIES (3 PARCELS) LOCATED AT THE NORTHEAST CORNER OF JACKSON STREET AND W. FERNAU AVENUE Plan Commission meeting of July 21, 2020. GENERAL INFORMATION Applicants: Jared Van Lanen Property Owner: JJG Wisconsin LLC Action(s) Requested: The applicant requests approval of a General Development Plan and Specific Implementation Plan (GDP/SIP) to allow for a personal storage facility for 3 parcels (Parcel IDs 91519601801, 91519601802 and 91519601803) located at the northeast corner of Jackson Street and W. Fernau Avenue. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Type: The subject area consists of 3 parcels of 28,000 sq. ft., 49,500 sq. ft. and 102,300 sq. ft. (0.64 acres, 1.14 acres and 2.35 acres, respectively) that were previously used for residential purposes. The parcels are located along the Jackson Street corridor on the northeast corner of Jackson Street and W. Fernau Avenue. One of the parcels has a deteriorating single family home according to the applicant. The applicant's plans include demolition of this home. The surrounding area consists of mixed residential, commercial and industrial uses. The subject parcels are zoned Business Park with a Planned Development Overlay (BP -PD) and the 2040 Comprehensive Land Use Plan recommends Industrial land use for the subject property and surrounding properties to the north and east and Mixed Use to the west and south. The applicant came before the Plan Commission at workshops that were held at the December 3rd, 2019 and January 21st, 2020 Plan Commission meetings. At the workshops, the applicant explained his overall plans for the subject parcels. Staff had further discussions with the applicant and explained that a zone change for the subject parcels was the first step in the redevelopment process. The Plan Commission and Common Council approved a zone change to allow a Planned Development overlay for the three subject parcels at the May 19th, 2020 and June 9th, 2020 meeting respectively. The applicant has since filed for a General Development Plan and Specific Implementation Plan (GDP/SIP) to allow a personal storage facility on the three subject parcels. Subject Site (3 Parcels) Existing Land Use Zoning Vacant BP -PD Adjacent Land Use and Zoning Existing Uses Zoning Single family Residential (Town of Oshkosh, North Institutional (Nova Counseling Services) ......... ......... ................. . SouthSingle family Residential, Elks 292, Accu -Tech ........................................................................................................................................................................................................................................................................................... EastLakeside Packaging Plus Inc. ........................................................................................................................................................................................................................................................................................... West Residential (Town of Oshkosh) County Zoning R -I (residential properties), SMU (Nova BP, HI, HI ..................................................... HI B-2, B-3 Comprehensive Plan Land Use Recommendation Land Use ' 2040 Land Use Recommendation Industrial AATAT VQ -TQ Lwet bk]r rio 151 175 The subject site consists of 3 contiguous parcels on the northeast corner of Jackson Street and W. Fernau Avenue. The corner parcel has frontage along Jackson Street and W. Fernau Avenue, while the parcel immediately east has frontage along W. Fernau Avenue. The parcel to the north has frontage along Jackson Street. All 3 parcels are currently zoned BP -PD after a recent zone change. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 2 Now that the zone change has occurred, the applicant plans to combine the three parcels into a single parcel and redevelop the site as a personal storage facility. The applicant requests Plan Commission and Common Council review and approve of a General Development Plan and Specific Implementation Plan. Use The applicant is proposing five new buildings on the subject site. The two-story westernmost building is planned for the corner of Jackson Street and W. Fernau Avenue and would have a footprint of approximately 24,000 sq. ft. This building would include offices, a call center, climate controlled storage units, a restroom, an elevator, heating and cooling. This building would have frontage on Jackson Street and W. Fernau Avenue and be the most prominent of the five buildings. The four buildings to the east are single story personal storage facilities. Three of these are approximately 9,120 sq. ft. and the easternmost building is 8,800 sq. ft. in area. The subject parcels are zoned BP -PD and the personal storage facility land use is not a permitted land use on a BP -zoned parcel, a Base Standard Modification (BSM) is required to allow the proposed use. Site Design/Access Above is the site plan proposed by the petitioner. The plan shows the five building proposed for the site. Building A is proposed for the west side of the site. The proposed development would have a single access drive from W. Fernau Avenue on the south edge of the site. Due to the proposed site layout, the lateral clearance as proposed (30 feet ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 3 rather than the 75 feet required by code) requires an access control variance if the development proposal is approved. The parking lot provided on the site plan provides for 12 parking spaces just east of Building A and these spaces would accommodate the four staff members that would work on-site. These spaces would also serve customers visiting Building A. Access drives would serve the four personal storage buildings and run between all four buildings. The applicant believes that the single access drive and 12 parking spaces will serve the needs of the development. The 12 parking spaces significantly exceed the 4 spaces required based on the largest employee shift on-site. However, in situations where less than 25 parking spaces are required, the parking maximums and Conditional Use Permit requirement do not apply. Therefore, the 12 proposed parking spaces would be