HomeMy WebLinkAbout0107755-Building (roof) � CITY OF OSHKOSH No 107755
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD�,��
ON THE WATER
U "�� \
�
Job Address 15 E NEW YORK AVE Owner KATHLEEN M WAVRUNEK �iv�te D,� 04/29/2004
Designer Contractor TOM DETTLAFF ROOFING °
Category 141 -Exterior Remodeling Plan
Type � Building � Sign � Canopy � Fence _ � Raze
--
Zoning _ Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection �
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier 0 Other
� Concrete Block � Post � Treated Wood
Occupancy Permit _ Flood Plain Height Permit
Park Dedication ___ #Dwelling Units 0 #Structures 0
Use/Nature �FR/ Removing and replacing the existing shingles on the house. No structural work. 1
of Work
�_--
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $3,200.00 Pian Approval $0.00 PermitFee Paid $38.00 Park Dedication $0.00
Issued By: Date 04/29/2004 Final/O.P. 00/00/0000
� Permit Voided I Parcel Id# 1003540000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work :
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure y necessary appr vals before starting such activity.
Signature � <. �,� Date ���—�9`dy
Ag t/ wner
Address 608 W 7th Ave _ Oshkosh WI 54902 - 0000 Telephone Number 235-7239
To schedule inspections please call the Inspection Request line at 236-5728 noting the Address,Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not perFormed within two business days from the time the project is ready.