Loading...
HomeMy WebLinkAbout0107806-Building (pool)OSHKOSH ON THE WATER .lob,Address 150 ROLLING GREEN CIR Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN E/CHERYL L CAINE Contractor THE POOL CENTER Category 252 - Pools-Above ground No 107806 Create Date 05/03/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Installing a 24' round above ground pool with 52" side walls in the rear yard. The pool will have a locking ladder when the pool is not in of Work use. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $5,517.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $50.00 Park Dedication $0.00 Date 05/03/2004 Final/O.P. 00/00/0000 Parcel Id # 0658240000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 150 ROLLING GREEN CIR OSHKOSH WI 54904 - 6556 Telephone Number 235-5610 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: PROPERT~'~)NTRACTOR: CONSTRUCTION DATA: ~ New Construction [] OF CONSTRUCTIOI (i ZONING: '~' {' Addition [] Alteration ! COMPLIANCE CHECKLIST .DEFICIENT [] Use [] Lot Width Lot Area [] Lot Area Per Family [] Flood Plain [] Front Yard [] Front Yard Side Street DEFICIENT [] Rear Yard [-] Side Yards [] Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards DEFICIENT [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting COMMENTS: REVIEW AUTHORITY Aa per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or intedor work when the uae is conforming and when no change in use ia proposed. (2) Maintenance items, e.g. aiding, windowa, etc., when the use is conforming and when no change is proposed, W APPROVED [] DENIED Plan Commission Action Required __ Variance(s) Required 2003