permitted in this case. The total proposed impervious surface area for the site is 67.53% of the lot area. The BP district allows a maximum impervious coverage of 70% of the lot area. The plan as proposed appears to meet the impervious surface maximum allowed under BP zoning. Required Provided Front Setback (west) Minimum: 1 for each 30 ft. (Jackson Street) Street Side Setback (south) employee on largest 30 ft. (drive aisle along Fernau) Side Setback (north) shift (4 total for 4 10 ft. (drive aisle) Parking Spaces employees) 12 Spaces Impervious Surface Maximum 70% of lot 67.53% of lot Building Height Maximum: 45 ft. 32 ft. The parking lot provided on the site plan provides for 12 parking spaces just east of Building A and these spaces would accommodate the four staff members that would work on-site. These spaces would also serve customers visiting Building A. Access drives would serve the four personal storage buildings and run between all four buildings. The applicant believes that the single access drive and 12 parking spaces will serve the needs of the development. The 12 parking spaces significantly exceed the 4 spaces required based on the largest employee shift on-site. However, in situations where less than 25 parking spaces are required, the parking maximums and Conditional Use Permit requirement do not apply. Therefore, the 12 proposed parking spaces would be permitted in this case. The total proposed impervious surface area for the site is 67.53% of the lot area. The BP district allows a maximum impervious coverage of 70% of the lot area. The plan as proposed appears to meet the impervious surface maximum allowed under BP zoning. The proposed site plan meets setback requirements for the BP District for both the building and paved area locations. Storm Water Management/Utilities Storm water management plans have been provided and are being reviewed by the Department of Public Works. The applicant has been in discussion with the Department of Public Works regarding storm water management for the area. The Department of Public Works will require finalized storm water management plans for submission and approval as part of the Site Plan Review processes. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 4 Minimum Provided Front Setback (west) 30 ft. 30 ft. (Jackson Street) Street Side Setback (south) 30 ft. 30 ft. (drive aisle along Fernau) Side Setback (north) 10 ft. 10 ft. (drive aisle) Rear Setback (east) 25 ft. 41 ft. (rear of Building D) The proposed site plan meets setback requirements for the BP District for both the building and paved area locations. Storm Water Management/Utilities Storm water management plans have been provided and are being reviewed by the Department of Public Works. The applicant has been in discussion with the Department of Public Works regarding storm water management for the area. The Department of Public Works will require finalized storm water management plans for submission and approval as part of the Site Plan Review processes. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 4 Landscaping Jackson/W. Fernau Landscaping Points Required Points Proposed 2,536 linear feet of foundation / 100 x 40 = 40 points per 100 linear feet - 1,015 total points (507.5 on side of main 1,027 (274 on side of main entrance, 253.75 on street entrance, 618.3 on street facing Building Foundation facing sides) sides) 342 (97.5 points tall trees, 342 (210 points tall trees, 132 Paved Area 129.6 points shrubs) points shrubs) Street Frontage (Jackson Street) 288 (144 points medium trees) 300 (300 points tall/medium trees) Street Frontage (W. Fernau Avenue 620 (310 points medium trees) 650 (650 points tall/medium trees) Total Street Frontage 908 (454 points medium trees) 950 (950 points tall/medium trees) 1,480.2 (1,380.2 leftover points from arborvitae buffering the 60,161 sq. ft. of building single-family property, 100 from Yards /1,000 x 20 - 1,204 points the bioswale) 137.8 points along single family 0.4 opacity - BP/Single Family property (53 points per 100 linear requirement (53 points per feet) 46 arborvitae and 18' 100 linear feet, 10' bufferyard bufferyard width, 6' tall slatted width, and 6' tall solid fence), chain link fence and 10' bufferyard Bufferyards 0.1 - BP/SMU requirement width along SMU property Total Points 3,606.8 Points 3,937 Points 0 .._ ,�... _-.I—._. C_� __j _ Q n Bml,mg B Bmldmg G B zT, D A' Fernau Ain. B.o Fdter C—T ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 5 Building Foundation The landscape plan meets the total point requirement for the building foundation. The landscaping ordinance also specifies that 25% of the required must be on the side facing the public street and 50% of the required points must be located along the main entrance side of the building or in this case the south facade of Building A. Of the building foundation landscaping, 618.3 points are proposed for street facing facades. The landscaping therefore exceeds the ordinance requirement for street facing facades. For the main entrance side, 274 points are provided. This is short of the 507.5 points required for the side with the main entrance. The proposal is for a personal storage facility with multiple buildings and hence a large amount of building foundation footage. The access doors for the personal storage buildings preclude the installation of building foundation landscaping along a significant portion of the lengths of these buildings. Staff is of the opinion that the applicant could attain the required landscaping points along the south side of Building A (near the main entrance) by choosing different plant species that yield higher point totals and by widening the planting beds to accommodate them. For example, the applicant could include arborvitae along the south facade of Building A to meet the requirement. Staff would not support a BSM for a deficiency in points along the main entrance side. Paved Area The proposal meets the paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area. The code states that 30% of required points shall be devoted to tall trees and 40% to shrubs. The proposal meets both of these requirements. Landscape planter islands are required at the ends of all parking rows, driveway