HomeMy WebLinkAbout0107856-Building (driveway) " � CITY OF OSHKOSH No 107856
�
OSHKOSH BUILDING PERMIT - APPLICATION AND RECO ,�
ON THE WATER ^
O
Job Address 416 W 7TH AVE Owner CHARLES M/CHRIS ESSELMAN � �re Date 05/05/2004
Designer Contractor OWNER .
Category 256-Parking Lots,Driveways Plan
Type � Building 0 Sign _ � Canopy � Fence � Raze �
— -- --__ _ ___�
Zoning Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete 0 Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood ---- ---_ _
Occupancy Permit Flood Piain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR/ Paving the existing driveway with concrete. The driveway is not being expanded. �I .
of Work i
;
i j
I
�' �
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00
Issued By: Date 05/05/2004 Final/O.P. 00/00/0000
❑ Permit Voided; Parcel Id#0905660000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction. :
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
� __---• �
Signature k , =%� � '`� Date ?C J S'�_ o�
��� o
� AgenUOwner
Address 182 N OAKWOOD RD OSHKOSH WI 54904 - 7831 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.