Loading...
HomeMy WebLinkAbout0107842 BOSHKOSH ON THE WATER .lob.Address 1633 NORTHPOINT ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DEAN G/BETTY GLATTING Contractor OWNER Category 140 - Interior Remodeling No 107842 Create Date 05/04/2004 Plan Type ]~) Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Finishing off a room in the basement to serve as a playroom. Smoke detectors shall be provided to meet current code standards as the of Work ceiling height will not measure 7'-0". I no finished area shall the height of the ceiling be lower then 6'-6". HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,500.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $32.00 Park Dedication $0.00 Date 05/04/2004 Final/O.P. 00/00/0000 Parcel Id # 1514550000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1633 NORTHPOINT ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.