entrances and intermediate locations such that there is a maximum of 180 feet (20 parking stalls) between islands and each island shall include a tall deciduous/shade tree. The landscape plan shows a distance in excess of 180 feet along the east facade of Building A where pavement exists without planter islands. Staff would not support a BSM to permit this as it appears that the applicant has room to accommodate a planter island which would meet the code requirement. Street Frontage Code requires 100 landscape points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. The street frontage landscaping proposed consists entirely of trees and the point totals meet the point requirements. Yards Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area proposed for the site. The applicant provides 1,480.2 yard landscaping points which would exceed this requirement. Many of the yard landscaping points are derived from the arborvitae proposed for the bufferyard area along the single family property to the north. The points proposed greatly exceed the bufferyard requirement, so staff counted a number of them along with the proposed bioswale on the east side of the site towards the yard landscaping requirement. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage Bufferyard The subject site is adjacent to a single-family property to the north that runs approximately 260 feet along the north property line. The remaining 360 feet of property line is shared with a Suburban Mixed -Used (SMU) zoned institutional property. Ordinance requires a 0.4 opacity level for the bufferyard along the single family property. The applicant proposes a row of 46 arborvitae along the length of the single family property and meets the code required 53 points per 100 linear feet for a 10 foot wide bufferyard. The width of the proposed bufferyard on the north property line is 18 feet. However, ordinance requires a 6' tall solid fence for 0.4 opacity bufferyards less than 20 feet wide. The applicant would have to install the fencing or request a BSM to allow the landscaping and current bufferyard width of 18 feet without the 6' fencing. Staff would recommend requiring that the applicant install a 6' solid fence between Building A and the proposed arborvitae landscaping. For the SMU-zoned property abutting the remaining 360 linear feet along the north property line, a 0.1 opacity level is required. The applicant proposes a 10' green area and 6' tall slatted chain link fence along the SMU-zoned property. The 10' green area and 6' solid fence would meet a 0.2 opacity requirement and exceeds the 0.1 standard prescribed by code. The above photograph shows what the applicant is proposing for the bufferyard fencing. Signage The applicant initially submitted a sign package including a freestanding monument sign and on -building wall signage for Building A on the Jackson Street facade. The applicant later proposed wall signage for the south elevation of Building A also. Staff verified that the on - building wall signage on the west and south facades meets code based on the facades' linear footages. The applicant initially proposed a monument sign along Jackson Street but has removed the sign in his conversations with staff. Staff does not have concerns with the proposed signage. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage Note the signage proposed for the West (Jackson Street) and South (W. Fernau Avenue) elevations. The signage on the west and south elevations would meet code. Site Lighting 281.16 R 0.03 2.17 0.06 0.46 1.39 7.03 3.82 1.03 1.94 7.28 3.31 4.62 6.02 2.24 6.24 4.25 0.00 0.00 005 021 009 081 3.39 11 474 0.81 000 1.63 000 0.10 1 56 0.00 1 52 163 000 000 005 0.08 0.10 079 6.90 5.10 2.00 0.56 0.00 0.47 0.00 0.04 0.45 0.00 0.46 038 0.00 0.00 0040400.10068 1.43 260 082 0.29 0.00 0.18 0.00 0.02 017 0.00 0.19 016 0.00 0.00 002 003 010 077 4.55 237 049 018 000 0.10 0.00 0.01 008 0.00 014 010 0.00 000 002 003 VO 074 2M 216 0.38 0.12 0.00 0.10 000 0.01 0070.00 019 0 17 000 000 001 0030.09073 1 .46 205 033 0,08 000 016 000 0.02 015 000 044 040 0.000.00 0.01 0.02 0.08 0.62 5.32 2.04 0.27 0.05 0.00 0.43 0.00 0.03 037 0.00 1.43 1.52 0.00 0.00 001 001 005 035 0.76 1 36 021 004 000 1.45 000 0.03 1 16 0.00 541 439 000 000 001 nM 003 010 016 046 091 nm ono 6s4 non nog 4 A 0nn 7 R r,64 0A2 014 000 001 002 003 0.05 014 0 15 043 2.41 10 390 608 875 201 263 212 051 010 0.00 0.01 0.01 0.01 0.03 0.07 0.10 0.30 1.47 3.19 2.33 3.01 3.58 1.05 0.28 014 0.12 0.03 000 0.00 664 69 tt The applicant proposes a mixture of on -building wall packs and freestanding light fixtures for the site. The applicant's lighting consultant provided a photometric plan. The provided plan does not include enough information to serve as a useful means of verifying code compliance. Staff has repeatedly informed the consultant that the plan must include the photometric information superimposed on the site plan. The provided plan does not include all lighting values along what appears to be the north property line and no buildings, parking areas or access drives are displayed. Staff has informed the consultant that the plan will have to show lighting levels in relation to buildings, parking areas and access drives. If the GDP/SIP are approved, staff will require a code compliant photometric plan showing all lighting values as part of the Site Plan Review process. Based on the incomplete plan provided, light levels not far from the north property line appear to greatly exceed the 0.5 footcandle maximum light trespass permitted along the property line. Staff would not support a BSM for increased light trespass along the north property line as there is a single family residence along that lot line and the increased levels of light trespass could have a detrimental impact on that single family property. The 24 foot mounting height of the proposed freestanding light fixtures meets the code maximum of 25 feet for a BP -zoned parcel. The locations of the freestanding fixtures meet the required setbacks based on the applicant's latest submission. Staff would require a code - compliant photometric plan as part of the Site Plan Review process. ITEM- GDP/SIP Jackson and W. Fernau Personal Storage 8 Building Facades Commercial building design standards require facades to consist of at least 50% Class I materials. The standards prohibit the use of Class IV materials on commercial facades. Staff has discussed the proposed elevations with the applicant and explained that in exchange for permitting the land use (a personal storage facility on a BP -zoned parcel), the commercial design standards would apply for Building A. The applicant has requested a BSM to permit the use of Class IV materials (ribbed steel paneling) on the east elevation. The specific elevations breakdown is as follows: Jackson /W. Fernau Elevations Required Class Provided Class I Class IV (Prohibited) North 50% 50.1% 0.0% South 50% 55.4% 0.0% East 50% 0% 100% West 50% 56.8% 0.0% NORTH ELEVATION U EAST ELEVATION The elevations for Building Aare shown above. The applicant requests a BSM to allow Class IV materials for the east elevation. