HomeMy WebLinkAbout0107766-Building (18x22 room)OSHKOSH
ON THE WATER
.lob .Address 2301 UNIVERSAL ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner LIABILITY CO MULTI BLDG LIMITED
Contractor R J ALBRIGHT INC.
Category 211 - Alteration Industrial
No 107766
Create Date 04/29/2004
Plan
Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Factory/Install a 18x22 room to house an oil filled boiler. * Note: Room is not required to be rated as the building is sprinklered, Table 302.1.1
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$4,800.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$44.00 Park Dedication $0.00
Date 04/29/2004 Final/O.P. 00/00/0000
Parcel Id # 1328640000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 5711 GREEN VALLEY RD OSHKOSH WI 54904 - 0000 Telephone Number 231-8635
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.