Loading...
HomeMy WebLinkAbout0107856-Building (driveway) " � CITY OF OSHKOSH No 107856 � OSHKOSH BUILDING PERMIT - APPLICATION AND RECO ,� ON THE WATER ^ O Job Address 416 W 7TH AVE Owner CHARLES M/CHRIS ESSELMAN � �re Date 05/05/2004 Designer Contractor OWNER . Category 256-Parking Lots,Driveways Plan Type � Building 0 Sign _ � Canopy � Fence � Raze � — -- --__ _ ___� Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete 0 Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood ---- ---_ _ Occupancy Permit Flood Piain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/ Paving the existing driveway with concrete. The driveway is not being expanded. �I . of Work i ; i j I �' � HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 05/05/2004 Final/O.P. 00/00/0000 ❑ Permit Voided; Parcel Id#0905660000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. : While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. � __---• � Signature k , =%� � '`� Date ?C J S'�_ o� ��� o � AgenUOwner Address 182 N OAKWOOD RD OSHKOSH WI 54904 - 7831 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.