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage Staff is not supportive of the requested BSM to permit the use of Class IV materials unless the applicant greatly enhances the building foundation landscaping along the east facade of Building A. The personal storage facility is not a permitted land use on a BP -zoned parcel and the property is located along Jackson Street on a prominent corridor leading into the city. The requirement that the project meet the commercial design standards is a means to justify the BSM required for the land use. Currently, the east elevation does not meet code and the applicant does not provide enough landscaping points to justify the requested BSM. Staff discussed with the applicant the possibility of widening the planting areas adjacent to Building A to accommodate more robust landscaping and additional point totals. The applicant stated that this would interfere with the turning radii for some of the semi -truck traffic he anticipates on-site. NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 10 �IIIII�'lllllh NORTH ELEVATION SOUTH ELEVATION EAST WEST ELEVATION The elevations for the four mini -warehousing buildings are shown above. The mini -warehousing buildings located to the east of Building A would include steel paneling and staff would support allowing these buildings to meet the Industrial Design Standards since these buildings are located on the east side of the site and off of the main corridor. The buildings have to include at least 15% Class I materials on their street facing facades. Currently the buildings employ split face CMU which is not a Class I material. Overall Site The applicant is requesting the following BSMs. • To permit the land use - a personal storage facility on a BP -zoned parcel • To allow the use of Class W materials on the east facade of Building A Staff is of the opinion that the applicant must significantly increase the building foundation landscaping beyond ordinance requirements along the south and east facades of Building A in order to support granting a BSM to allow the proposed use and use of Class IV materials for the east facade of Building A. If the applicant is willing to make the required modifications to the proposal, staff does not have major concerns with the proposal. If the applicant is unwilling to install the landscaping along the south and east facades of Building A, staff would recommend denial of the GDP/SIP. FINDING S/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 11 (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City's Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. Staff recommends approval of the General Development Plan and Specific Implementation Plan with the findings listed above and the following conditions: 1.) BSM to allow the use: personal storage facility on a BP -PD -zoned parcel. 2.) BSM to allow Class IV materials on only the east facade of Building A. 3.) Class IV cladding materials shall not be permitted on the west, south and north facades of Building A. 4.) Applicant shall install at least 300 landscaping points of year-round landscaping along the east facade of Building A. 5.) Applicant shall install at a minimum one (1) planter island meeting code requirements in the parking area east of Building A so that no more than 180 linear feet are between landscaping areas. 6.) Applicant shall install a six (6) foot tall solid fence between the north facade of Building A and the plantings in the bufferyard along the north edge of the site. 7.) For Buildings B, C, D and E, at least 15% of the facade area for each street facing facade shall consist of brick matching the brick used on Building A. 8.) Lot combination shall occur prior to permit issuance. 9.) Applicant shall submit a revised landscaping plan for Department of Community Development review and approval. 10.)Applicant shall submit a revised code -compliant photometric plan for Department of Community Development review approval. 11.)All on -building and freestanding signage shall meet ordinance standards. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 12 The Plan Commission approved of the General Development Plan and Specific Implementation Plan with findings and conditions noted. The following is the Plan Commission's discussion on this item. Site Inspections Report: Mr. Groth and Mr. Hinz reported visiting the site. Staff report accepted as part of the record. The applicant requests approval of a General Development Plan and Specific Implementation Plan (GDP/SIP) to allow for a personal storage facility for 3 parcels (Parcel IDs 91519601801, 91519601802 and 91519601803) located at the northeast corner of Jackson Street and W. Fernau Avenue. Mr. Wiley presented the item and reviewed the site and surrounding area as well as the land use and zoning classifications in this area. The applicant is proposing five new buildings on the subject site. The two-story westernmost building is planned for the corner of Jackson Street and W. Fernau Avenue and would have a footprint of approximately 24,000 sq. ft. This building would include offices, a call center, climate controlled storage units, a restroom, an elevator, heating and cooling. The four buildings to the east are single story personal storage facilities. Three of these are approximately 9,120 sq. ft. and the other