HomeMy WebLinkAbout0107883-Building (siding) CITY OF OSHKOSH No 107883
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD SGT 0
ON THE WATER a(/( j 0
Job Address 931 MORELAND ST Owner GARY A BAHR Cree,JQate 05/06/2004
Designer Contractor OWNER
Category 141 - Exterior Remodeling Plan
Type 0 Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection
Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature SFR / INSTALL SIDING ON HOUSE AND GARAGE, REPLACING WOOD WITH VINYL, NO STRUCTURAL CHANGES
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00
Issued By: Date 05/06/2004 Final /O.P. 00 /00 /0000
❑ Permit Voided I Parcel Id # 1309100000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ec re any necessary approvals before starting such activity.
Signature . C\ \.3c. Date 5 ~ (c - 0 7
Agent/Owner
Address Oshkosh WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection it not performed within two business days from the time the project is ready.