Loading...
HomeMy WebLinkAbout0107953-Building (roof)OSHKOSH ON THE WATER .lob .Address 656 GRAND ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MATHEW CRANE / STEPHANIE KAMETLER Contractor OWNER Category 141 - Exterior Remodeling No 107953 Create Date 05/07/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Res/Repair storm damaged section of roof. Install new sheeting, felt and shingles. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $265.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 05/07/2004 Final/O.P. 00/00/0000 Parcel Id # 0405310000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 656 GRAND ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.