building is 8,800 sq. ft. in area. Personal storage facility is not permitted in BP -PD zoning, a Base Standard Modification (BSM) is required to allow the proposed use. The proposed development would have a single access drive from W. Fernau Avenue. The Department of Public Works will require finalized storm water management plans as part of the Site Plan Review process. The applicant shall submit a revised landscaping plan and a revised code -compliant photometric plan for Department of Community Development review approval. All on -building and freestanding signage shall meet ordinance standards. Commercial building design standards require facades to consist of at least 50% Class I materials. The standards prohibit the use of Class IV materials on commercial facades. The applicant has requested a BSM to permit the use of Class IV materials on the east elevation. Staff is not supportive of the requested BSM to permit the use of Class IV materials unless the applicant greatly enhances the building foundation landscaping along the east facade of Building A. The mini -warehousing buildings located to the east of Building A would include Class IV materials and staff would support allowing these buildings to meet the Industrial Design Standards since these buildings are located on the east side of the site and off of the main corridor. The buildings meet code for using at least 15% Class I materials on their street facing facades. He said staff recommends approval of the General Development Plan and Specific Implementation Plan with the findings and conditions listed in the staff report. Ms. Propp opened technical questions to staff. Mr. Perry asked where the snow would be stored. Mr. Wiley said it does show the location on the site plan in a few locations. Mr. Lyons pointed out on the site plan the snow storage areas. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 13 Mr. Perry said the areas on the east and south are a concern for him since Plan Commission has been notified about the moisture issues on the neighboring lot. He said he would hope that they could find a way to not increase the issue but maybe even find a way to decrease the issue with this development. Mr. Lyons explained the applicant has not provided final storm water management plans but will need to submit it prior to any construction on the project. He said the applicant has shown conceptual plans of where the drainage swale may take place but will need more specifics for the final storm water management plans. Mr. Wiley added he was just notified by Mr. Gohde from the Department of the Public Works that there are issues with the placement of the drainage swale by the bio retention area which is not acceptable and will have to be revised. He noted that the property owner from Lakeside Packaging Plus to the east of the property sent an e-mail about his concerns in regard to the snow storage areas/snow melt. He said the owner has had issues with flooding from the property on the corner due to the way it drains. Mr. Lyons commented that all Plan Commission members should have received a copy of that e-mail. Mr. Mitchell inquired about the sidewalks. Mr. Gohde explained in reading through staff comments it looks as if the right-of-way was being required to be graded to accommodate sidewalk in the future not that it would be installed just for this single lot at this time because it would not connect to anything. He said the site needed to be set up to accommodate with minimal changes. Mr. Lyons commented this is very common for similar sites like this. Mr. Mitchell said he didn't want the owner to put trees in to have to relocate them later. Mr. Lyons commended Mr. Mitchell for making a great point. He said as staff gets into the final plan set, they will ensure the trees are spaced out so they will be outside of where the established sidewalk grade needs to be. Mr. Mitchell inquired about the Bio Filter. Mr. Gohde explained what a Bio Filter was, how the system works and that it would look very similar to a rain garden from the surface. He said the City has some Bio Filters outside of the Field Operations facility on Witzel Avenue if anyone wanted to see any example. He explained they are typically a water quality element and not a water quantity element. Mr. Mitchell inquired about the plantings and about the type of species. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 14 Mr. Lyons explained the final design and planting have to be approved by the Department of Public Works along with an O&M (Operations and Maintenance) agreement which outlines a lot of those details. Mr. Gohde added O&M agreements are relatively new and explained their history. Ms. Propp commented she could not recall if there were three or four storage units during the workshop. Mr. Wiley explained there was originally three then it was increased to four. Ms. Propp said it looks crowded and that there may be an issue with snow storage/runoff. She said it is a concern and hopes the applicant can speak to it. Ms. Davey commented that had occurred to her as well. She said she is surprised with that much hard space, about 67%, that there wasn't something else because the Bio Filter is not that wide. She asked Mr. Gohde if the Bio Filter is the same thing that is located outside of the Coughlin Center. Mr. Gohde replied it is very similar to the ones outside of the Coughlin Center but the ones at the Coughlin Center had a few features that made it slightly different. Mr. Lyons said it has not been engineered yet but the applicant is present and should be able to explain the civil plans and if the Bio Filter is that size or if it needs to grow. Ms. Davey questioned if there could be something that could be done elevation wise that would prevent moisture going to the property on the east. Mr. Lyons stated the City's storm water management requirement require that they have to maintain their water on site and it cannot flow onto the neighbor's property. Mr. Gohde explained more in depth about the requirements. Ms. Propp asked if there were any public comments and asked if the applicant wanted to make any statements. Jared Van Lanen (applicant), N1213 Mayflower Drive of Greenville, said he is with Fox