Loading...
HomeMy WebLinkAbout0107776 BOSHKOSH ON THE WATER .lob .Address 2475 2485 WISCONSIN ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT L/AUDREYVEACH Contractor OWNER Category 140 - Interior Remodeling No 107776 Create Date 04/30/2004 Plan Type ]~) Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Duplex/2485 Address/ Finishing a portion of the basement to include a bedroom, bathroom and a rec room. Seperate permits are required for of Work electric, plumbing and HVAC. HVAC Contractor UNKNOWN??? Electric Contractor UNKNOWN???? Fees: Valuation $10,000.00 Plan Approval Issued By: Plumbing Contractor UNKNOWN $0.00 Permit Fee Paid Permit Voided $74.00 Park Dedication $0.00 Date 04/30/2004 Final/O.P. 00/00/0000 Parcel Id # 1219741000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.