HomeMy WebLinkAbout0107788-BuildingOSHKOSH
ON THE WATER
.lob Address 1295 TIMOTHY TRL
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner CARY R/SUSAN A KOPPLIN
Contractor KUESTER & KUESTER CO INC
Category 140 - Interior Remodeling
No 107788
Create Date 04/30/2004
Plan
Type [(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature
of Work
SFR/Remodeling the basement to provide a family room, bathroom, bedroom, and unfinished laundry area. A minimum of 8% light is required
in addiiton to code compliant egress for the bedroom. A minimum of 7' ceiling height will be provided. Combustion air may be required for the
utility room.
HVAC Contractor MARX MECHANICAL Plumbing Contractor SOPER PLUMBING
Electric Contractor WITZKE ELECTRIC INC
Fees: Valuation $20,000.00 Plan Approval $0.00 Permit Fee Paid $124.00 Park Dedication $0.00
Issued By: Date 04/30/2004 Final/O.P. 00/00/0000
Permit Voided
Parcel Id # 1341310000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 2168 HICKORY LN Oshkosh WI 54901 - 0000 Telephone Number
920-232-7300
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.