Valley Storage. He thanked everyone for having him there and commended Mr. Wiley for helping him through this process. He said their vision is to establish a footprint in the City of Oshkosh. He said their facilities range from Appleton to Fond du Lac and they are growing to the point where they need an office facility to house staff. He said they would like to have a central location and have that be in Oshkosh. He explained why the location of the site and the location of Oshkosh is ideal to them. He said building A is going to be the most prominent building with temperature control. He gave a brief overview of building B, C, D and E and stated that their properties are very well maintained. He said the civil engineer is present and can answer any questions related to storm water management. He said they have not gone ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 15 through the entire process for the storm water management because they are waiting on approval from the Plan Commission. Ms. Propp inquired about the amount of buildings on the property and questioned if one would have to be removed or revised if the storm water management cannot be accommodated. Mr. Van Lanen agreed with Ms. Propp that it is a derivative of what the site can handle. He said with them being under the maximum impervious surface, he believes the civil engineer will be able to accommodate the storm water requirements. He noted the building furthest to the east is only a westerly entry building and there is not any pavement along the backside of it. Ms. Davey asked if it was only one side facing if it was going to be twice as deep or if the site plan was not to scale. Mr. Van Lanen replied it is less depth and explained the sizes of each building. He also explained what types of items could be stored in each building depending on the size of the buildings. Ben Hamblin, 1445 McMahon Drive in Neenah, stated he is a civil engineer with McMahon Associates. He said he has been working on this site with Mr. Van Lanen. He reiterated there were staff comments but they held off on addressing them until they receive approval from Plan Commission. He said snow storage should not be an issue because there is room on the perimeter. He said they will remove the snow storage areas from the Bio Filter and detention areas. He explained more about the Bio Filter and how it works. He said the storm water device extends from the southeast to the northeast corner of the site and the site primarily drains from west to east. He said all the water from the site that used to drain to the east will not happen anymore because it will all be intercepted and routed through the storm sewer to W. Fernau Avenue. He said there shouldn't be any moisture issues with the property to the north. Mr. Mitchell asked for more information about the storm water being routed through the storm sewer on W. Fernau Avenue. Mr. Hamblin explained in the southeast corner in the right-of-way there is an existing yard drain which drains into the storm sewer within W. Fernau Avenue. He said they plan to remove the yard drain and directly connect to the outlet structure for the Bio Filter. There were no other public comments on this item. Ms. Propp closed public comments and asked if the applicant wanted to make any closing statements. Mr. Van Lanen reviewed the conditions. He said he does not have objections to conditions 1, 2, 3, 7, 8, 9, 10 and 11 but would like to discuss conditions 4, 5 and 6. He asked for an explanation of condition #4. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 16 Mr. Lyons explained more about Planned Developments and how they typically work. He said the applicant is requesting a Base Standard Modification, therefore, staff is requesting increased landscaping to offset the request. Mr. Van Lanen asked how he was deficient on the south side. Mr. Lyons replied it is the east side that is deficient and it is only the foundation landscaping points. Mr. Van Lanen inquired about the types of species. Mr. Lyons said staff can work with him on that. Mr. Mitchell asked about the island. Mr. Lyons said that is in condition #5. Mr. Van Lanen discussed condition #5 and said he wanted to share the semi tracking plan detail that shows how a semi would come in, back up and move in between building A and building B. He said it is imperative that they will be able to receive tractor/trailer type traffic. He said any island between building A and building B will not work for any flow of traffic. He shared the plan with Plan Commission and staff. Mr. Mitchell said he is surprised the island wouldn't be able to fit anywhere. He asked if there was already an island on the south side by the three parking stalls. Mr. Lyons replied there is not an island. He explained the code requirement for the island. He said the plan is deficient in that area and would need a Base Standard Modification granted for being deficient. Mr. Van Lanen explained his interpretation of an island. Mr. Lyons explained to Mr. Van Lanen what an island was and where it could be placed. Mr. Van Lanen said he understands now and does not have any objections. He inquired about condition #6 and for an explanation of the code. Mr. Lyons explained the code and the requirement for bufferyards and how they work. He said based on the calculations, a fence would be required and would have to be located on the interior side of the landscaping. Mr. Van Lanen asked if he could eliminate the need for a fence if he moved building A to the south 2 feet to create a 20 foot setback. Mr. Mitchell asked if the island could be similar to the islands behind Main Street where it is a depressed elevation and could potentially help with storm water. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 17 Mr. Lyons said there is a minimal planting requirement that is required within it which could also be used for rain gardens, bio swales and so on. Mr. Lyons reviewed the code requirements and explained the options available for Mr. Van Lanen. Mr. Wiley explained how staff calculated the landscaping. Mr. Lyons explained more about the alternative options. Motion by Hinz to adopt the findings and recommendation as stated in the staff report. Conditions: 1. BSM to allow the use: personal storage facility on a BP -PD -zoned parcel. 