Loading...
HomeMy WebLinkAbout0107824-Building (driveway)OSHKOSH ON THE WATER .lob .Address 2600 HARRISON ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner GARY/CHRISTINE SCHAEFER Contractor OWNER Category 256 - Parking Lots, Driveways No 107824 Create Date 05/04/2004 Plan Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Paving the existing driveway with asphalt per the plan submitted. The driveway will not be wider than the garage. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $1,650.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $26.00 Park Dedication $0.00 Date 05/04/2004 Final/O.P. 00/00/0000 Parcel Id # 1519510000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2600 HARRISON ST OSHKOSH WI 54901 - 1608 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: PROPE RT~N~R/~ONTRACTOR: CONSTRUCTION DATA: [] New Construction [] Addition TYPE OF CONSTRUCTION: (i.e. fence, pool,~_Earking~_qt, sign, etc.) ZONING: Alteration COMPLIANCE CHECKLIST DEFICIENT Use Lot Width Lot Area [] Lot Area Per Family [] Flood Plain [] Front Yard Front Yard Side Street COMMENTS: DEFICIENT ~-~ Rear Yard ~-~ Side Yards I--I Building Area [-~ Parking Standards ~-~ Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards DEFICIENT [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use ia conforming and when no change in use i$ proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. PROVED DENIED Plan Commission Action Required __ Variance(s) Required REVIEWED BY: ~ ~/~_.-~"~ DATE: 2003 'IS NOSIM~IVH