HomeMy WebLinkAbout2004-Building (driveway) /�', CITY OF OSHKOSH No io�aos
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD � �
ON THE WATER � - 1-
� `
Job Address 845 W 19TH AVE Owner SCOTT L NEY Create,D�e 5/03/2004
Designer Coniractor ANDERSON BROS INC
Category 256-Parking Lots,Driveways Plan
_.__ . _. — _ —__—___
Type � Building �` Sign '�-�. Canopy �.., Fence - ; Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. [—Projection 'I
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � PouredConcrete �_�� FloatingSlab �._; Pier _.� Other
�- ConcreteBlock �.-�� Post �.�� TreatedWood --- -- ----- -------
Occupancy Permit Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
___ .._..._ ._ __. �I
Use/Nature SFR/ Replacing the exisitng driveway,fronf stoop and sidewalk to the house with concrete. The driveway shall not be expanded.
of Work '
HVAC Contrector Plumbing Contractor ��
Electric Contractor
Fees: Valuation $8,000.00 Plan Approval $0.00 Permit Fee Paid $62.00 Park Dedication _ _ _._ �0.00
Issued By: �j� � Date 0S/03/2004 Final/O.P. 00/00/0000
\ _
[ Permit Voided���. Parcel Id# 1412840000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restnctions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to sec/u�r ;ny necessary approvals be ore starting such activity.
Signature � l��yL i > � -Q�✓� Date C ; �r�
gentlOwner
Address 845 W 19TH AVE OSHKOSH WI 54902 - 6720 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing, Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.