2. BSM to allow Class IV materials on only the east fagade of Building A. 3. Class IV cladding materials shall not be permitted on the west, south and north facades of Building A. 4. Applicant shall install at least 300 landscaping points of year-round landscaping along the east fagade of Building A. 5. Applicant shall install at a minimum one (1) planter island meeting code requirements in the parking area east of Building A so that no more than 180 linear feet are between landscaping areas. 6. Applicant shall install a six (6) foot tall solid fence between the north fagade of Building A and the plantings in the bufferyard along the north edge of the site. 7. For Buildings B, C, D and E, at least 15% of the facade area for each street facing fagade shall consist of brick matching the brick used on Building A. 8. Lot combination shall occur prior to permit issuance. 9. Applicant shall submit a revised landscaping plan for Department of Community Development review and approval. 10. Applicant shall submit a revised code -compliant photometric plan for Department of Community Development review approval. 11. All on -building and freestanding signage shall meet ordinance standards. Seconded by Kiefer. Ms. Propp asked if there was any discussion on the motion. Mr. Perry stated he still could not support this. He said this feels like a premature decision because Plan Commission has not reviewed the Envision North Jackson Plan and the corner lot is zoned Mixed Use with retail and neighborhood services. He said it does not seem to fit with the Envision North Jackson Plan plus there are a lot of BSMs that are being questioned. He said it also does not seem to fit with that particular area. Mr. Mitchell inquired about the elevations and questioned how staff would ensure the building materials that are proposed will be the ones used. Mr. Lyons said the applicant could address the elevations. ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 18 Mr. Van Lanen said he was not sure what sample Mr. Mitchell was referencing. He explained more about the materials that are going to be used. Mr. Mitchell inquired about the south elevation on the four buildings. Mr. Lyons explained condition #7 and said that condition addresses the south elevation. Mr. Hinz commended Mr. Van Lanen for the progress he has made since the workshop. He said Mr. Van Lanen has revised the plans drastically to satisfy Plan Commissions wants and needs. He stated he will support this request. Mr. Perry said he appreciates Mr. Hinz's comments but still feels as though the request does not fit into the general area for what is planned or developed for this particular part of the city. He appreciates the work Mr. Van Lanen has put into this and has nothing against the request but feels Plan Commission should review the Envision North Jackson Plan prior to making a decision on the request. He repeated that he currently cannot support this. Ms. Propp said she agrees with Mr. Hinz. She mentioned the Envision North Jackson Plan could take months to be approved. She said there has been issues along the way but Mr. Van Lanen has come a long way. She wished the Envision North Jackson Plan was approved before this request came to Plan Commission but it did not. She said she feels the development will blend in with the area. Mr. Kiefer commented it is a vast improvement over what is there now. He said this will fit into the area well as other developments in the area come forward. He said Plan Commission should move forward with this request and approve it. Motion carried 8-1 (Nay: Perry). ITEM— GDP/SIP Jackson and W. Fernau Personal Storage 19 SURMrTTO: 112 City of Oshkosh Dept. of Community Development 215 Church A�., Oshkosh Planned Development Application Oshkosh,M 5 901 0 Box 1130 For General Development Plan or Specific Implementation Plant9w123s-sosP APPLICANT INFORMATION "PLEASE TYPE OR PRINT USING BLACK INK' / Petitioner:- ^`r4G / '/ - Date: /. /rte/7n Petitioner's Address:tl/Zyi! �-r�e� � /� (_Jr/ — q D� City: ` %�-- Siate:1e1611P: �'/L' Telephone #: (/4%) 2 --ti-$-! Emaii: ��i7QY® —�� G" Contact preference: ❑ Phone R Email Status of Petitioner (Please Check): D Owner D Re (es ' tatie a�t ive ❑ D Prospective Buyer Petitioner's Signature (required): Mr6 Date: OWNER INFORMATION Owner(s): —7;9/ L_ / j / Date: _V Owner(s) Address: / -r/; . 3��� City: _State: ,zip: Telephone #: (JyQ �Z� Emon: li D L i 9^'^°W&o refertence: QPhone ❑Emaif Ownership Status (Please Check): D Individual D Trust D Partnership JJOCorporaffon Property Owner Consent: (required) By signature hereon, I/We acknowledge that City Officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner's Signature: i. r 1�.�i 4, Date: TYPE OF REOUE57i �q .��/J'Zlfl GLC `�� D General Development Pian (GDP) 13General Development Plan (GDP) Amendmenr Specific Implementation Plan (SIP) ❑ Specific Implementation Plan (SIP) Amendment SITE INFORMATION Address/Locatton of Proposed Project SIE ( :IQMM pQ -17AZA fa, Proposed Project Type: Current Use of Property:A -Zoning: Land Uses Surrounding Your Site: North: South: -41"4445 I5:.2�5.. — ihl�l QJSJ�i East:/ts Twa1uS»O/ West: iWWY 76 .4 i/ a/0.7...V9 ➢ It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal. D Application fees are due attime of submittal. Make check payable to City of Oshkosh. D Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City's website of vwvw.cLoshkosh.wi.us/Community_Development/Planninghtm Sign— Stott Date Recd June, 2020 Corner of Jackson and Fernau Narrative: Jared VanLanen is presenting to the City of Oshkosh the redevelopment of the Northeast corner of Jackson St. and Fernau Ave. The use of this site will be for a premium self- storage facility, encompassing temperature controlled storage and personal storage. Currently, 3 lots exist. One of the three lots consists of a degraded residential structure, an ugly outbuilding, and improper drainage. Part of the redevelopment process will be to remediate the old garage and home. The 3 lots will become combined into a single tax parcel. Through the site design process, the drainage issues will become resolved. The property is surrounded