HomeMy WebLinkAbout0107842 BOSHKOSH
ON THE WATER
.lob.Address 1633 NORTHPOINT ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner DEAN G/BETTY GLATTING
Contractor OWNER
Category 140 - Interior Remodeling
No 107842
Create Date 05/04/2004
Plan
Type ]~) Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Finishing off a room in the basement to serve as a playroom. Smoke detectors shall be provided to meet current code standards as the
of Work ceiling height will not measure 7'-0". I no finished area shall the height of the ceiling be lower then 6'-6".
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$2,500.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$32.00 Park Dedication $0.00
Date 05/04/2004 Final/O.P. 00/00/0000
Parcel Id # 1514550000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1633 NORTHPOINT ST OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.