HomeMy WebLinkAbout0103054-Building (sunroom)OSHKOSH
ON THE~VATER
,lob Address 1515 CANDLELIGHT CT
Designer
Category
Type
Zoning
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAEL M MORSEA/ICKIE DU~q-ON
Contractor OWNER
111 - S ng e Family Addition
· Building ~ Sign
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation · Poured Concrete (~) Floating Slab
O Concrete Block (~) Post
Occupancy Permit Required
Park Dedication
Canopy O Fence O Raze
No 103054
Create Date 07/23/2003
Plan
Class of Const:
Rooms 0 Height
Bedrooms 0 Stories
Baths 0
O Pier O Other
(~) Treated Wood
Flood Plain
# Dwelling Units 0
0 Ft.
Size
[] Projection
Canopies 0
Signs 0
Height Permit
# Structures 0
Use/Nature ;FPJ LATE PERMIT/Constructing a 3 seasons room on a deck and pier foundation. (Dennis Gorges is doing the framing)
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: /'
$8,500.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $60.00 Park Dedication $0.00
Date 07/23/2003 Final/O.P. 00/00/0000
[] Permit Voided~
In the performance of this worl~.],Agree to perform all work pursuant to rules governing the described construction.
Signature ~. Date
.... /*' - AgentJOwner
Address Oshkosh WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
CONSTRUCTION DATA: ~ New Construction Addition Alteration
· TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) ~
COMPLIANCE CHECKLIST
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows; etc.,
when the use is conforming and when no change is proposed.
.~ APPROVED DENIED
Plan Commission Action Required
,Variance(s) Require~