to the east and to the south by Heavy Industrial Zoning. To the west, is Town of Oshkosh, to the North, is Town of Oshkosh, and to the Northeast, is SMU (Suburban Mixed Use). Our proposal to put a premium self -storage facility at this location presents itself incredibly well as a buffer between the Heavy Industrial Zoning and the future land uses to the west. A Jackson St. driveway and two Fernau Ave. driveways currently exist. For the safety of all, the plan is to eliminate the Jackson St. driveway and one of the Fernau Ave. driveways. The driveway closest to Jackson Street will be moved further to the east to allow clear access and visibility. Through many modifications and communication with staff, we believe the aesthetics of the buildings, most notably Building "A", to be at the highest standards to the industry and among the highest standards in the Jackson Street corridor. The site will consist of 5 buildings in total. The elevations of all the buildings are included with this submittal. Building A, the furthest to the West, will be Fox Valley Storage's flagship building. It will hold our new call center, with 3 full time employees and 2 part time employees. This building will be a 2 story building served with an elevator, restroom, heating, and cooling. With the exception of the eastern (internal to the site) facade, the building is nearly entirely brick, Split faced block, and glass. It boasts an entry that is second to none. A Base Standard Modification may be needed for the East (internal) side of this Building A. Building B, C, D, and E will each serve the personal and business storage needs of the community. They will conform to all Base Standards required of them along the Fernau Street frontage. We are supplying ample parking. Chapter 30.81(C) requires that one space be provided for each employee on the largest work shift. Given that our largest work shift would be 4 employees, the parking as designed (12 hard spaces) is triple what code requires. This may help offset a Base Standard Modification if needed. The photometric plan which has been supplied is designed to meet code. We understand that a slightly different version of the plan has been requested. We are attempting to get an accepted version of this plan to staff yet this week. There are (7) 24' pole lights on the site which will provide site lighting for the eastern portion of the site. Building A will have a combination of wall packs, wall wash, and sign lighting. Landscaping is designed to meet the point total as defined in code. The northerly property line is composed of multiple land use classifications (Township, residential and Suburban Mixed Use). We've increased our plant total along the westerly portion (where the Township single family residence is) of the site. We're proposing a full height arborvitae wall and have moved Building A further off the lot line per staff's recommendation to offset the Base Standard Modification. July 13, 2020 Addendum A Corner of Jackson and Fernau Narrative Additional Items: A BSM (Base Standard Modification) is being requested to allow a personal self storage facility on the property currently zoned BP -PD (Business Park with a Planned Development Overlay). In May, we proposed a zoning change to BP -PD to give staff the ability to allow this BSM for the use which we are proposing. Through City Workshops and staff's review we believe we have a beautiful planset for which the City of Oshkosh will be able to permit this use. A BSM (Base Standard Modification) is being requested for the east sidewall of Building A. The materials proposed to be used on this sidewall are Class IV materials. They are internal to the site and will be covered up mostly by foundation landscaping. This sidewall will not be visible from Jackson Street. It is important to us incorporate some of the same materials/colors across all the buildings on site to portray a continuum of the facility (and not separate business entities). I would be agreeable to a condition that no future free standing sign would be allowed on the Jackson Street frontage in return for allowing this BSM. An Access Control Variance is being requested. The 75' minimum which is required by code is requested to be at 30' as proposed on our plans. The buildings, parking, and paved areas are set back far enough off of Fernau Ave, that it will not impede traffic flow. It also will provide enough visual site path to alleviate any safety concerns. The "throat" of the driveway will be set at the 30' length. July 14, 2020 Addendum B Corner of Jackson and Fernau Narrative Additional Item: The BSM (Base Standard Modification) for Building A is being revised to the attention of the East sidewall only. The remaining 3 facades are now within code compliance of the Class I material requirements. In addition, the East sidewall is now being revised to include the use of 8% Glazing. In addition, in helping to offset this BSM request, our Yard landscaping proposal is inclusive of 414 excess points or 34% more than the 1,204 points required per code. GDP/SIP B & P ORDER OF ELKS INC BRIAN R WELKE NE CNR OF JACKSON ST & W FERNAU AVE 175 W FERNAU AVE 3185 JACKSON ST PC: 07-21-20 OSHKOSH WI 54901 OSHKOSH WI 54901 CARRIE A NICHOLSON 3168 JACKSON ST OSHKOSH WI 54901 LEE J KIENAST 2131 LIN WAY CT OSHKOSH WI 54904 ROBERT T MARTIN 4579 COUNTY RD N OSHKOSH WI 54904 JARED VAN LANEN N1213 MAYFLOWER DR GREENVILLE WI 54942 JERRY A DUGGAN 3141 JACKSON ST OSHKOSH WI 54901 NOVA COUNSELING SERVICES INC 3240 JACKSON ST OSHKOSH WI 54901 WALTER G ENGLER REV TRUST 6331 COUNTY ROAD M WINNECONNE WI 54986 JJG WISCONSIN LLC 3305 FUJITA ST TORRANCE CA 90505 LAKESIDE PACKAGING PLUS INC 1040 BREEZEWOOD IN NEENAH WI 54956 PINE APARTMENTS IV LLC 3389 COUNTY ROAD A OSHKOSH WI 54901 TOWN OF OSHKOSH 1076 COZY LN OSHKOSH WI 54901 r� J City of Oshkosh maps and data are intended to be used for general identification purposes only. and the City of Oshkosh assumes no iiablity for the accuracy of the informafion. Those using the information are responsible for verifying accuracy. For full disclaimer cease go to mm.c oshkosh.m.us.GISoisclainner FRT N A 1in=0.03 mi lin=150ft Printing Date: 612312020 Prepared by: City of Oshkosh, WI aii. Jr Oshkosh