Loading...
HomeMy WebLinkAbout0107869-Building (sign)OSHKOSH ON THE WATER .lob .Address 145 W 24TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner BETHANY UN CHURCH OF CHRIST Contractor OWNER Category 254 - Signs No 107869 Create Date 05/05/2004 Plan Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required Not Required 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab ~ Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain No Height Permit # Dwelling Units 0 # Structures Size 16 sq ff ~ Projection Canopies Signs Not Required Use/Nature Sign/Construct 16 sq ft ground sign as per plan. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $100.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 05/05/2004 Final/O.P. 00/00/0000 Parcel Id # 1411450000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 145 W 24TH AVE OSHKOSH WI 54902 - 7211 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: New Construction Addition Alteration ZONING :.~__~_~ __ TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)~ COMPLIANCE CHECKLIST DEFICIENT Use Lot Width Lot Area Lot Area Per Family Flood Plain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Mechanical Equip. Screening COMMENTS REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. __yAPPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: