Loading...
HomeMy WebLinkAbout49. Agreement with CBS Squaredr,ACit of Oshkosh MEMORANDUM DATE: June 4, 2020 TO: Honorable Mayor and Members of the Common Council FROM: Mark A. Rohloff, City Manager��-- RE: Professional Services Agreement for the Water Filtration Plant Boiler and HVAC Controls Replacement / CBS Squared, Inc. ($52,705) The Department of Public Works requested a proposal from CBS Squared, Inc. (CBS Squared) for professional services related to the replacement of the Water Filtration Plant boiler and HVAC controls. These services include assistance with the Public Service Commission application for construction authorization, assistance with permit submittals to the Wisconsin Department of Natural Resources, preparation of bidding documents, and review of bids for recommending contract award. CBS Squared was chosen because, after review of their qualifications, they demonstrated their knowledge and past project experience with similar projects at water treatment facilities. Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. In accordance with Section 12-16 of the Code, I am hereby submitting this report regarding this professional services agreement. Please contact me if you have any questions concerning this professional services agreement. N AR/smg LA Water Filtration\ WFP Boiler and HVAC Controls Replacement 2020 (CBS Squared)\Project_Information\Correspondence\Memo \CBS Squared Memo -Bid Sere Agreement" 20.d. CBS Squared Inc. atl CEIVE,D FEB 2 8 2020 11 TOP'um,1C WORKS Oshkosh Water Filtration Plant Boiler, Boiler Pump & Dehumidifier Rep[4 � Imp {I�Q Controls System Upgrades Project Scope for Professional Services This letter describes the professional services work for the project described in the scope of services below. SCOPE: The Oshkosh Water Utility is planning a Boiler Replacement and Building Automation System (BAS) Controls Replacement project at the Water Filtration Plant. The project consists of replacing three existing boilers, two hot water circulation pumps, associated variable frequency drives and the existing facility direct digital controls (DDC) Building Automation System (BAS). Two of the plant's ducted air handling style dehumidifiers that serve the pipe galleries will be replaced as part of this project. Individual heating devices and room controls in specific areas of the water filtration plant may also be replaced. We will complete an analysis of the Lab and chemical feed and storage area temperature inconsistencies and provide proposed recommendations and design solutions to resolve the temperature inconsistencies. The scope is for one construction project, if the project proceeds in multiple construction phases, additional fees will be required. The project is limited to the main Water Filtration Plant building which was constructed in the year 2000. The project scope is detailed below: Proiect Scope Items: Regulatory PSC Application for Construction Authorization $4,400 WDNR Submittal $1,100 Proiect Manual EJCDC 2013 V1 project manual — Incorporate City Edits $ 520 Ad for Bid — City will place ad in official publication $ 65 Instructions to Bidders $ 130 Pre Bid Meeting — Mandatory $ 350 Prequalification of Bidders — Utilize City Pre-Qual Process $ 285 EJCDC General Conditions $ 65 CBS Squared, Inc.Gb52 Professional Scope of Services Page 1 of 3 Ar Supplementary Conditions— Incorporate City Edits $ 720 Insurance Requirements — City has established limits which will be reviewed $ 135 Scope of Design Services: Construction Drawings will be completed on 22"x34" size drawing sheets. Specifications will be in three-part Construction Specifications Institute (CSI) format (DIV 22 — Plumbing, DIV 23 - HVAC, DIV 26 — Electrical, Etc.) Complete Construction Documents (Plans and specifications) for contractor bidding. Plans to be 22 x 34 and 11 x 17 format and electronic PDF format. All documents will be compiled for bidding and will be electronic (Word, Excel or PDF with pre -approval). City will post to Quest CDN for bidding. $980 Scope of Mechanical, Electrical. Plumbing (MEP) Design Services for Boiler & Other Equipment Replacement Proiect: Provide construction documents for demolition and replacement of: 1. Three (3) existing 2500 MBH input gas fired boilers and associated combustion air intakes and venting ducting 2. Existing main hot water system circulating pumps and VFD's (variable frequency drives) 3. Two (2) existing dehumidifiers Initial Site Survey, As -built Documentation $1,780 Drawing Setup and Draw Existing Equipment $2,830 Analysis Temperature of Lab and Chemical Feed Areas $2,100 Calculations for New Equipment $1,880 Select New Equipment using performance requirements and specifying specific models/brands and based on City staff input(Boilers, Pump, Dehumidifiers)$1,620 Opinion of Probable Construction Cost $1,570 Design and Layout Drawings of New Equipment $5,820 Details and Schedules $1,300 Specifications $2,850 Quality Control and Quality Assurance $2,800 Scope of MEP Design Services for DDC / BAS Controls replacement project: CBS Squared, Inc.Gb52 Professional Scope of Services Page 2 of 3 .,;; Provide construction documents (plans and specs indicating open protocol requirements for new controls system and adequate information for contractors to quantify number and locations and type of HVAC system devices and number of control "points" required for each piece of HVAC equipment) for competitive contractor bidding for replacement of the Water Treatment Plant's Direct Digital Control Building Automation System Drawing Setup and Draw Existing Equipment $1,580 Select New Equipment / Design $1,230 Opinion of Probable Construction Cost $1,410 Design and Drawings $3,260 Details and Schedules $ 750 Specifications $2,500 Quality Control and Quality Assurance $1,900 Design Review Meetings: Review Meeting 30% $1,120 Review Meeting 60% $1,340 Review Meeting 90% $1,650 Bidding: Bid Opening — Electronic using Quest CDN $ 350 Recommendation of Award $ 180 Notice of Award $ 145 Notice to Proceed $ 90 Expenses $1,900 Total $52,705 PAYMENT: The Project will be invoiced on a time and materials basis with a not -to -exceed fee of $52,705 including expenses and equipment. Expenses will be invoiced based on GSA per diem rates or actual cost and mileage per the current federal mileage rate. Schedule: The project is anticipated to begin on or about February 28, 2020. The Public Service Commission (PSC) approval process is approximately 6 months. Construction is planned for late summer/fall 2020 dependent on WI Public Service Commission approval. CBS Squared, Inc, cbs2 Professional Scope of Services Page 3 of 3 —� eft